Decoding Reliability-Centered Maintenance Process for Manufacturing Industries: 9th Discipline of World Class Maintenance Management – The 12 Disciplines
Language: English
Published by Independently published, 2021
- Softcover
- New

Seller: Ria Christie Collections, Uxbridge, United KingdomRia Christie Collections
AbeBooks seller since March 25, 2015
Condition: New
£ 61.44
Quantity: Over 20 available
Add to basketItem description from seller
In English.
Seller Inventory # ria9798718105797_new
- Title
- Decoding Reliability-Centered Maintenance Process for Manufacturing Industries: 9th Discipline of World Class Maintenance Management – The 12 Disciplines
- Author
- Angeles, Rolly
- Publisher
- Independently published
- Publication year
- 2021
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 13
- 9798718105797
- Item weight
- 1,103 grams
- Series
- Book 7 of 12: World Class Maintenance Management
Although RCM is a popular maintenance strategy, many manufacturing industries are still not implementing this process and continue to remain stuck in their current PM tasks tasks. The main reason why I wrote this book is that doing RCM in a manufacturing plant is a bit different from doing RCM in an oil and gas, power plants, and other similar plants because their equipment losses are different. There are many cases when breakdowns and failures are not the primary cause of equipment downtime. Although the process of how RCM is done will be the same. If you worked in a semiconductor plant, breakdowns and failures are not the main problemss on the machines, but minor stoppages, changeover, and quality problems are. What is important for is to know thy boundaries between what RCM can address and what it cannot.
RCM will address failures and breakdowns by proposing maintenance tasks. It is not designed to address every possible equipment losses. What I am saying is that failures are just a subset of the entire equipment losses. Suppose you have chronic quality problems caused by the equipment, RCM can address some of them, but not all, since Quality problems and defects are much broader than breakdowns and failures. I have a detailed explanation of what particular losses RCM can and cannot address in Chapter 3.3.2 of this book. This book is written to help provide detailed guidelines in implementing RCM for manufacturing industries on their machines, equipment, and assets.
Some of the highlights of this book include:
- 27 Frequently Asked Questions (FAQ) on RCM
- 22 Tips on Implementing RCM- 15 Don'ts About RCM
- Why the RCM Preparatory Stage is Important
- Detailed Guidelines in Doing the RCM Preparatory Step
- Can RCM Address All Equipment Losses?
- Actual Case Study on RCM: Air Handling Unit Case
- Role of Operators in the RCM Analysis
- How to Integrate RCM into the TPM Process
- Bonus: RCM Forms in Excel Format
- The RCM and TPM Crossroads – Do they have different or the same paths
- Strengthening the SAE JA1011 Criteria
- Addressing MRO Spare Parts after Implementing RCM
- How to Determine the Correct Interval for PM, PdM, FFT, and Switching Standby Components
- MRO Decision Diagram on Whether to Stock or Not to Stock
- Difference Between a Failure Mode and a Root Cause
- Secondary Tasks for Doing On-Condition Tasks
- Detailed Guidelines in Writing the RCM Decision Worksheet Explained
- Detailed Guidelines in Writing the RCM Information Worksheet Explained
- Detailed Guidelines in performing Horizontal Replication for Similar Equipment with similar Operating Context
- Detailed Guidelines in Conducting the RCM Audit and many more . . .
RCM can be explain two folds, on the equipment side and on the human side. From an equipment perspective, Reliability-Centered Maintenance is a process used to determine any physical asset's maintenance tasks, decisions, and requirements in its current or present operating context. It is also a process used to determine what must be done to ensure that any physical assets continue to do whatever their users want them to do in their present operating context. From the human perspective, RCM is a way or process of capturing and extracting the knowledge, experience, and wisdom of the most experienced people in the plant and transforming it into a living document and their legacy.
"Synopsis" may belong to another edition of this title.
Ria Christie Collections
Uxbridge, United Kingdom
AbeBooks seller since March 25, 2015
Shipping rates from United Kingdom to U.S.A.
| Item | 6 to 12 business days | 6 to 12 business days |
|---|---|---|
| First item | £ 18.33 | £ 18.33 |
Payment methods
Store description
Hello! Ria Christie Collections is an online venture that was initially set up in 2012 to sell books. We do not have a physical high street store. We are professional online booksellers. We only sell brand new books in perfect condition that we source from various suppliers and the publishers. Primarily, our aim is to provide an excellent service to all our customers. We always work as a team to achieve this. Our other objectives are to: 1. Ensure that all our products reach their destination quickly in a safe and secure manner 2. Answer to all our customer queries within 24 hours 3. Ensure that our customers are happy with their purchases 4. Provide all the items at a competitive price 5. Always listen to our customers Ria Christie Collections is not a registered company. It is a Sole Trader venture. Other key information is shown below: Contact Person Name: Rakesh Luchmun (Mr) Storefront Name: Ria Christie Collections Place of Establishment Address: Suite B; ARUN House; ARUN Building Arundel Road Uxbridge UB8 2RR United Kingdom E-Mail Address: riachristie@hotmail.co.uk VAT Number: GB 160 5650 25 We always work hard and aim to comply with all of Abebooks Policies. If you have any issues, please do not hesitate to write to us whether before or after a purchase. We promise to reply to you promptly and, in any case, within 24 hours. Thank you kindly! Yours sincerely Mr Rakesh Luchmun (Founder) and the Ria Christie Collections Team…
Specialty
Educational books, Textbooks, Fiction, Non- fictionSeller's business information
Ryefield Investments Limited
175 Pield Heath Road
Uxbridge, United Kingdom UB8 3NL
Terms of sale
All Returns and Refund are as per Abebooks policies.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Ria Christie Collections, Uxbridge, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 2 business days. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required. Thank you!