A Distributed Coordination Approach to Reconfigurable Process Control
Language: English
Published by Springer London, 2007
Series: Book 15 of 74 - Springer Series in Advanced Manufacturing
- Hardcover
- New

Seller: moluna, Greven, Germanymoluna
AbeBooks seller since July 9, 2020
Condition: New
£ 82.48
Quantity: Over 20 available
Add to basketItem description from seller
Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Presents research in the field of distributed automation and control within the process industriesNirav Chokshi is a Visiting Researcher with the Centre for Distributed Automation and Control at the University of Cambridge. He has worked in th.
Seller Inventory # 4286342
- Title
- A Distributed Coordination Approach to Reconfigurable Process Control
- Author
- Nirav Chokshi|Duncan McFarlane
- Publisher
- Springer London
- Publication year
- 2007
- Condition
- New
- Binding
- Gebunden
- Language
- English
- ISBN 10
- 1848000596
- ISBN 13
- 9781848000599
- Series
- Book 15 of 74: Springer Series in Advanced Manufacturing
Success in the continuous process industries depends upon the ability to adapt to the demands of global supply chains in real-time. Thus, process plants must be designed to be easily reconfigured as and when necessary. “A Distributed Coordination Approach to Reconfigurable Process Control” presents research that addresses this issue, via developing a new distributed framework that will enable the building of a process control system that is capable of reconfigurability. This framework views the process as a set of readily-integrated, modular process elements, which operate relatively independently and are each supported by a degree of stand-alone decision-making capability. The rationale and benefits of moving towards the new approach is demonstrated by means of a worked example of a real process plant. The research will also help end-users to gain an understanding of the economic aspects of material flows across their plants, and the ways in which their processes can be integrated across the enterprise.
"Synopsis" may belong to another edition of this title.
About the Author
Nirav Chokshi is a Visiting Researcher with the Centre for Distributed Automation and Control at the University of Cambridge. He has worked in the chemical industry and the nuclear industry, where he was involved in a variety of small-to-medium scale projects on design and maintenance of process automation systems. His research interests include distributed automation, systems integration and process optimization and control.
Duncan McFarlane is a Professor of Service and Support Engineering at the Engineering Department of the University of Cambridge, and Head of the Distributed Information & Automation Laboratory within the Institute for Manufacturing. He is also Director of the Cambridge Auto-ID Lab and Research Director of two industrially supported activities: the Service and Support Engineering Programme and the Aero ID Programme. He has been involved in the design and operation of automation and information system for the manufacturing supply chain for twenty years. His research interests include manufacturing control & automation, modular manufacturing systems design, analysis and synthesis of co-operative control systems, information filtering, model tuning and adaptation, manufacturing systems integration, fault diagnostics, automated identification systems, quality control, and supply chain execution systems.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.18 | £ 42.18 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.