Decoding Reliability-Centered Maintenance Process for Manufacturing Industries: 10th Discipline on World Class Maintenance Management (7)
Language: English
Published by Rolando Santiago Angeles, 2021
- Softcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 92.03
Quantity: 2 available
Add to basketItem description from seller
426 pages. 11.00x8.50x0.87 inches. In Stock.
Seller Inventory # x-1649456115
- Title
- Decoding Reliability-Centered Maintenance Process for Manufacturing Industries: 10th Discipline on World Class Maintenance Management (7)
- Author
- Angeles, Rolly
- Publisher
- Rolando Santiago Angeles
- Publication year
- 2021
- Condition
- Brand New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 1649456115
- ISBN 13
- 9781649456113
- Item weight
- 0.98 kilograms
- Series
- Book 7 of 12: World Class Maintenance Management
There are cases where breakdowns and failures are not the primary cause of equipment downtime, especially in manufacturing industries. Although RCM is a popular strategy, still many manufacturing industries are not implementing this process and continue to remain stuck in their PM tasks. The main reason why I wrote this book is that doing RCM in a manufacturing plant is a bit different from doing RCM in oil and gas, power plants, and other similar plants because their equipment losses are different, although the process on how RCM is done will be the same. If you worked in a semi-conductor plant, breakdowns and failures are not the main issues, but minor-stoppages, changeover, or quality problems are. You must know the boundary between what RCM can address and what it cannot. RCM will address failures and breakdowns by proposing tasks; it is not designed to address every possible equipment loss. What I am saying is that failures are just a subset of the entire equipment losses. Suppose you have chronic quality problems caused by the equipment; RCM can address some of them, but not all, since Quality problems and defects are much broader than breakdown and failures. I have a detailed explanation of what particular losses RCM can and cannot address in Chapter 3.3.2 of this book. This book is written to help industries implementing RCM on their machines, equipment, and assets. Some of the highlights of this book includes:
- 27 Frequently Asked Questions (FAQ) on RCM
- 22 Tips on Implementing RCM- 15 Don'ts About RCM
- Why the RCM Preparatory Stage is Important
- Can RCM Address All Equipment Losses?
- Actual Case Study on RCM
- How to Integrate RCM into the TPM Process
- Bonus: RCM Forms I used in Excell Format
- The RCM and TPM Crossroads-
- Strenghtening the SAE JA1011 Criteria
- Addressing MRO Spare Parts after Implementing RCM
- How to Determine the Correct Interval for PM, PdM, FFT, and Switching Standby Components
- MRO Decision Diagram on Whether to Stock or Not to Stock
- Difference Between a Failure Mode and a Root Cause
- Secondary Tasks for Doing On-Condition Tasks
- Details in Writing the RCM Decision Worksheet Explained
- Details in Writing the RCM Information Worksheet Explained
- Details in performing Horizontal Replication for Similar Equipment with the Same Operating Context
- Details in Conducting the RCM Audit
- And more . . .
In this book, I have explained two definitions of RCM, which is looking on the equipment side and the human side of doing it. Reliability-Centered maintenance is a process used to determine any physical asset's maintenance tasks, decisions, and requirements in its current or present operating context. It is also a process used to determine what must be done to ensure that any physical assets continue to do whatever their users want them to do in their present operating context. On the human and softer definition, RCM is a way or process of capturing and extracting the knowledge, understanding, and wisdom of the most experienced people in the plant and transforming it into a living document and their legacy. In most cases, when these good old folks go away and retire for good, they bring everything they know to their grave, and the plant hires fresh employees with little or no experience and starts everything from the very beginning. We just want to put a stop to this never-ending cycle.I have also explained in this book how to implement RCM more successfully by restoring the equipment first. If the plant is implementing Total Productive Maintenance, the integration of these two methodologies is explained in detail in this book.
"Synopsis" may belong to another edition of this title.
About the Author
Rolly is a seasoned international maintenance and reliability consultant with over 30 years of solid experience in the field. He has been invited to different countries and has conducted reliability and maintenance training in United Arab Emirates, Qatar, India, Malaysia, Indonesia, Brunei, Thailand, Nigeria, Bangladesh, South Africa, China, and Botswana. His maintenance training portfolio includes maintenance and reliability courses on TPM, Lubrication, Tribology, Condition-Based Maintenance, RCM, RCFA, TPM Planned Maintenance, Autonomous Maintenance 7 Steps, World Class Maintenance Management, The 12 Disciplines, Oil Contamination Control, Maintenance Indices, and KPI's, Maintenance and Reliability Management Strategies and much more. Rolly previously worked with Amkor Technology Philippines as a TPM Senior Engineer, an industry engaged in manufacturing Integrated Circuit products and spearheaded their Planned Maintenance organization, composed of maintenance managers and engineers. He was also responsible for dramatically reducing unplanned breakdowns in their TPM Journey and RCM implementation on their Facilities AHU units and substation equipment.
Rolly is currently working as an independent reliability and maintenance consultant. Rolly is a graduate of Mechanical Engineering from Mapua Institute of Technology in the Philippines, batch 1985, and passed the licensure board examination the following year in 1986. With 30 years of solid experience, he had worked in various industries from shipping, woodworking, foundry, cast-iron machining, assembly lines, semiconductor manufacturing, and the mining industry. Here, he gained hands-on experience and understanding of TPM and RCM, respectively, a strategy from both the west and the east. His last corporate employment was in 2002, where he worked as a technical training specialist at Lepanto Consolidated Mining Industry. In 2005, Rolly retired early from the industry and decided to establish his own consulting business, RSA Reliability and Maintenance Consultancy Firm, where he dedicates his time and passion for working as an independent reliability and maintenance consultant. He provides inhouse training, consultation, and facilitation to different maintenance and reliability best practices.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 12.50 | £ 30.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.