Earned Value Project Management

Fleming, Quentin W., Koppelman, Joel M.

ISBN 10: 1880410273 ISBN 13: 9781880410271
Published by Project Management Institute, 2000
Used Soft cover

From Better World Books Ltd, Dunfermline, United Kingdom Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

AbeBooks Seller since 13 October 2008

This specific item is no longer available.

About this Item

Description:

Ships from the UK. Used book that is in clean, average condition without any missing pages. Seller Inventory # 2750774-20

Report this item

Synopsis:

"Earned value" is a project management technique that is emerging as a valuable tool in the management of all projects, including and, in particular, software projects. In its most simple form, earned value equates to fundamental project management.

This is not a new book, but rather it is an updated book. Authors Quentin Fleming and Joel Koppelman have made some important additions. In many cases, there will be no changes to a given section. But in other sections, the authors have made substantial revisions to what they had described in the first edition.

Fleming and Koppelman’s goal remains the same with this update: describe earned value project management in its most fundamental form, for application to all projects, of any size or complexity. Writing in an easy-to-read, friendly, and humorous style characteristic of the best teachers, Fleming and Koppelman have identified the minimum requirements that they feel are necessary to use earned value as a simple tool for project managers. They have also witnessed the use of simple earned value on software projects, and find it particularly exciting. Realistically, a Cost Performance Index (CPI) is the same whether the project is a multibillion-dollar high-technology project, or a simple one hundred thousand-dollar software project. A CPI is a CPI … period. It is a solid metric that reflects the health of the project.

In every chapter, Fleming and Koppelman stick with using simple stories to define their central concept. Their project examples range from peeling potatoes to building a house. Examples are in round numbers, and most formulas get no more complicated than one number divided by another.

Earned Value Project Management—Second Edition may be the best-written, most easily understood project management book on the market today. Project managers will welcome this fresh translation of jargon into ordinary English. The authors have mastered a unique "early-warning" signal of impending cost problems in time for the project manager to react.

Synopsis: Fleming and Koppelman have performed a three-way earned value makeover. First they simplified the concept. Earned value measurement is nothing more than a combination of the amount of scheduled tasks accomplished, with its corresponding budget.

"About this title" may belong to another edition of this title.

Bibliographic Details

Title: Earned Value Project Management
Publisher: Project Management Institute
Publication Date: 2000
Binding: Soft cover
Condition: Good
Edition: 2nd.

Top Search Results from the AbeBooks Marketplace

Stock Image

Quentin W. Fleming; Joel M. Koppelman
Published by Project Management Institute, 2000
ISBN 10: 1880410273 ISBN 13: 9781880410271
Used paperback

Seller: The Maryland Book Bank, Baltimore, MD, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

paperback. Condition: Good. 2nd. Corners are slightly bent. Used - Good. Seller Inventory # 13-G-5-0150

Contact seller

Buy Used

£ 1.87
£ 3.44 shipping
Ships within U.S.A.

Quantity: 1 available

Add to basket

Stock Image

Quentin W. Fleming
Published by Project Management Institute, 2000
ISBN 10: 1880410273 ISBN 13: 9781880410271
Used Softcover

Seller: World of Books (was SecondSale), Montgomery, IL, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: Very Good. Item in very good condition! Textbooks may not include supplemental items i.e. CDs, access codes etc. Seller Inventory # 00083268945

Contact seller

Buy Used

£ 2.65
Free Shipping
Ships within U.S.A.

Quantity: 1 available

Add to basket

Stock Image

Koppelman, Joel M.
Published by Project Management Institute, 2000
ISBN 10: 1880410273 ISBN 13: 9781880410271
Used Paperback

Seller: WorldofBooks, Goring-By-Sea, WS, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Paperback. Condition: Very Good. The book has been read, but is in excellent condition. Pages are intact and not marred by notes or highlighting. The spine remains undamaged. Seller Inventory # GOR002713341

Contact seller

Buy Used

£ 2.80
£ 5.60 shipping
Ships from United Kingdom to U.S.A.

Quantity: 1 available

Add to basket

Stock Image

-
Published by -, 2000
ISBN 10: 1880410273 ISBN 13: 9781880410271
Used Paperback

Seller: AwesomeBooks, Wallingford, United Kingdom

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Paperback. Condition: Very Good. Earned Value Project Management (Earned Value Project Management, 2nd ed) This book is in very good condition and will be shipped within 24 hours of ordering. The cover may have some limited signs of wear but the pages are clean, intact and the spine remains undamaged. This book has clearly been well maintained and looked after thus far. Money back guarantee if you are not satisfied. See all our books here, order more than 1 book and get discounted shipping. Seller Inventory # 7719-9781880410271

Contact seller

Buy Used

£ 4.63
£ 4.99 shipping
Ships from United Kingdom to U.S.A.

Quantity: 2 available

Add to basket

Stock Image

-
Published by - -, 2000
ISBN 10: 1880410273 ISBN 13: 9781880410271
Used Paperback

Seller: Bahamut Media, Reading, United Kingdom

Seller rating 4 out of 5 stars 4-star rating, Learn more about seller ratings

Paperback. Condition: Very Good. This book is in very good condition and will be shipped within 24 hours of ordering. The cover may have some limited signs of wear but the pages are clean, intact and the spine remains undamaged. This book has clearly been well maintained and looked after thus far. Money back guarantee if you are not satisfied. See all our books here, order more than 1 book and get discounted shipping. Seller Inventory # 6545-9781880410271

Contact seller

Buy Used

£ 4.63
£ 6.98 shipping
Ships from United Kingdom to U.S.A.

Quantity: 2 available

Add to basket

Stock Image

Quentin W. Fleming, Joel M. Koppelman
Published by Project Management Institute, 2000
ISBN 10: 1880410273 ISBN 13: 9781880410271
Used Softcover

Seller: Wonder Book, Frederick, MD, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: Very Good. Very Good condition. 2nd edition. A copy that may have a few cosmetic defects. May also contain light spine creasing or a few markings such as an owner's name, short gifter's inscription or light stamp. Seller Inventory # Q09S-01735

Contact seller

Buy Used

£ 4.68
Free Shipping
Ships within U.S.A.

Quantity: 3 available

Add to basket

Stock Image

Quentin W. Fleming, Joel M. Koppelman
Published by Project Management Institute, 2000
ISBN 10: 1880410273 ISBN 13: 9781880410271
Used Softcover

Seller: Wonder Book, Frederick, MD, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: As New. Like New condition. 2nd edition. A near perfect copy that may have very minor cosmetic defects. Seller Inventory # Y09I-00280

Contact seller

Buy Used

£ 4.68
Free Shipping
Ships within U.S.A.

Quantity: 1 available

Add to basket

Stock Image

Fleming, Quentin W., Koppelman, Joel M.
Published by Project Management Institute, 2000
ISBN 10: 1880410273 ISBN 13: 9781880410271
Used Softcover

Seller: Better World Books, Mishawaka, IN, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: Good. 2nd. Former library book; may include library markings. Used book that is in clean, average condition without any missing pages. Seller Inventory # GRP78715534

Contact seller

Buy Used

£ 5.01
Free Shipping
Ships within U.S.A.

Quantity: 1 available

Add to basket

Stock Image

Fleming, Quentin W., Koppelman, Joel M.
Published by Project Management Institute, 2000
ISBN 10: 1880410273 ISBN 13: 9781880410271
Used Softcover

Seller: Better World Books, Mishawaka, IN, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Condition: Very Good. 2nd. Used book that is in excellent condition. May show signs of wear or have minor defects. Seller Inventory # 5550412-6

Contact seller

Buy Used

£ 5.01
Free Shipping
Ships within U.S.A.

Quantity: 1 available

Add to basket

Stock Image

Quentin W. Fleming; Joel M. Koppelman
Published by Project Management Institute, 2000
ISBN 10: 1880410273 ISBN 13: 9781880410271
Used Paperback

Seller: ThriftBooks-Dallas, Dallas, TX, U.S.A.

Seller rating 5 out of 5 stars 5-star rating, Learn more about seller ratings

Paperback. Condition: As New. No Jacket. Pages are clean and are not marred by notes or folds of any kind. ~ ThriftBooks: Read More, Spend Less. Seller Inventory # G1880410273I2N00

Contact seller

Buy Used

£ 5.06
Free Shipping
Ships within U.S.A.

Quantity: 1 available

Add to basket

There are 4 more copies of this book

View all search results for this book