Corrosion Management and Control in Desalination: An Industrial Guide
Language: English
Published by Ampp, 2023
- Softcover
- New

Seller: California Books, Miami, FL, U.S.A.California Books
AbeBooks seller since October 27, 2023
Condition: New
£ 101.92
Quantity: Over 20 available
Add to basketSeller Inventory # I-9781575904221
- Title
- Corrosion Management and Control in Desalination: An Industrial Guide
- Author
- Francis, Roger; Meroufel, Abdelkader
- Publisher
- Ampp
- Publication year
- 2023
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 1575904225
- ISBN 13
- 9781575904221
The world's population is steadily increasing and with it is an increasing demand for freshwater, for both drinking and irrigation. In many areas of the world, particularly in arid regions, there are limited freshwater sources such as rivers and groundwater, so desalination is being increasingly used to produce freshwater to satisfy both requirements. Although desalination is sometimes carried out on brackish waters and highly saline well waters, most desalination plants generate fresh water from seawater with a daily production that reached 95 million m3/day in 2019.
Drs. Francis and Meroufel have been active in all types of desalination plants for many years, either solving corrosion problems, or, less often, preventing them from happening. There are very few publications that discuss the specific corrosion problems in desalination plants, and there are none written with the plant engineer in mind. Plant engineers often do not have an in-depth knowledge of corrosion, and because of this, they need help with day-to-day problems that may involve corrosion.
Modern desalination plants are often designed with a 40-year lifespan, so it is important that plant engineers know how to tackle corrosion problems to maintain water production without shutdowns or, in extreme cases, shortening plant life.
This book was conceived as being a helpful guide that can sit on an engineer's desk, and which will give advice not just on diagnosing corrosion failures, but on how to monitor the plant's resistance to corrosion by inspection and monitoring.
"Synopsis" may belong to another edition of this title.
California Books
Miami, FL, U.S.A.
AbeBooks seller since October 27, 2023
Shipping rates within U.S.A.
| Item | 3 to 7 business days | 2 to 5 business days |
|---|---|---|
| First item | £ 0.00 | £ 9.06 |
Payment methods
Store description
We have 20 years experience selling books worldwide! Friendly customer support. Your satisfaction guaranteed!
Specialty
All authorized categoriesSeller's business information
Miramar International Services LLC
FL, U.S.A.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to California Books, Fort Wayne, Indiana, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.