Critical Infrastructure Systems and Extreme Threat Nexus: Preparing for Resilience and Security
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt.
Seller Inventory # 2708886028
This book synthesizes the findings from a collaborative workshop featuring leading experts from academia, government, and industry, aimed at addressing the intricate interdependencies between climate change, cybersecurity, and critical infrastructure resilience.
Delve into key themes such as the vulnerabilities of our energy sector against emerging hazards, the role of autonomous uncrewed systems in maintaining undersea infrastructure, and the metrics necessary for a climate-adapted cyber-physical grid. With chapters like Mapping Critical Infrastructure Interdependencies and Beyond the Trend: Climate Variability as a Threat Multiplier, this book provides a nuanced understanding of how climate change exacerbates risks and challenges across various sectors.
The workshop's dynamic format, including keynote presentations, tabletop exercises, and scenario mapping, has informed the development of actionable strategies for enhancing resilience. Readers will gain insights into diversified reservoir management for water security, the implications of quantum technology on cybersecurity, and the need for a robust response to climate variability.
This book is essential for policymakers, researchers, and practitioners seeking to navigate the complexities of climate adaptation and risk management. Join us in exploring innovative pathways to secure our infrastructure and ensure a sustainable future in the face of unprecedented challenges.
Matthew Huber
David E. Ross Professor in the Earth, Atmospheric, and Planetary Sciences Department at Purdue University
Matthew Huber is a professor in the Earth, Atmospheric, and Planetary Sciences Department at Purdue University and the inaugural David E. Ross Director of the Institute for a Sustainable Future, Purdue’s transdisciplinary institute working on both fundamental and applied research in areas aligned with the United Nations Sustainable Development Goals. Huber’s scholarship has been internationally recognized for its far-reaching global conclusions on Earth’s habitability, resilience, and sustainability on long time horizons. His research areas include the physical processes generating tropical “thermostats,” the polar amplification of warming, and the environmental, economic, ecological and evolutionary implications of these processes. Over the past decade, Huber’ has shifted focus to emphasize more applied and solutions-oriented research to help society build a better future. Planning for future needs requires seeing energy, environment, economics, climate, health, politics and society as linked systems and considering risk, resiliency, and security in all of these areas concurrently.
Marthie Grobler
Principal Research Scientist, CSIRO
Dr Marthie Grobler is a Principal Research Scientist at CSIRO’s Data61, where she leads CSIRO’s strategic portfolio on Critical Infrastructure Protection and Resilience. Her research focuses on strengthening the security and resilience of essential systems and services by addressing cybersecurity governance, risk mitigation, and the complex interdependencies across critical infrastructure sectors. With a strong emphasis on human factors and digital trust, Grobler’s work enhances the usability and adoption of security solutions in real-world environments. She is actively involved in executive education and policy development, contributing to national efforts to build infrastructure resilience and public confidence in digital systems. Her work informs cyber policy and capability-building initiatives, helping ensure that Australia’s critical infrastructure remains secure, adaptive, and interconnected in the face of evolving threats.
Rossitza Homan
Manager, Resilience and Regulatory Effects Department, Sandia National Laboratories
Dr. Rossitza Homan is a distinguished leader at Sandia National Laboratories, where she oversees research, capability development, and the deployment of critical solutions for national security missions. As the head of the Risk and Resilience of Complex Systems department, Dr. Homan is dedicated to creating innovative, scientifically sound solutions that provide decision-makers across the national security enterprise with valuable insights, thereby enhancing the resilience of critical infrastructures in the physical, cyber, and information domains. Dr. Homan drives strategic initiatives, fosters partnerships, and manages large, multidisciplinary projects that support national security, global security, integrated deterrence, and complex systems resilience. She leads teams working with both U.S. government and non-government agencies, focusing on areas such as multi-modal intelligence, cyber-physical resilience, and artificial intelligence. Her collaborative efforts extend to U.S. Federally Funded R&D Centers, academia, and various domestic and international stakeholders.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 16 to 45 business days | 16 to 45 business days |
|---|---|---|
| First item | £ 42.09 | £ 42.09 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.