Damage Detection and Structural Health Monitoring of Concrete and Masonry Structures
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 1853461774
This book offers the use of artificial intelligence, image processing, model analysis, laser scanners, shearography, drones, contourlet, wavelet, signal processing techniques and other SHM techniques to detect the damages in the concrete as well as masonry structures. Corrosion is one major factor that causes reinforced concrete structures to deteriorate over time. However, the degrading process is not evenly distributed throughout the structure. The damage can be detected timely and the structure's degradation model can be updated with the help of proper monitoring and inspection techniques. The damages in the masonry structures may happen due to moisture ingress, cracking, mortar failure, settlement and spalling, etc. Structure health monitoring (SHM) may assist in understanding the structures deterioration mechanisms and reducing the ongoing deterioration in a scientific manner. A complete detail of both the traditional and cutting-edge approaches used in the SHM process is described in this book. The latest non-destructive techniques and semi-destructive techniques shall also be discussed in this book. This book aids academics and industry professionals with recent developments in SHM techniques. Additionally, it encourages researchers in coming up with creation of newer applications in structural engineering.
Dr. Hashem Jahangir is an assistant professor in Civil Engineering Department of the University of Birjand, Iran. He completed his doctoral degree at the Ferdowsi University of Mashhad in 2018. His research interests are damage detection, structural health monitoring, structural retrofit, seismic analysis, applying AI and ML techniques.
Dr. Harish Chandra Arora is presently affiliated with CSIR-Central Building Research Institute, Roorkee, India, as Principal Scientist in the Structural Engineering Group. He obtained the Doctoral degree in structural engineering from the Indian Institute of Technology (IIT), Roorkee, India, in 2017. He has more than 28 years of R&D experience in the field of structural engineering. His research interests include distress diagnosis, repair and rehabilitation of corroded structures, structural analysis and design and retrofitting and strengthening of structures with FRP and FRCM. His research works have been credited in national as well as international journals. He has supervised more than 100 students for Bachelor of Technology and Masters of Technology programs and also supervised research scholars pursuing doctoral programs at the Central Building Research Institute, Roorkee, India.
Dr. J. V. Araujo dos Santos is professor of Mechanical Engineering at Instituto Superior Tecnico, University of Lisbon, Portugal and researcher at IDMEC – Instituto de Engenharia Mecanica. He has many publications in structural damage identification. His research interests are composite structures, structural dynamics, computational solid mechanics, structural optimization, and structural health monitoring.
Krishna Kumar (Senior Member, IEEE) is currently a researcher in the Department of Water Resources Engineering and the Center for Advanced Middle Eastern Studies at Lund University, Sweden. He did his bachelor's in Electronics and Communication Engineering from Govind Ballabh Pant Engineering College, Pauri Garhwal, Uttarakhand, India. He pursued his master’s in digital systems from Motilal Nehru National Institute of Technology, Allahabad, India, and received his Ph.D. degree from the Indian Institute of Technology Roorkee, India in 2006, 2012, and 2023, respectively.
He served as a postdoctoral research fellow at the School of Electrical & Electronics Engineering in the Rolls-Royce Corporate Lab, Nanyang Technological University, Singapore, from August 2023 to March 2024. Previously, he held the position of Senior Engineer Research at the Rolls-Royce @ NTU Corporate Lab, Singapore, from February 2023 to July 2023. Prior to that, he worked as an Assistant Engineer at UJVN Ltd. (A State Government PSU of Uttarakhand) from January 2013 to February 2023. His expertise includes the design, installation, commissioning, testing, and operation & maintenance of hydro, solar, and wind power plants.
Dr. Kumar has also served as an Assistant Professor/Lecturer on a term appointment basis at Kumaon Engineering College, Dwarahat, Uttarakhand; Bharat Institute of Technology, Meerut; and Uttaranchal Institute of Technology, Dehradun, for almost three years.
Furthermore, Dr. Kumar has published numerous research articles in reputed journals. He has also authored/edited many books with publishers such as Elsevier, Wiley, Taylor & Francis, Springer, and River Press.
His current research interests include Renewable Energy, Multiphase Machines, Electrical Equipment Health Monitoring Systems, AI/ML, and data science.
Aman Kumar hails from Bilaspur, Himachal Pradesh, India. He holds a Master of Engineering degree in Construction Technology and Management from the prestigious National Institute of Technical Teacher's Training and Research Institute in Chandigarh, India. His academic journey is underscored by a deep passion for various facets of civil engineering, including sustainability development, non-destructive testing, concrete technology, and strengthening techniques such as fiber-reinforced polymer and fiber-reinforced cementitious matrix. He is also deeply engaged in exploring corrosion protection techniques for structural design, as well as the cutting-edge domains of artificial intelligence and the Internet of Things. Now his focus is to solve complex structural engineering problems with machine learning as well as deep learning algorithms. Aman Kumar's dedication to the field is evident through his extensive research endeavors and comprehensive technical surveys. His scholarly pursuits have culminated in numerous research papers and book chapters, which have been featured in esteemed international scientific publications.
Dr. Nishant Raj Kapoor received his M.Tech. degree in construction technology and management from the NITTTR, Bhopal, India. At present, he is pursuing Ph.D. degree in engineering sciences with the CSIR-CBRI, Roorkee. His research interests include built environment, COVID-19, indoor human comfort, IEQ, comfort perceptions, building energy efficiency, AI, ML, environmental engineering, etc.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ‘consumer’ is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
In order to exercise your revocation right, you must inform us (Moluna GmbH, Münsterstr. 105, 48268 Greven, Telephone number: 02571/5 69 89 33, Fax number: 02571/5 69 89 30, E-Mail address: abe@moluna.de) of your decision to revoke this contract by means of a clear declaration (e.g. a letter sent via post, fax or email). You can use the enclosed specimen revocation form for this, which however is not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts.
The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To Moluna GmbH, Engberdingdamm 27, 48268 Greven, Fax number: 02571/5 69 89 30, Email address: abe@moluna.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.42 | £ 42.42 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.