Emerging Solutions for e-Mobility and Smart Grids
Book 31 of 48: Springer Proceedings in EnergyNew - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. This book presents select proceedings of the International Conference on Renewable Energy Systems (ICRES 2020). It focuses mainly on the concepts of electric vehicle, selection of batteries, selection of electric motors for specific capacity vehicles, de.
Seller Inventory # 581558132
This book presents select proceedings of the International Conference on Renewable Energy Systems (ICRES 2020). It focuses mainly on the concepts of electric vehicle, selection of batteries, selection of electric motors for specific capacity vehicles, design of controllers, battery chargers and development of testing facility. It presents the importance of energy storage system and modeling aspects of battery, super capacitor, flywheel energy storage and Superconducting magnetic energy storage systems. The book comprehensively presents the integration of renewable energy sources with smart grid, smart grid technologies and equipment, grid interconnection issues and design of intelligent controllers for grid connected system. The state-of-the-art technologies such as charging infrastructure for electric vehicles, robotic applications in energy, energy education and informatics are also covered in this book. This book will benefit the students and researchers in the field of electronics and electrical engineering, energy engineering, automotive engineering, e-mobility specialists and industrial experts.
Dr. V. Kamaraj, Professor and Head in the Department of Electrical and Electronics Engineering, SSN College of Engineering, Chennai, has 30 years of teaching and research experience. He has received his B.Tech (EEE) degree first class from Calicut University in 1987, M.E. in Power Electronics and Ph.D in Networks from Anna University, respectively, in the year 1993 and 2001. He has published over 100 research publications in refereed international and national journals and conferences. He served in Sri Venkateswara College of Engineering from 1989 to 2006 and was elevated from associate lecturer to various positions. After joining SSN College of Engineering in 2006 as a Professor in the Department of EEE he was instrumental in getting MODROB project and seminar grant from AICTE. He has organised international conferences and several workshops at SSN College of Engineering. Presently he is guiding 5 PhD research scholars and 12 scholars have completed PhD under his guidance. He is currently working in the area of power quality, machine design and power converter topologies. He has received ISTE Periyar Award, Best Engineering College Teacher, and IET Diamond Salute Award in 2014. He is the principal investigator for the project titled "Design and Development of Permanent Magnet Assisted Reluctance Motor Drives for Pump Application" funded by Science and Engineering Research Board (SERB). He is an active member in IEEE and life member in ISTE.
Dr. Jayashri Ravishankar received her BE, ME and PhD all in Electrical Engineering from Anna University, India. After 15 years of teaching in India, she joined the University of New South Wales (UNSW), Sydney in 2010 as an API (Australian Power Institute) sponsored academic for promoting power engineering education in Australia. Her teaching and research interests include power system modelling, analysis and control, renewable energy integration, smart grids and micro grids.She has authored and coauthored more than 80 journal and conference papers in this area. Jayashri set up the first microgrid test bench at UNSW in 2012 and has since supervised to completion seven PhD students in the area of microgrids. She is the associate editor of the Australian Journal for Electrical and Electronics Engineering and a regular reviewer for several IEEE, IET and other journals and conferences. She has research active collaborations in India, Ireland and USA. Jayashri also has a deep interest in learning and teaching, and consistently implements strategies using technology innovations and industry partnerships to improve students’ active learning. She is institutionally and internationally recognized for the impact of her innovative, research-led and highly effective teaching and leadership. Alongside high-quality research outcomes and international collaborations, she leads best-practice advanced teaching in electrical engineering through imaginative initiatives, including blended industry lectures and flipped mode strategies. By demonstrating teaching excellence in her professional, inclusive learning environments, particularly supportive of international students, she has been very influential in educational peer leadership. By mentoring her students to focus on learning as future professionals, and by excelling in UNSW leadership and service roles, she shares her passion for engineering education and research. Esteem indicators include Senior Fellowship of the Higher Education Academy awarded by Advance HE (UK), and individual Teaching Excellence Awards both from the Faculty of Engineering and the UNSW.
Dr. S Jeevananthan is Professor in the Department of Electrical and Electronics Engineering, Pondicherry Engineering College, Puducherry. He has 20 years of teaching and research experience. He has received his B.E (EEE) degree from Madurai Kamaraj University in 1998, M.E. in Power Electronics and Drives from Bharathiyar University in 2000 and PhD in Power Electronics from Pondicherry University in the year 2008. He has published over 150 research publications in refereed international and national journals and conferences. He has published 3 books and has completed 2 funded projects. Presently he is guiding 4 PhD research scholars and 6 scholars have completed PhD under his guidance. He is currently working in the area of power converter topologies, control strategies and AC drives. He has completed consultancy projects for Numeric power systems Ltd. and Consul consolidated Pvt. Ltd. He visited Singapore, Malaysia, Srilanka, Germany, France and Netherland. He is currently board of studies member in several institutions.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.97 | £ 41.97 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.