Engineering for Reliability
Language: English
Published by Vulcanus Press, 2026
Series: Book 8 of 9 - The Reliability Framework: English-Language Edition
- Softcover
- New

Seller: Rarewaves.com USA, London, London, United KingdomRarewaves.com USA
AbeBooks seller since June 11, 2025
Condition: New
£ 37.55
Quantity: Over 20 available
Add to basketSeller Inventory # LU-9789083643199
- Title
- Engineering for Reliability
- Author
- Martin Van Den Hout
- Publisher
- Vulcanus Press
- Publication year
- 2026
- Condition
- New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 9083643190
- ISBN 13
- 9789083643199
- Item weight
- 245 grams
- Series
- Book 8 of 9: The Reliability Framework: English-Language Edition
Four hours of downtime equals $4,200 in damage. The real cost? $18,000 over three years — because during design a cheaper motor was chosen that saved $3,000. Every $1,000 saved in design causes on average $47,000 in extra maintenance costs over the asset's lifetime.
The problem: 80% of reliability problems originate during design and construction. This book shows you how to build reliability in from the very first design decision. Every phase treated systematically with concrete methodologies and calculation models.
Complete methodology in 6 phases
- Phase 1: Understanding the problem — the 80/20 rule of reliability engineering, the 5-Why technique for root causes, the iceberg principle: real costs are 3–5 times higher than visible repair costs
- Phase 2: Specifications — stakeholder analysis, Early Equipment Management, and RAMS methodology (Reliability, Availability, Maintainability, Safety) to define quantitative objectives
- Phase 3: Criticality analysis — set priorities across five risk dimensions: safety, environment, delivery reliability, quality, and sustainability. Determine which assets deserve $50,000–$500,000 in engineering versus a $500 basic analysis. Result: $1.3 million in savings, 18% higher availability
- Phase 4: Design — FMEA: seven core questions identify all failure modes, RPN prioritizes improvements. Maintainability: five design principles (accessibility, visibility, standardization, modularity, diagnostics). RCM prevents both over- and under-maintenance
- Phase 5: Economic justification — Life Cycle Costing: pump B ($12,000) saves $85,000 versus pump A ($8,000) through lower energy and maintenance costs. NPV calculations and business cases that convince management
- Phase 6: Realization — commissioning, systematic supplier selection, and portfolio management creating $1.4 million in additional value
- 35% lower lifecycle costs through thorough analysis
- Up to 47:1 return on reliability investment
- $1.3 million savings through criticality analysis
- $50,000–$100,000 gain per asset through LCC
- 60–80% fewer commissioning problems
FMEA worksheets, LCC calculators, criticality matrix, business case templates, supplier scorecard, and commissioning checklists.
Who is this book for?
Project managers, maintenance managers, asset managers, reliability engineers, technical directors, procurement professionals, and consultants responsible for new assets. Applicable across manufacturing, process industry, energy, utilities, transport, healthcare, and public sector organizations.
Part of a larger whole
This is the eighth volume of The Reliability Framework, a nine-book series covering technical asset management. Each book covers one subject systematically and in depth.
About the author
Martin Van den Hout has 35 years of experience in maintenance and reliability, including 24 years as a consultant. He has guided hundreds of projects across manufacturing, chemical, and process industries. He wrote a leading university-level textbook on maintenance management and delivers in-company training programs in FMEA, RCM, and LCC.
Stop paying to fix in operations what went wrong during design.
"Synopsis" may belong to another edition of this title.
Rarewaves.com USA
London, London, United Kingdom
AbeBooks seller since June 11, 2025
Shipping rates from United Kingdom to U.S.A.
| Item | 12 to 17 business days | 12 to 17 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Payment methods
Seller's business information
RAREWAVES.COM LIMITED
Elsley Court, 20-22 Great Titchfield Street
London, United Kingdom W1W 8BE
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Rarewaves.com USA, Unit 144 The Lightbox, 111 Power Road, W4 5PY, London, London, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Please note that we do not offer Priority shipping to any country.
We currently do not ship to the below countries:
Russia
Belarus
Ukraine
Please do not attempt to place orders with any of these countries as a ship to address - they will be cancelled.