Digital Technologies for Engineering Construction Information Productivity
Language: English
Published by CRC Press, 2025
- Softcover
- New

Condition: New
£ 67.51
Quantity: 1 available
Add to basketSeller Inventory # 2388943125
- Title
- Digital Technologies for Engineering Construction Information Productivity
- Author
- Fonbeyin Henry Abanda
- Publisher
- CRC Press
- Publication year
- 2025
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 1032758740
- ISBN 13
- 9781032758749
Digital Technologies for Engineering Construction Information Productivity goes beyond other digital construction books by examining how emerging digital construction technologies and other popular technologies developed by, for example, Microsoft can be used in improving the productivity of construction information.
The book discusses both the theory and practice through use-case illustrations in integrated software environments and successfully blends applications and workflows of construction technologies with more common and non-industry-specific software systems. It seeks to unleash the power of readily available digital technologies in optimizing the productivity of construction project information management.
This book is essential for students, academics, educators, construction professionals, and construction software developers. For students, the book provides a solid foundation in understanding digital construction technologies including building information modelling (BIM) and some selected Microsoft Products and their applications in managing construction project information. For academics and educators, it will provide insights into research niches around integration of the different digital technologies and serve as a useful text for teaching at undergraduate and postgraduate levels in Architecture, Engineering, and Construction (AEC) subjects. Professionals will find this useful for the adoption of digital technologies in their own practice while software developers will find this beneficial in the development of interoperability software for efficient information exchange between the various software systems.
"Synopsis" may belong to another edition of this title.
About the Author
Fonbeyin Henry Abanda is an Associate Professor at the École Nationale Supérieure des Travaux Publics in Yaoundé, Cameroon, and formerly served as a Reader and Associate Professor in Construction IT at the School of the Built Environment, Oxford Brookes University, United Kingdom. His research interests are in the areas of Semantic Web, Digital Construction Technology, and Artificial Intelligence. He has worked on research projects funded by the Engineering and Physical Sciences Research Council, the International Labour Organisation and the Intergovernmental Panel on Climate Change. He has designed, implemented and delivered BIM related modules on the undergraduate and postgraduate courses in the School of the Built Environment, Oxford Brookes University. He is currently supervising a number of PhD students working on construction project management, facilities management, BIM, Digital Twins and the Semantic Web. Henry has delivered BIM lectures in so many countries including India, Ecuador, Cameroon, Kenya, Ethiopia, Ghana, Nigeria, Spain, France, UK, Canada, Finland, Germany, The Netherlands, etc. Henry was the lead facilitator in training 180 construction professionals through hands-on workshops on the use of BIM for construction project management and quantity surveying in the UK.
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 13 to 40 business days | 13 to 40 business days |
|---|---|---|
| First item | £ 41.46 | £ 41.46 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Online Handel nur mit Neubüchern
Seller's business information
Moluna GmbH
Engberdingdamm 27
Greven, Germany 48268
Terms of sale
About Us
Legal website operator identification:
Moluna GmbH
Represented by the general manager Helge Blischke
Engberdingdamm 27
48268 Greven
Germany
Telephone: 02571/5698933
Telefax: 02571/5698930
E-Mail: abe@moluna.de
VAT No.: DE296281834
listed in the commercial register of the local court Steinfurt
Commercial register number - Part B of the commercial register - 10553
We are a member of the initiative „FairCommerce“ since 24.07.2015.
For more information, see: www.haendlerbund.de/faircommerce.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.