Designing, Selecting, Implementing and Using APS Systems
Vincent C. S. Wiers|A. (Ton) G. de Kok
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Explores how APS structures can be designed, complementing existing production control conceptsUtilizes an operations research view on managing uncertainty with advanced production control concepts and the pragmatic APS approachExplains both the rol.
Seller Inventory # 154279745
Vincent C. S. Wiers (Schiedam, 1969) graduated as an Industrial Engineer from the Eindhoven University of Technology (EUT) in 1993. He started a PhD project at the same university in the department of Industrial Engineering and completed the project in 1997 with a thesis on the Human Factor in Production Control. Subsequently, he started working at Bolesian/Cap Gemini, focussing on knowledge based technology, supply chain management and advanced planning & scheduling (APS). In 2000 he joined CMG, where he carried out several projects in the field of supply chain management. In 2001, he also re-joined EUT as a researcher.
In 2003, he started his own consultancy company Twinlog, focussing on the implementation of APS systems. Since 2003, Vincent Wiers has carried out over 40 APS projects. He has implemented planning systems for companies producing metals, chemicals, meat, packaging materials, electronics, carpets, automotive components, tobacco, and companies focussing on transportation, outside broadcasting, rail maintenance, port operations, and others. Apart from implementation projects, Vincent has designed functional architectures, carried out software selection projects, and carried out studies to redesign production control structures and processes. His projects were located in Europe, North-America, Asia and Africa.
In September 2004, his former Cap Gemini colleague Erik Maas joined Twinlog as a partner and worked together with Vincent Wiers for almost 10 years. On July 17th, 2014, Erik stepped on board of flight MH17 heading for Kuala Lumpur, and his life ended a few hours later. Vincent Wiers continued his work for Twinlog alone.
The first book co-authored by Vincent Wiers appeared in 2004, which was on Practical Production Control, and written together with Prof Ken McKay. It was translated into Japanese and Russian. He participated in the research network on Human and Organisational Factors in Industrial Planning and Scheduling (HOPS). His research was done together mainly with Prof Jan C. Fransoo. In 2011, Vincent Wiers was appointed Industrial Fellow at Eindhoven University of Technology (EUT). Together with Prof Ton de Kok, he started up a course on APS. In 2015, another book by Ken McKay and Vincent Wiers appeared, on Manufacturing Excellence.
Vincent Wiers has published about 16 journal papers and 5 book chapters. He has written numerous columns for Dutch professional magazines, websites and social media groups. His main research focus is the human factor in production control and the use of decision support systems for production control tasks.
Vincent Wiers is married and has one daughter and two sons. He lives in Eindhoven.
Ton de Kok graduated at the Rijksuniversiteit Leiden, The Netherlands in Mathematics and Economics in 1981. After 4 years under the supervision of prof. Henk C. Tijms he attained the doctorate (Ph.D. degree) in 1985 from the Free University of Amsterdam. Thereafter he joined the Centre for Quantitative Methods (CQM) of Philips Electronics in Eindhoven, The Netherlands as consultant in Operations Research. During 5 years he participated in over 20 client projects in the field of logistics and production management. In 1990 he became Certified Fellow in Production and Inventory Management (CFPIM) of the American Production and Inventory Control Society (APICS). From 1990-1992 he was a teaching professor at Boston University Brussels. In 1990 he was appointed Manager Logistics Innovation of Philips Consumer Electronics. In 1991 he was appointed part-time professor in Industrial Mathematics at Technische Universiteit Eindhoven. Since 1992 he is a full time professor Operations Management at the same university. He has published over 85 articles in international scientific journals. He is the Director of the European Supply Chain Forum (eSCF). He was a member of the board of VLM (Logistics Management Association) from 1997-2000. From January 1, 2003 till July 1, 2008 he was Scientific Director of the research school Beta. In 2004 he was Edelman Award Finalist as member of the Philips Semiconductors team. In 2006 he received the ISIR Service Award. In September 2008 Ton de Kok became Fellow of the research school Beta. In August 2014 he was granted the honor of being appointed as Fellow of the International Society for Inventory Research (ISIR). He is Academic Director of the TiasNimbas Executive Master on Operational Excellence and member of the TiasNimbas Academic Council. He has been invited for guest lectures at a multitude of US top schools. Recently he was keynote speaker at StochMod 2014 in Mannheim, ILS 2012 in Quebec, Mostly OM 2012 in Beijing, MSOM 2010 in Haifa, ORSIS 2009 in Tel Aviv, and GOR 2008 in Augsburg. Ton de Kok was head of the capacity group Operations Planning, Accounting, and Control (OPAC) in the department of Industrial Engineeringand Innovation Sciences from April 1, 2008 to July 1, 2014. In 2006 he established the supply chain optimization software company ChainScope and is currently CTO.
Ton’s main research areas are Supply Chain Management and Concurrent Engineering with emphasis on quantitative analysis. His research results have been successfully tested and implemented in a multitude of projects with industry. For the next 5 years his research focus is on SCM in Configure-To-Order supply chains and SCM in process industry.
Ton is married, has a son and two daughters and lives in Bergeijk, close to Eindhoven.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 41.60 | £ 41.60 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.