Designing Wind Turbines (eng)
Ritschel, Uwe
Sold by Brook Bookstore On Demand, Napoli, NA, Italy
AbeBooks Seller since 11 October 2022
New - Hardcover
Condition: New
Ships from Italy to U.S.A.
Quantity: Over 20 available
Add to basketSold by Brook Bookstore On Demand, Napoli, NA, Italy
AbeBooks Seller since 11 October 2022
Condition: New
Quantity: Over 20 available
Add to basketQuesto è un articolo print on demand.
Seller Inventory # 6Z25UJEZIE
Designing a wind turbine is an interdisciplinary process that requires an understanding of challenges for all parties involved. The authors deliver an effective and economic way to organize such a design by respecting all the challenges involved. The book provides such insight by utilizing specific examples of existing modern designs. Detailed descriptions and explanations are given for those components of the wind turbine that are normally developed by the so-called original equipment manufacturers (OEM) of a particular type. The OEM needs to have full knowledge of the complete system that consists of all parts being rotor blades, nacelle, drive train, tower, and foundation including the dynamic properties and the response to the controller action. This full knowledge is called system competence. For a wind turbine the drive train is the most important system. It consists of many components like shafts, bearings, gearbox, and generator for a wind turbine with a gear box; in systems without a gearbox a large generator has to be integrated into the drive train.
Dr. Uwe Ritschel studied physics and received his Ph.D. in 1989. After several years in fundamental research in 2000, he joined the engineering department of Nordex, a wind turbine manufacturer. In 2002 he established the Windrad Engineering GmbH and worked as managing director. The main business is the development of new wind turbines for international customers from the wind industry. Since 2014 he works as the Chair of Wind Energy Technology at the University of Rostock. In 2019 he co-founded the independent research institute IWEN working more generally on renewable energies and energy transition.
Dr. Michael Beyer received his Ph.D. in physics in 1985. He held several research and teaching positions in different countries including Germany, U.S.A., Switzerland, and several visiting and research grants on basic research. He is affiliated to the University of Rostock since 1994. In 2008 he entered the wind business and from 2014 until 2021 he was managing director of Windrad Engineering GmbH, an independent engineering office and design house for wind turbines. He shares his experience through supervising, consulting, and is presently teaching mechanical aspects of wind energy at the University of Kassel.
"About this title" may belong to another edition of this title.
Account dedicated to Print on Demand titles.
CANCELLATION
You can send a cancellation request from the order page while the package has not yet been shipped. After that we cannot ensure we can retrieve the parcel but we suggest you to get in touch with us in order to verify the case.
INVOICE
You can request the invoice to be issued together with the shipment of the order or, at the latest, in the same month of the shipment.
RETURNS
If you want to return your order, please contact us for authoriz...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Brook Bookstore On Demand, Bristol, United Kingdom, +39 3485885209, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
| Order quantity | 25 to 40 business days | 60 to 60 business days |
|---|---|---|
| First item | £ 5.81 | £ 436.59 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.