Floodplain Management: A New Approach For A New Era
Bob Freitag , Susan Bolton , Frank Westerlund ,
Language: English
Published by Island Press, 2009
- Softcover
- New

Seller: Basi6 International, Irving, TX, U.S.A.Basi6 International
AbeBooks seller since June 24, 2016
Condition: New
£ 35.39
Quantity: 1 available
Add to basketItem description from seller
New. US edition. Expediting shipping for all USA and Europe orders excluding PO Box. Excellent Customer Service.
Seller Inventory # ABEOCT25-177594
- Title
- Floodplain Management: A New Approach For A New Era
- Author
- Bob Freitag , Susan Bolton , Frank Westerlund ,
- Publisher
- Island Press
- Publication year
- 2009
- Condition
- Brand New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 1597266353
- ISBN 13
- 9781597266352
- Edition
- 2nd Edition
A flooding river is very hard to stop. Many residents of the United States have discovered this the hard way. Right now, over five million Americans hold flood insurance policies from the National Flood Insurance Program, which estimates that flooding causes at least six billion dollars in damages every year. Like rivers after a rainstorm, the financial costs are rising along with the toll on residents. And the worst is probably yet to come. Most scientists believe that global climate change will result in increases in flooding.
The authors of this book present a straightforward argument: the time to stop a flooding rivers is before is before it floods. Floodplain Management outlines a new paradigm for flood management, one that emphasizes cost-effective, long-term success by integrating physical, chemical, and biological systems with our societal capabilities. It describes our present flood management practices, which are often based on dam or levee projects that do not incorporate the latest understandings about river processes. And it suggests that a better solution is to work with the natural tendencies of the river: retreat from the floodplain by preventing future development (and sometimes even removing existing structures); accommodate the effects of floodwaters with building practices; and protect assets with nonstructural measures if possible, and with large structural projects only if absolutely necessary.
"Synopsis" may belong to another edition of this title.
About the Author
Robert Freitag is executive director of the Cascadia Region Earthquake Workgroup and director of the Institute for Hazards Mitigation Planning & Research at the University of Washington. He has recently developed a higher education course in floodplain management for FEMA, based on the principles articulated in this book.
Susan Bolton is a professor at the University of Washington in the Department of Forest Resources.
Frank Westerlund is the chair of urban design planning at the University of Washington. Julie Clark is a geologist.
"About the title" may belong to another edition of this title.
Basi6 International
Irving, TX, U.S.A.
AbeBooks seller since June 24, 2016
Shipping rates within U.S.A.
| Item | 3 to 6 business days | 5 to 14 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Payment methods
Store description
Professional Book Seller offering fast shipping and hassle-free returns for every order. Our 100% satisfaction policy guarantees that you get the best product and the best service at the best price!
Specialty
Educational and reference booksSeller's business information
Basi6 International LLC
1018 Camino Lago
Irving, TX U.S.A. 75039
Terms of sale
Basi6 Interntional LLC
(A Texas State LLC)
Contact Information:
Raman Arora
Basi6.int@gmail.com
+1-214-4998944
Registered Address:
1944 Lantana Ln,
Irving, TX 75063
Returns Address:
1944 Lantana Ln,
Irving, TX 75063
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Basi6 International, Irving, Texas, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.