Electrolytes for Energy Storage Applications
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Ramesh K. Guduru (Ph.D. in Nanomaterials from NC State University) is a member of faculty at Pandit Deendayal Energy University, India, and founded a start-up, GreenXcel Technologies, that specializes in circular economy with a focus on green ener.
Seller Inventory # 1435406390
The book offers detailed progress and challenges in energy storage technologies with respect to various electrolyte chemistries including energy storage devices such as batteries and supercapacitors. It introduces energy storage systems and explains the selection of electrolytes for energy storage systems, aqueous- and non-aqueous-based electrolytes, metal-air batteries, and multivalent chemistries.
Key features:
This book is written for graduate students and researchers in electrochemistry, physical chemistry, and renewable energy.
Ramesh K. Guduru (Ph.D. in Nanomaterials from NC State University) is a member of faculty at Pandit Deendayal Energy University, India, and founded a start-up, GreenXcel Technologies, that specializes in circular economy with a focus on green energy solutions. Prior to that, he was a full-time member of faculty at Texas State University for five years and also worked as an adjunct faculty member at the University of Michigan and as a Chief Scientist at CSquared Innovations LLC. Dr. Guduru has more than 12 years of experience in rechargeable batteries and supercapacitors, has published more than 110 articles, seven book chapters, and holds four international patents and has two Indian patents pending, and has served on review panels for NSF-USA, QNRF-QATAR, Skolkovo Foundation-RUSSIA, and SNF-Switzerland.
Saravanakumar Balasubramaniam is a Junior Scientist at SARP-LARPM, Central Institute of Petrochemicals Engineering and Technology (CIPET), Bhubaneswar, Odisha, India. He received a doctoral degree from Jeju National University, Jeju, Republic of Korea. His research focuses on developing new materials and fabrication techniques for energy harvesting applications, as well as new types of self-powered devices. Similarly, he is working in the field of energy storage devices such as supercapacitors and batteries in the area of and aqueous-based electrolytes. He published more than 70 articles in peer-reviewed journals with approximately 4100 citations and an H-index of 37.
Venkateswarlu Manne, MSc, M.Phil, Ph.D., served as a Director at Customized Energy Solutions India, leading cutting-edge storage technology development for E-Mobility and ESS, and is presently working as Chief Technology Officer (CTO), Kushmanda Power Ltd at Chandigarh. Prior to that, he worked with Amara Raja Batteries Ltd, Electrotherm, HBL, and conducted post-doctoral research on next-gen lithium-ion batteries at NTUST, Taiwan. His areas of expertise include solid electrolyte research, advanced batteries, technology licensing, project management, and pilot-scale production. Collaborating closely with research institutions, he optimizes resource utilization to deliver groundbreaking solutions in the energy domain. As a co-author of numerous articles, he significantly contributes to electrochemical and power sources research. He has received prestigious awards, including Best Research Scientist, Industrial Researcher of the Year, and Leadership in Clean Mobility awards, for his unwavering dedication to advancing Li-ion battery tech for e-mobility and ESS applications.
Ananthakumar Ramadoss is a Scientist at the Advanced Research School for Technology & Product Simulation (ARSTPS), Central Institute of Petrochemical Engineering and Technology (CIPET), Chennai, India. He received his PhD degree in Mechanical Engineering from Jeju National University, South Korea (2015), and PhD degree in Physics from Bharathidasan University, India (2024). He was a Scientist (Jr) at CIPET: SARP-LARPM, Bhubaneswar, India (2016–2022); Alexander Von Humboldt postdoctoral fellow at the University of Konstanz, Germany (2016); a postdoctoral fellow at the KAIST, Korea (2015–2016); and a research fellow at the CSIR-CECRI, India (2009–2011). His research interests mainly focus on developing nanostructured materials and their applications in supercapacitors, nanogenerators, self-powered systems, 3D printing, thin films, corrosion protection, and bio-implant applications. He has an accomplished track record of publications in high-impact journals (more than 100), more than 20 book chapters, and two patents. Also, he has received more than 20 awards and prestigious fellowships. In addition, he has guided three PhD theses, 12 Masters theses, four Bachelors theses and trained eight research personnel. In addition, he has completed two ongoing sponsored national and four sponsored international projects in the respective areas. Further, three mentor projects and eight national and international internships/workshops/PAC meetings have been accomplished.
Rambabu Bobba is a professor of physics at Southern University and A&M College, Baton Rouge (SUBR). He earned his Ph.D. in Physics in 1982 from the Indian Institute of Technology-Madras/Chennai. After completing his post-doctoral assignments at the University of Minnesota and the University of New Orleans, he became a faculty member in the Department of Physics at SUBR in 1986. During his tenure at SUBR, he published 125 papers and several extended abstracts and successfully completed visiting professor assignments in AT&T Bell Laboratories, Lawrence Livermore National Laboratory, Dow Chemical Company, University of West Indies, US-DOD, Office of Naval Research, and finally as USIEF-Fulbright Fellow in India. His research encompasses the design and development of low-cost, more efficient nanoionics materials that can facilitate widespread commercialization of electrochemical energy storage and conversion technologies such as lithium batteries, supercapacitors, fuel cells (HT-PEMFCs and LT-SOFCs), and solar hydrogen to address the world's energy and environmental challenges.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.33 | £ 42.33 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.