Fell, R: Geotechnical Engineering of Dams
Language: English
Published by CRC Press, 2014
- Hardcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 411.55
Quantity: Over 20 available
Add to basketItem description from seller
Robin Fell is Emeritus Professor of Civil Engineering at the University of New South Wales, Australia, and also works as a consultant. He has more than 40 years of experience in geotechnical engineering of dams, landslides and civil and mining p.
Seller Inventory # 595366391
- Title
- Fell, R: Geotechnical Engineering of Dams
- Author
- Robin Fell (School of Civil and Environmental Engineering, University of New South Wales, Wahroonga, New South Wales, Australia)|Patrick MacGregor (Consulting Engineering Geologist, Australia)|David Stapledon (Consulting Engineering Geologist, Australia)
- Publisher
- CRC Press
- Publication year
- 2014
- Condition
- New
- Binding
- Gebunden
- Language
- English
- ISBN 10
- 1138000086
- ISBN 13
- 9781138000087
- Edition
- 2nd Edition
Geotechnical Engineering of Dams, 2nd edition provides a comprehensive text on the geotechnical and geological aspects of the investigations for and the design and construction of new dams and the review and assessment of existing dams. The main emphasis of this work is on embankment dams, but much of the text, particularly those parts related to geology, can be used for concrete gravity and arch dams.
All phases of investigation, design and construction are covered. Detailed descriptions are given from the initial site assessment and site investigation program through to the preliminary and detailed design phases and, ultimately, the construction phase. The assessment of existing dams, including the analysis of risks posed by those dams, is also discussed. This wholly revised and significantly expanded 2nd edition includes a lengthy new appendix on the assessment of the likelihood of failure of dams by internal erosion and piping.
This valuable source on dam engineering incorporates the 200+ years of collective experience of the authors in the subject area. Design methods are presented in combination with their theoretical basis, to enable the reader to develop a proper understanding of the possibilities and limitations of a method. For its practical, well-founded approach, this work can serve as a useful guide for professional dam engineers and engineering geologists and as a textbook for university students.
"Synopsis" may belong to another edition of this title.
About the Author
Robin Fell is Emeritus Professor of Civil Engineering at the University of New South Wales, Australia, and also works as a consultant. He has more than 40 years of experience in geotechnical engineering of dams, landslides and civil and mining projects in Australia and Asia. He has worked on over 100 dams worldwide and has been involved in all aspects of planning, site investigation, design and construction of embankment dams.
Patrick MacGregor is a Consulting Engineering Geologist with more than 40 years experience in the assessment of geological constraints for major civil engineering projects in a number of countries. He has been involved in dam investigation, design and construction, and particularly worked on hydroelectric developments at all stages from inception to operation.
David Stapledon spent many years investigating large dam construction sites in various countries. He was a Professor of Engineering Geology at the University of South Australia (1964 -1993) and worked as a Consultant in Engineering Geology, contributing to major dam projects in Australia, New Zealand and South East Asia. He has more than 50 years of experience and was awarded the John Jaeger Memorial Medal for Contributions to Geomechanics in 1995.
Graeme Bell has been a Consulting Dam Engineer since 1962. His role has varied from providing the full technical input, design management and construction advice for new dams to the preparation of complex structural analyses of existing dams. From 1979, he has acted as an independent reviewer on many dam projects, mainly in Australia, but also in several overseas locations.
Mark Foster has 20 years of experience in dam engineering and geotechnical engineering. This has involved a wide variety of projects including dam safety reviews, design of dam upgrade projects and dam safety risk assessments for embankment and concrete dams. He has a particular interest in the assessment of piping and internal erosion of embankment dams which was the topic of his doctoral research studies at the University of New South Wales.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.06 | £ 42.06 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.