Experimental Study and Remedial Technologies for Large Transverse Deformation in Shield Tunnel Structures (Key Technologies for Tunnel Construction . Geological and Environmental Conditions)
Language: English
Published by Springer, 2026
- Hardcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 195.34
Quantity: 1 available
Add to basketItem description from seller
Seller Inventory # x-9819550661
- Title
- Experimental Study and Remedial Technologies for Large Transverse Deformation in Shield Tunnel Structures (Key Technologies for Tunnel Construction . Geological and Environmental Conditions)
- Author
- Wang, Rulu (Author)/ Liu, Xian (Author)/ Li, Jiaping (Author)/ Jiang, Cheng (Translator)/ Yan, Jingya (Author)/ Wu, Shang (Translator)/ Wu, Juyan (Translator)/ Han, Yang (Translator)
- Publisher
- Springer
- Publication year
- 2026
- Condition
- Brand New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 9819550661
- ISBN 13
- 9789819550661
- Item weight
- 0.48 kilograms
This book focuses on the study of deformation, particularly transverse deformation of the shield tunnel. The book begins with a theoretical analysis based on structural mechanics is introduced, followed by a full-scale model test conducted to monitor the deformation of the structure under gradually increasing loads.
Most of the structure types existing in the Shanghai Metro system are researched in the tests, and the deformation mechanisms for different structures were separately summarized. In addition, tunnels with reinforcement measures are also tested to verify the effects of the reinforcement.
Based on the research results, safety control standards for the tunnels are proposed, and several deformation treatment measures are introduced with four application cases in Shanghai.
From this book, readers will learn the deformation mechanisms of shield tunnel structures and corresponding treatment measures, which can help them solve relevant issues and enhance their awareness of structural safety risks at the same time.
"Synopsis" may belong to another edition of this title.
About the Author
Rulu Wang, now as the deputy chief engineer of Shanghai Shentong Metro Group Co., Ltd, has been working on the research and application of the structural protections of Shanghai metro over 20 years since graduated with a post-doctor degree from Tongji University. Wang has successively won the Shanghai Leading Talent, the first Liu Jianhang Academician Foundation Award and other honors. Over 30 research projects about metros were undertook or participated by him over the past years. He has won 4 prizes of Shanghai Municipal Science and Technology Progress Award (including first, second, and third award), 3 awards of Shanghai Municipal Excellent Invention Competition, 2 second prizes of the Ministry of Land and Resources Science and Technology Progress Award, 1 third prize of the Ministry of Construction. He also owns 3 published works, 2 utility model patents, 3 invention patents, and more than 40 academic papers.
Liu Xian, now is working as a professor and doctoral supervisor of the College of Civil Engineering, Tongji University. He has long been engaged in the research on the life cycle design theory and maintenance technology of tunnels and underground structures. Up to now, he has published more than 300 papers in important journals and academic conferences at home and abroad. He has edited and published several works such as “Waterproof Design and Construction of Tunnel Engineering”.
Jiaping Li, now as the deputy general manager and chief engineer of Shanghai Metro Monitoring and Inspection Management Co., Ltd, has been working on the maintenance of civil structures of rail transit and management of protection areas of metro for decades. He has participated in more than 10 scientific research projects of the Ministry of Science and Technology and Shanghai, and the edition of 8 professional technical standards. He has obtained 6 authorized patents, published more than 20 academic papers, and won 2 first prizes, 3 second prizes and 1 third prize of the Shanghai Science and Technology Progress Award.
Jingya Yan, now serves as the deputy director of Shentong Metro Inspection Office. She has been working in the field of maintenance of rail transit structure and protection area for over 15 years and got the qualification of professor-level senior engineer. She has won 1 first prize (the fifth) and 1 second prize (the seventh) of the Shanghai Science and Technology Progress Award, 2 outstanding invention awards in the Shanghai Excellent Invention Selection Competition, and 1 employee innovation gold award. She was also selected as the outstanding technical leader of Shanghai. She has published 14 professional papers, compiled 3 professional books, and 2 technical regulations and standards.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 10.00 | £ 25.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.