Flow and Transport Through Unsaturated Fractured Rock (Geophysical Monograph Series) Evans, Daniel D.; Nicholson, Thomas J. and Rasmussen, Todd C.
Language: English
Published by American Geophysical Union, 2001
- Hardcover
- Used

Seller: JIM1024, WEST DES MOINES, IA, U.S.A.JIM1024
AbeBooks seller since March 21, 2025
Condition: Used - Very good
£ 47.49
Quantity: 1 available
Add to basketItem description from seller
Withdrawn from University library- very light board wear- interior is like new- sturdy & clean. SCI-4.
Seller Inventory # --sciennce-
- Title
- Flow and Transport Through Unsaturated Fractured Rock (Geophysical Monograph Series) Evans, Daniel D.; Nicholson, Thomas J. and Rasmussen, Todd C.
- Author
- Evans, Daniel D. [Editor]; Nicholson, Thomas J. [Editor]; Rasmussen, Todd C. [Editor];
- Publisher
- American Geophysical Union
- Publication year
- 2001
- Condition
- Very Good
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 0875909833
- ISBN 13
- 9780875909837
- Edition
- 2nd Edition
- Item weight
- 23 ounces
- Dimensions
- 10x8x0
- Series
- Book 106 of 266: Geophysical Monograph
This monograph is an update and revision of the first edition, Geophysical Monograph 42, on ground-water flow and transport through unsaturated, fractured rock, published by AGU in 1987. The first edition evolved from a special symposium held during the American Geophysical Union fall meetings in San Francisco in December 1986. Invited and contributed papers at that AGU session, as well as panel presentations, focused on conceptualizing, measuring and modeling flow and transport through unsaturated fractured rock. As noted in the preface to the first edition, "the expanded interest in the topic (water flow and contaminant transport through unsaturated fractured rock) was initiated when the U.S. Geological Survey proposed that deep unsaturated zones in arid regions be considered in the site selection for the first high-level, commercially generated radioactive waste repository." Much of the research reported in that first edition was motivated by the U.S. Department of Energy's program to investigate Yucca Mountain at the Nevada Test Site as a possible geologic repository for commercially generated, high-level radioactive waste. As noted in the overview paper of the first edition, "characterization methods and modeling are in their developmental stage with the greatest lack of knowledge being the interaction between fracture and matrix flow and transport properties." Although the first edition of this monograph reflected the state-of-the science, laboratory and field experimental programs were novel and limited and, in general, followed from the principles and methods developed in the soil science community.
"Synopsis" may belong to another edition of this title.
JIM1024
WEST DES MOINES, IA, U.S.A.
AbeBooks seller since March 21, 2025
Shipping rates within U.S.A.
| Item | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 5.86 | £ 11.34 |
Payment methods
Store description
Online bookseller since 1998, I pride myself on excellent & obscure inventory.
Seller's business information
JIM1024
IA, U.S.A.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to JIM1024, WEST DES MOINES, Iowa, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.