Event-Trigger Dynamic State Estimation for Practical WAMS Applications in Smart Grid
Zhen Li|Sen Li|Tyrone Fernando|Xi Chen
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Focuses on dynamic state estimation (DSE) design for practical smart grid applicationsSummarizes the event trigger strategy design for DSEEnables designs that reduce the communication rate and achieve balance between the bandwidth and accur.
Seller Inventory # 458546249
This book describes how dynamic state estimation application in wide-area measurement systems (WAMS) are crucial for power system reliability, to acquire precisely power system dynamics. The event trigger DSE techniques described by the authors provide a design balance between the communication rate and estimation performance, by selectively sending the innovational data. The discussion also includes practical problems for smart grid applications, such as the non-Gaussian process/measurement noise, packet dropout, computation burden of accurate DSE, robustness to the system variation, etc. Readers will learn how the event trigger DSE can facilitate the effective reduction of communication rates, with guaranteed accuracy under a variety of practical conditions in smart grid applications.
Zhen Li is Associate Professor in School of Automation, Beijing Institute of Technology, Beijing, China. He received the B. Eng. and M. Eng. degrees in measurement science and control technology from Harbin Institute of Technology, Harbin, China, in 2006 and 2008, respectively. In 2012, he received Ph. D. degree from the Hong Kong Polytechnic University, Hong Kong SAR, China. He was a Research Assistant/Associate in Applied Nonlinear Circuits and System Research Group, in the Department of Electronic and Information Engineering at the Hong Kong Polytechnic University, from October 2011 to September 2012 and December 2013 to January 2014. He currently serves as technical committee member of the IFAC Technical Committee on Power and Energy Systems (TC6.3), Electrical Automation Professional Committee for Chinese Association of Automation, China Information Association for Traditional Chinese Medicine and Pharmacy Council, IEEE PES Innovative Smart Grid Technologies Asia Conference (ISGT Asia 2016), and International Conference on Sustainable Energy Engineering (ICSEE2017/2018). He also serves as International Program Committee of 2019 IFAC Workshop on Control of Smart Grid and Renewable Energy Systems (CSGRES 2019). His main research interests include the stability analysis of power electronics interfaced DERs, advanced control of power converters and its application for DERs, and dynamic state estimation for complex power system.
Tyrone Fernando is Professor in the School of Electrical Electronic and Computer Engineering (EECE), University of Western Australia, Perth, Australia. He obtained his bachelor of engineering with honors and the degree of doctor of philosophy from the University of Melbourne, Melbourne, Australia, in 1990 and 1996 respectively. In 1996 he joined the School of Electrical Electronic and Computer Engineering (EECE), University of Western Australia (UWA) where he is currently a Professor. He was the deputy head of EECEUWA in 2009 and 2010. He is currently the Director of the Power and Clean Energy (PACE) research group in EECE, UWA. His research interests are in power system dynamics, renewable energy, smart grids and state estimation. He is a senior member of the IEEE. Professor Fernando has served as an Associate Editor for the IEEE Transactions on Information Technology in Biomedicine and also as Guest Editor for the journal of Optimal Control Applications and Methods. He is currently an associate editor for IEEE Transactions on Circuits and Systems–-II and IEEE Access.
Xi Chen is the Director of GEIRI North America. He obtained his MSc from King's College London, University of London and PhD from the Hong Kong Polytechnic University, in 2005 and 2008, respectively. He was the visiting student at the University of Florida in 2008, the postdoc fellowship of the Hong Kong Polytechnic University in 2009, and the postdoc fellowship Institute of Software, Chinese Academy of Science, from 2011 to 2013. From 2009 to 2014, he was a research fellow at State Grid Information and Telecommunication Branch, State Grid Corporation of China (SGCC). In 2014 he joined GEIRI North America (previous known as SGRI North America) where he is currently the Director of Development and Planning. He is senior member of IEEE, the deputy head of Ubiquitous Technical Committee, China Communications Standards Association (CCSA/TC10/WG2), Committee Member of SGCC Information and Telecommunication Standardization Committee. He is a National Member of CIGRE JWG No D2/C2.41, a China National Committee member of CIGIRE D2. He was a receipt of SGCC Youth Award 2016', Professional Fields Leading Talents 2012', Wuxi city Leading Creative Talent 2010', the 2rd Prize of Beijing Sciences and Technology Progress Award, and the 2rd Prize of SGCC Sciences and Technology Progress Award. He was one of the main participants for China National Development and Strategy Planning of the Internet of Things in the power industry (2010-2015). His research interests including IoT, smart grid, electric vehicle charging infrastructure, nonlinear system, complex network analysis and its applications.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.74 | £ 42.74 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.