ECPPM 2022 - eWork and eBusiness in Architecture, Engineering and Construction 2022
Language: English
Published by CRC Press, 2023
- Hardcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 384.13
Quantity: Over 20 available
Add to basketItem description from seller
Seller Inventory # 850120286
- Title
- ECPPM 2022 - eWork and eBusiness in Architecture, Engineering and Construction 2022
- Publisher
- CRC Press
- Publication year
- 2023
- Condition
- New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 1032406739
- ISBN 13
- 9781032406732
ECPPM 2022 - eWork and eBusiness in Architecture, Engineering and Construction contains the papers presented at the 14th European Conference on Product & Process Modelling (ECPPM 2022, Trondheim, Norway, 14-16 September 2022), and builds on a long-standing history of excellence in product and process modelling in the construction industry, which is currently known as Building Information Modelling (BIM). The following topics and applications are given special attention:
- Sustainable and Circular Driven Digitalisation: Data Driven Design and/or Decision Support Assessment and Documentation of Sustainability Information lifecycle
- Data Management: Collection, Processing and Presentation of Environmental Product Documentation (EPD) and Product Data Templates (PDT)
- Digital Enabled Collaboration: Integrated and Multi-Disciplinary Processes
- Virtual Design and Construction (VDC): Production Metrics, Integrated Concurrent Engineering, Lean Construction and Information Integration
- Automation of Processes: Automation of Design and Engineering Processes, Parametric Modelling and Robotic Process Automation
- Expert Systems: BIM based model and compliance checking
- Enabling Technologies: Machine Learning, Big Data, Artificial and Augmented Intelligence, Digital Twins, Semantic Technology Sensors and IoT Production with Autonomous Machinery, Robotics and Combinations of Existing and New Technical Solutions
- Frameworks for Implementation: International Information Management Series (ISO 19650), and Other International Standards (ISO), European (CEN) and National Standards, Digital Platforms and Ecosystems
- Human Factors in Digital Application: Digital Innovation, Economy of Digitalisation, Client, Organisational, Team and/or Individual Perspectives
Over the past 25 years, the biennial ECPPM conference proceedings series has provided researchers and practitioners with a unique platform to present and discuss the latest developments regarding emerging BIM technologies and complementary issues for their adoption in the AEC/FM industry.
"Synopsis" may belong to another edition of this title.
About the Author
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.97 | £ 41.97 |
Payment methods
Store description
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.