Drivers of Continuous Improvement in Construction Health, Safety, and Wellbeing
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Nnedinma Umeokafor, PhD, FHEA, FAPM, MCIOB, is a Chartered Construction Manager, an Executive Member of the Institution of Occupational Safety and Health (IOSH), and Programme Director and Senior Lecturer at the University of Greenwich, .
Seller Inventory # 1710142940
This Handbook presents opportunities, best practices, and case studies backed by cutting edge research on the drivers of continuous improvement of health, safety, and wellbeing in the architecture, engineering, construction, and facility management sector. The book consists of 23 chapters with six themes covering:
● Drivers of the business case for healthier and safer construction
● Opportunities and drivers of digital technologies for improving health and safety
● Drivers of human factors for improving health and safety
● Drivers of safer design and procurement
● Drivers of better health and wellbeing for construction.
● Opportunities for driving equality and inclusivity for safer construction.
The book will be beneficial to academics, undergraduate and postgraduate (research and taught) students, professional institutions (such as the Institution of Occupational Safety and Health), health and safety professionals (health and safety officers, consultants and managers), occupational health professionals, mental health and wellbeing professionals, construction managers, architects, project professionals, engineers (design, construction, project, site, electrical, mechanical, civil, building services, and structural), facilities managers, quantity surveyors, and site managers. The aim of the book is to provide critical perspectives alongside evidence based practical examples of success stories, that should inspire readers and engender continuous improvement in health, safety, and wellbeing in the construction industry.
Nnedinma Umeokafor, PhD, FHEA, FAPM, MCIOB, is a Chartered Construction Manager, an Executive Member of the Institution of Occupational Safety and Health (IOSH), and Programme Director and Senior Lecturer at the University of Greenwich, London UK. While Health Safety and Wellbeing is Dr Umeokafor's main area of research, other areas are not limited to regulation and compliance; construction and project management; equality, diversity and inclusion; and higher education research.
Fidelis A. Emuze, PhD, is a Professor and Head of the Department of Built Environment at the Central University of Technology, Free State (CUT), South Africa. Lean construction, health, safety, and sustainability constitute the primary research interest of Dr Emuze, who is a National Research Foundation (NRF) C rated researcher that has published over 250 research outputs and received over 25 awards and recognitions.
Jochen Teizer, PhD, a Professor in the Department of Civil and Mechanical Engineering at the Technical University of Denmark (DTU) where his research seeks injury-free, lean, and green construction work environments. He earned a PhD from The University of Texas at Austin in 2006 and a Dipl.-Ing. from the Karlsruhe Institute of Technology in 2002. Prof. Teizer is the Director of the Construction Automation and Information Technologies Laboratory at DTU and Vice-President of Industry Membership and Outreach for the International Association for Automation and Robotics in Construction (IAARC).
Abimbola Windapo, PhD, is a Professor at the Department of Construction Economics and Management, University of Cape Town, with more than 34 years of experience in practice, teaching, and research in the construction industry and projects. She has held various teaching and administrative positions at the University of Cape Town and the University of Lagos, Nigeria, and gained professional experience as a construction professional at Bouygues Nigeria Ltd and in private consulting.
Riza Yosia Sunindijo, PhD, is Associate Professor in the School of Built Environment, The University of New South Wales (UNSW), in Sydney, Australia. He obtained his Bachelor of Engineering in Civil and Master of Engineering in Construction Management from Petra Christian University, Master of Engineering in Construction Engineering and Infrastructure Management from Asian Institute of Technology, and a PhD from UNSW.
Che Khairil Izam Che Ibrahim, PhD, P. Tech, is a Professor at the School of Civil Engineering, College of Engineering, Universiti Teknologi MARA, Malaysia, where he is currently the Head of School. He holds a PhD Degree from the University of Auckland, New Zealand.
Tariq Umar PhD, EUR ING, completed his PhD degree in construction management from London South Bank University and registered as a Chartered Civil Engineer (CEng) with Engineering Council UK. He has more than 18 years of international experience involving different positions in industry and academia. He is an approved mentor of the Institution of Civil Engineers and helps graduate engineers to become professionally qualified engineers.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.64 | £ 41.64 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.