Dynamics of Structures: Second Edition
J. Humar (Carleton University, Ottawa, Ontario, Canada)
New - Soft cover
Condition: New
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. This major textbook provides comprehensive coverage of the analytical tools required to determine the dynamic response of structures. The topics covered include: formulation of the equations of motion for single- as well as multi-degree-of-freedom discre.
Seller Inventory # 599122305
This major textbook provides comprehensive coverage of the analytical tools required to determine the dynamic response of structures. The topics covered include: formulation of the equations of motion for single- as well as multi-degree-of-freedom discrete systems using the principles of both vector mechanics and analytical mechanics; free vibration response; determination of frequencies and mode shapes; forced vibration response to harmonic and general forcing functions; dynamic analysis of continuous systems;and wave propagation analysis.
The key assets of the book include comprehensive coverage of both the traditional and state-of-the-art numerical techniques of response analysis, such as the analysis by numerical integration of the equations of motion and analysis through frequency domain. The large number of illustrative examples and exercise problems are of great assistance in improving clarity and enhancing reader comprehension.
The text aims to benefit students and engineers in the civil, mechanical and aerospace sectors.
Dr. Jag Mohan Humar, is currently Distinguished Research Professor of Civil Engineering at Carleton University, Ottawa, Canada. Dr. Humar obtained his Ph.D. from Carleton University in 1974. He joined Carleton as a faculty member in the Department of Civil Engineering in 1975 and became a full professor in 1983, and served as the Chairman of the Department of Civil and Environmental Engineering from 1989 to 2000.
Dr. Humar’s main research interest is in structural dynamics and earthquake engineering. He has published over 120 journal and conference papers in this and related areas. He is also the author of a book entitled "Dynamics of Structures," published by Prentice Hall, USA in 1990. The second edition of the book has been published by Balkema Publishers of Netherlands in 2002. In February 2000 Dr. Humar led a Canadian Scientific mission to Gujarat to study the damage caused by the Bhuj earthquake.
Dr. Humar is actively involved in the development of seismic design provisions of the National Building Code of Canada. Over the last 15 years he has served as a member of the Standing Committee on Earthquake Design, an advisory body to National Building Code of Canada (NBCC) for its seismic design provisions. During these years the NBCC seismic provisions have undergone substantial revisions, and many of the changes and new requirements have been influenced by Dr. Humar’s work in the field.
Along with teaching, academic administration, and research, Dr. Humar has also been active in engineering consulting He served as a special consultant for several outstanding civil engineering projects, including the National Aviation Museum in Ottawa and the SkyDome in Toronto. He was a seismic design consultant on several other projects, which include the Earthquake Response Study of the Alexandria Bridge across the Ottawa River, Seismic Rehabilitation of the Victoria Museum, Ottawa, Blast Load Analysis of the Mackenzie Tower, Parliamentary Precinct, Ottawa. He also served as a member and chair of the experts panel to review the seismic rehabilitation and upgrade of the West Block, Parliamentary Precinct, Ottawa.
Dr. Humar has received several awards for his outstanding contributions to teaching, research, engineering practice, and the profession.
Dr. Humar serves as a field referee for many international journals including the ASCE Journals of Structures and Engineering Mechanics, the Journal of Sound and Vibration, the Journal of Structural Dynamics and Earthquake Engineering, and the Canadian Journal of Civil Engineering. For 7 years he served as an Associate Editor for the Canadian Journal of Civil Engineering. Currently he is the Associate Editor of the International Journal of Earthquake Engineering and Structural Dynamics."About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
Order quantity | 16 to 45 business days | 16 to 45 business days |
---|---|---|
First item | £ 42.71 | £ 42.71 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.