- Softcover
- New

Condition: New
£ 68.14
Quantity: 10 available
Add to basketItem description from seller
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Pages Number: 290 Publisher: Science Pub. Date :2009-09-01 first edition this book to high rainfall areas of highway construction projects as the basis. closely around the asphalt pavement damage in the process of engineering problems and the urgent need to address The key scientific issues. on-site investigation and qualitative evaluation of combined theory and numerical simulation of combined laboratory and field monitoring combined technology development and application of the method of combining engineering. system carried out under the multi-physics coupling asphalt pavement structure and laws of the failure mechanism. the formation of a theory of financial analysis. experimental research. numerical simulation. on-site monitoring. materials research and process design as one of the asphalt pavement structure damage evolution and control technology for asphalt pavement The damage control to provide a reliable technical support. This book is available in transportation engineering. geotechnical engineering and materials engineering design. construction. management and researchers to read. but also universities and research institutes for teachers. students and researchers and other information. Contents: Preface Chapter 1 Introduction 1.1 Background asphalt pavement damaged asphalt pavement damage at home and abroad 1.2 Research 1.2.1 damage to asphalt pavement structure formation mechanism of asphalt pavement structure 1.2.2 Stability 1.2.3 Asphalt Pavement Evaluation Study 1.3 Dynamic model of coupled structures the main contents of the book's overall structure of the framework 1.4 book. Chapter 2. asphalt pavement structure analysis of characteristics and mechanisms of damage 2.1 damage to asphalt pavement structure characteristics of 2.2 asphalt pavement structure failure mechanism of the early stress of 2.3 asphalt pavement structure under load failure mechanism of the body temperature of 2.4 under load of asphalt pavement failure mechanism of the body temperature of the asphalt pavement 2.4.1 destructive effects of temperature on the asphalt pavement 2.4.2 destructive effects of 2.5 hydraulic asphalt pavement structure under load 2.5.1 the failure mechanism of the body structure of water damage to asphalt pavement 2.5.2 main body of water damage to asphalt pavement layer occurs 2.6 Summary Chapter 3 asphalt pavement structure damage to multi-physics numerical model 3.1 asphalt pavement body stress field model 3.2 asphalt pavement structure heat transfer surface temperature field model 3.2.1 The structure of non-state heat conduction model 3.2.2 of asphalt road surface temperature distribution of the external factors 3.2.3 asphalt pavement structure analysis of thermal parameters 3.3 asphalt surface water infiltration model structure 3.4 asphalt pavement structure coupled numerical model of coupled mathematical model of asphalt pavement 3.4.1 3.4.2 build coupled model numerical format 3.5 asphalt pavement structure coupled multi-physics analysis system 3.5.1 Analysis System MCAP About 3.5.2MCAP system features 3.6 Summary Chapter 4 asphalt pavement structure under stress deformation response of asphalt pavement on the 4.1-car characteristics of the role of wheel loads of asphalt pavement 4.1.1 Analysis 4.1.2 axle load and tire pressure. relationship between the tire contact area of ??the asphalt pavement structure 4.2 Analysis 4.2.1 asphalt pavement dynamic load mode of the vehicle load of asphalt pavement structure 4.2.2 Overview 4.2.3 Vehicle model and the displacement of the asphalt pavement stress distribution law of Section 4.3 Summary Chapter 5 Temperature - under stress coupled dynamic behavior of asphalt pavement structure under the conditions of 5.1 day cycle temperature distribution in the asphalt pavement 5.2 model parameters on temperature distribution of asphalt pavement structure effects 5.2.1 Impact An.…
Seller Inventory # LH5923
Bibliographic details
- Title
- Damaged asphalt multi-field coupling effects and control technology
- Author
- //
- Condition
- New
- Binding
- paperback
- ISBN 10
- 7030255380
- ISBN 13
- 9787030255389
Shipping rates from China to U.S.A.
| Item | 16 to 30 business days | 8 to 16 business days |
|---|---|---|
| First item | £ 13.47 | £ 22.46 |
Payment methods
- Bank Wire Transfer
- Paypal
Store description
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Specialty
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesSeller's business information
ANJINGYU LIMITED
No.99 King Fuk ST, RM D07, 8/F KAI TAK FTY BLDG
San Po Kong, Hong Kong
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to liu xing, Nanjing, JS, China, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.