Engineering Challenges for Sustainable Underground Use
Language: English
Published by Springer International Publishing, 2017
- Softcover
- New

Condition: New
£ 80.77
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Targets professionals interested in the utilization of underground spaceSheds light on the recent developments and advancements in planning, design, and construction of underground structuresDiscusses.
Seller Inventory # 150711165
- Title
- Engineering Challenges for Sustainable Underground Use
- Author
- Agaiby, Sherif|Grasso, Piergiorgio
- Publisher
- Springer International Publishing
- Publication year
- 2017
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 3319616358
- ISBN 13
- 9783319616353
- Series
- Book 5 of 59: Sustainable Civil Infrastructures
- Seller catalogs
- Mathematik/Naturwissenschaften/Technik/Medizin
This volume comprises a set of high-quality, refereed papers that address the different aspects related to the geotechnical and structural design and construction of deep excavations, tunnels and underground space facilities as well as the effect of their construction on the surroundings. The papers cover planning, design, modeling, monitoring and construction aspects of these essential structures. This volume is part of the proceedings of the 1st GeoMEast International Congress and Exhibition on Sustainable Civil Infrastructures, Egypt 2017.
"Synopsis" may belong to another edition of this title.
About the Author
Sherif W. Agaiby,
Prof. Dr. Sherif Wissa Agaiby is the Director of the Geotechnical and Heavy Civil Engineering Department at Dar Al-Handasah Consultants (Shair and Partners). Dr Agaiby earned his B.Sc. and M.Sc. degrees from Cairo University, Egypt in 1983 and 1987, respectively, and his Ph.D. from CornellUniversity, Ithaca, NY, USA in 1991. Dr. Agaiby taught and conducted research in most fields of Geotechnical Engineering as a university faculty member (Cairo University; 1983 - 2004). Since joining Dar Al-Handasah, Dr. Agaiby has been actively involved in consulting and has participated in the planning, analyzing, designing, and providing during construction follow-up for major engineering projects worldwide. Dr. Agaiby is involved in many national and international scientific activities including: Chairperson of the Professional Image Committee, International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE), 2013 to 2017; Board Member, Council of Foundation of ITA-CET, Foundation for Education and Training on Tunneling and Underground Space Use; member of the Egyptian Code of Practice for Geotechnical Engineering and Foundations on Rock committee and the Site Investigation committee; member of the Egyptian Code of Practice committee for the Design and Construction of Tunnels and Underground Structures.
Piergiorgio Grasso,
Piergiorgio Grasso is the founder, President and Principal Engineer of Geodata Engineering, which is a consultancy company specialised in the design consultancy of underground infrastructures, both in urban environments and in mountain areas. He earned his B.Sc. and M.Sc. in civil engineering from the Politecnico di Torino of Italy, in 1976.
Geodata is based in Italy and operating world-wide, since 1984. Geodata has designed and supervised the construction of over 4,000 km of tunnels and more than 3,300 projects in over 50 countries.
Geodata specialises in managing and resolving complex issues relating to:
• tunnels and excavation in urban areas
• long and deep tunnels
• complex underground structures
Piergiorgio Grasso served ITA (International Tunnelling Association) as Board Member, Vice-President and Expert from 2005 to 2013, he is Vice-President and Co-Founder of ITA-CET, Foundation for Education and Training on Tunnelling and Underground Space Use.
Piergiorgio Grasso has published over 200 articles on geoengineeering and tunnelling. He is co-author of two books: the first volume ‘Geomechanical Principles in the Design of Tunnels and Caverns in Rock’, which was published by Elsevier in 1992, and ‘Mechanized Tunnelling In Urban Areas–Design methodology and Construction control’ by Vittorio Guglielmetti, Piergiorgio Grasso, Ashraf Mahtab, Shulin Xu (Geodata S.p.A., Turin, Italy) Editors - published by Taylor and Francis (November 2007).
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.63 | £ 41.63 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.