Decarbonisation and Digitization of the Energy System
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Consists papers related to smart grid, renewable energy, its integration, and DERs in the networkIncludes a unique collection of chapters from academic researchers and practitionersPresents cutting-edge research in the emerging fields of mi.
Seller Inventory # 1128556587
The book contains select proceedings of the International Conference on Smart Grid Energy Systems and Control (SGESC 2023). The proceedings are divided into 02 volumes, and this volume focuses on the Decarbonisation and Digitization of the Energy System. The book covers the important topics on the smart grid/microgrids and control aspects, optimal energy scheduling, distributed generation, wind energy for remote electrification, forecasting of loads and daily energy demand, reactive power management, Volt-Var control, reactive power procurement, and ancillary services, the role of FACTS devices for reactive power management and control, feasibility study of PV/Wind hybrid systems, electricity markets, stability of the power system network, energy storage systems and electrical vehicles. This book is a unique collection of 27 chapters from different areas with a common theme and will be immensely useful to academic researchers and practitioners in the industry.
Dr. Ashwani Kumar did his B. Tech. in Electrical Engineering from Govind Vallabh Pant University of Agriculture and Technology. Pant Nagar, Uttrakhand in 1988 in honors, did his M. Tech. in Power Systems from Punjab University Chandigarh in 1993 in honors and PhD degree from IIT Kanpur in 2003 in the area of power systems. He hold post doctoral position during 2008 at Tennessee Tech. University, USA.
He is currently Professor in the Department of Electrical Engineering at NIT Kurukshetra and coordinator School of Renewable Energy and efficiency, SREE. He has interest in the areas of power system operation, Power Systems Restructuring, Distributed Generation and Renewable Energy Systems, FACTS applications to Power Systems, Demand Side Management, Smart grid/micro grid technology.
He has completed sponsored projects awarded by DST and a project during his Post Doc. Program at Tennessee Technological University USA. He has guided 14 PhDs and 55 M. Tech. scholars. He has120 publications to his credit in the archival journals of repute and 165 publications in IEEE Confs and scopus indexed confs. He has received POSOCO Power System awards a joint venture of Power Grid and FITT IIT Delhi for guiding best M. Tech. thesis among top 25 in India consecutively in the years 2013 to 2018. He is a recipient of best paper awards by National system Coference NSC NIT surathkhal, Litteratti award by International Journal of Emerald IJESM. He has organized IEEE conferences and Int. conferences on Smart Grid, Energy systems and Control, SGESC-2021, and 2023. He visited USA, Italy, Australia, Netherlands, Uni. Of Malasiya for academic activities. 5 PhD scholars and 3 M.Tech. Scholars are doing thesis under his guidance currently. He is involved with various administrative activities in the Institute and is presently is coordinator of the School of Renewable Energy and efficiency, SREE. He is fellow member of Institution of Engineers, Fellow IETE, India, Senior memberIEEE, life member ISTE.
Prof S. N. Singh obtained his M. Tech. and Ph. D. in Electrical Engineering from Indian Institute of Technology Kanpur, in 1989 and 1995. Presently, Prof Singh is Director, Atal Bihari Bajpayee- Indian Institute of Information Technology and Management Gwalior (MP), India (on leave from Professor (HAG), Department of Electrical Engineering, Indian Institute of Technology Kanpur, India). Before joining IIT Kanpur as Associate Professor, Dr Singh worked with UP State Electricity Board as Assistant Engineer from 1988 to 1996, with Roorkee University (now IIT Roorkee) as Assistant Professor from 1996 to 2000 and with Asian Institute of Technology, Bangkok, Thailand as Assistant Professor from 2001 to 2002. He was ViceChancellor of Madan Mohan Malviya University of Technology Gorakhpur during April 2017 to July 2020. Dr Singh received several awards including Young Engineer Award 2000 of Indian National Academy of Engineering (INAE), Khosla Research Award of IIT Roorkee, and Young Engineer Award of CBIP New Delhi (India), 1996. Prof Singh is receipt of Humboldt Fellowship of Germany (2005, 2007) and Ottomonsted Fellowship of Denmark (2009-10). Prof Singh became first Asian to receive 2013 IEEE Educational Activity Board Meritorious Achievement Award in Continuing Education. He is also recipients of INAE Outstanding Teacher Award 2016 and IEEE R10 region (Asia-Pacific) Outstanding Volunteer Award 2016. Dr Singh is appointed as IEEE Distinguish Lecturer of Power & Energy Society from 2019 and Industry application Society for 2019-2021. He is also recipient of NPSC 2020 Academic Excellence Award and 2021 IEEE Industry Application Society (IAS) Outstanding Educator/ Mentor Award.
His research interests include power system restructuring, FACTS, power system optimization & control, security analysis, wind power, etc. Prof Singh has published more than 500 papers (h-index=57, Citation=12k+) in International/ national journals/conferences and supervised 40 PhD (8 PhD under progress). He has also written 30 book chapters, 8 Edited books and 2 text-books one on Electric Power Generation, Transmission and Distribution and second is Basic Electrical Engineering, published by PHI, India. Prof Singh has completed three dozen of technical projects in India and abroad. His two NPTEL (YouTube) video lectures on HVDC Transmission and Power System Operation & Control are very popular. Prof Singh was Chairman, IEEE UP Section for 2013 & 2014, IEEE R10 (Asia-Pacific) Conference & Technical Seminar Coordinator 2015-18 and R10 Vice-Chair, Technical Activities (2019-2020). Presently Prof Singh is Immediate Past Chairman of IEEE, India Council. Dr Singh is Fellows of IEEE (USA), IET (UK), INAE, IE(I), IETE, AvH.
Dr. Pradeep Kumar is an Assistant Professor in the Department of Electrical Engineering at the National Institute of Technology (NIT) in Kurukshetra, India. His areas of research are artificial intelligenceApplications in Power Systems, Smart Grid, Substation Design especially, Earthing and Bonding based on IEEE-80 2000 (with ETAP), Direct Stroke Lightning Protection using IEEE 998, and Insulation coordination. Transmission Line Design and Planning, Power Quality.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.37 | £ 42.37 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.