Fatigue and Fracture Reliability Engineering
Language: English
Published by Springer, 2013
Series: Book 14 of 90 - Springer Series in Reliability Engineering
- Softcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 226.96
Quantity: 2 available
Add to basketItem description from seller
Seller Inventory # x-1447126254
- Title
- Fatigue and Fracture Reliability Engineering
- Author
- Xiong, J.J. (Author)/ Shenoi, R.A. (Author)
- Publisher
- Springer
- Publication year
- 2013
- Condition
- Brand New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 1447126254
- ISBN 13
- 9781447126256
- Item weight
- 0.36 kilograms
- Series
- Book 14 of 90: Springer Series in Reliability Engineering
Fatigue and Fracture Reliability Engineering is an attempt to present an integrated and unified approach to reliability determination of fatigue and fracture behaviour, incorporating probability, statistics and other related areas.
A series of original and practical approaches, are suggested in Fatigue and Fracture Reliability Engineering, including new techniques in determining fatigue and fracture performances. It also carries out an investigation into static and fatigue properties, and into the failure mechanisms of unnotched and notched CFR composite laminates with different lay-ups to optimize the stacking sequence effect. Further benefits include:
- a novel convergence-divergence counting procedure to extract all load cycles from a load history of divergence-convergence waves;
- practical scatter factor formulae to determine the safe fatigue crack initiation and propagation lives from the results of a single full-scale test of a complete structure; and
- a nonlinear differential kinetic model for describing the dynamical behaviour of an atom at a fatigue crack tip.
Fatigue and Fracture Reliability Engineering is intended for practising engineers in marine, civil construction, aerospace, offshore, automotive and chemical industries. It is also useful reading for researchers on doctoral programmes, and is appropriate for advanced undergraduate and postgraduate programmes in any mechanically-oriented engineering discipline.
"Synopsis" may belong to another edition of this title.
About the Author
Professor J.J. Xiong is head of the Aircraft Structure Safety and Reliability Group in the School of Transportation Science and Engineering, professor and doctoral supervisor at Beihang University, China. He graduated in 1986 with a BSc degree from Northwest Polytechnic University, then worked for the Institute of Helicopter Design and Research from 1986 to 1989. From 1989 to 1995, he worked for academic degrees at Beihang University; since then he has been working at Beihang University as a post-doctoral researcher, an associate professor and a professor. He is a doctoral supervisor in aircraft design. He worked in the University of Southampton, UK, for two years as a senior visiting research fellow.
Professor Xiong's research interests include fatigue and fracture reliability of metallic and composite structures; mechanics of RTM composite structures; repair design for notched structures with bonded composites; and numerical modelling on fluid-solid-electromagnetism interaction. As a chief investigator, he has been engaged in a number of research projects sponsored by the National Natural Science Foundation, the National Defense Science Foundation, the Aeronautics Science Foundation of China, etc.
Professor R.A. Shenoi holds the Chair of Lightweight Structures within the Fluid-Structure Interaction Research Group in the School of Engineering Sciences at the University of Southampton. He obtained his BTech degree from IIT Kharagpur in 1974 and his PhD from the University of Strathclyde, Glasgow, in 1981. Since 1981, he has been at the University of Southampton as lecturer, senior lecturer, reader and professor. He is a Fellow of both the Royal Institution of Naval Architects and the Institution of Mechanical Engineers.
His research work aims to understand the mechanics of FRP structures and can be classified under three broad headings. The first of these deals with understanding the strength of large structural elements andthe progressive nature of damage build-up. Secondly, he is involved with modelling the long-term behaviour of structures – creep, fatigue and fracture aspects in air, and under hygrothermal environments. The third area of study deals with design for production issues and the simulation of process modelling in automated FRP production. He serves on the editorial board of the Journal of Strain Analysis and is a long-standing, invited, member of the technical panels and committees of the International Ship and Offshore Structures Congress.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 10.00 | £ 25.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.