EPC PROJECT MANAGEMENT HANDBOOK – VOLUME 2: Engineering management, BIM, digital engineering, procurement and supply chain management, vendor management, expediting, logistics, construction
Language: English
Published by Independently published, 2026
- Softcover
- New

Seller: California Books, Miami, FL, U.S.A.California Books
AbeBooks seller since October 27, 2023
Condition: New
£ 33.29
Quantity: Over 20 available
Add to basketItem description from seller
Print on Demand.
Seller Inventory # I-9798192922019
- Title
- EPC PROJECT MANAGEMENT HANDBOOK – VOLUME 2: Engineering management, BIM, digital engineering, procurement and supply chain management, vendor management, expediting, logistics, construction
- Author
- Subramanian, Balachander
- Publisher
- Independently published
- Publication year
- 2026
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 13
- 9798192922019
The manuscript begins its engineering-management coverage with a fundamental premise: technically correct discipline designs can still fail if they are not coordinated, constructible, procureable, testable, maintainable and operationally usable at the required time. This principle is central to modern EPC project management because engineering decisions can influence equipment selection, procurement lead times, construction methodology, installation sequencing, commissioning, cost and schedule.
The book therefore explores design coordination, interdisciplinary interfaces, constructability, BIM, digital engineering and Common Data Environments as project delivery disciplines rather than merely technical or software functions.
The procurement and supply-chain sections extend this philosophy into the physical supply chain. Procurement is presented not simply as purchasing but as a complete lifecycle extending from procurement strategy and market assessment through long-lead identification, vendor selection, purchase orders, vendor engineering, manufacturing, expediting, inspection, testing, logistics, site delivery, construction, commissioning, documentation and closeout.
This distinction is critical. A purchase order does not guarantee successful project delivery. A supplier may have received an order while engineering information remains incomplete, manufacturing milestones are slipping, inspections are delayed, logistics arrangements are unresolved or final documentation is incomplete. The handbook consequently treats vendor performance as an active project-management responsibility.
The logistics and material-management philosophy follows the same integrated approach. Manufacturing completion is not equivalent to site availability. Materials must pass through inspection, release, packaging, transportation, customs, port handling, inland transportation, receiving, storage, preservation and material issue before they become available to construction.
The construction-management section then brings together the outputs of engineering and procurement and converts them into executable workfronts.
The book emphasizes that construction is the physical realization of engineering and must integrate engineering information, procurement, labor, equipment, materials, subcontractors, workfronts, temporary facilities, quality, HSE, logistics and commissioning.
One of the central concepts of the book is therefore:
Right Information + Right Materials + Right Resources + Right Workfront = Construction Readiness
A late engineering deliverable may delay procurement.
A late vendor drawing may delay engineering.
A delayed equipment shipment may prevent construction.
An unavailable workfront may create labor and equipment idle time.
Poor construction productivity may affect the schedule and cost forecast.
Incomplete testing may delay commissioning.
Incomplete documentation may delay handover.
The EPC Project Manager must therefore understand the cause-and-effect relationships across the entire project lifecycle.
The handbook is therefore intended to serve not merely as a book to read, but as a working reference for EPC project execution. Its underlying philosophy can be summarized as:
Plan → Coordinate → Procure → Monitor → Execute → Measure → Forecast → Correct → Commission → Document → Close → Handover
"Synopsis" may belong to another edition of this title.
California Books
Miami, FL, U.S.A.
AbeBooks seller since October 27, 2023
Shipping rates within U.S.A.
| Item | 3 to 7 business days | 2 to 5 business days |
|---|---|---|
| First item | £ 2.25 | £ 12.78 |
Payment methods
Store description
We have 20 years experience selling books worldwide! Friendly customer support. Your satisfaction guaranteed!
Specialty
All authorized categoriesSeller's business information
Miramar International Services LLC
FL, U.S.A.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to California Books, Fort Wayne, Indiana, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.