Conveyors: Application, Selection, and Integration (Systems Innovation Book Series)
Language: English
Published by CRC Press, 2009
- Hardcover
- Used

Seller: Zoom Books East, Glendale Heights, IL, U.S.A.Zoom Books East
AbeBooks seller since July 1, 2024
Condition: Used - Very good
£ 46.94
Quantity: 1 available
Add to basketItem description from seller
Book is in very good condition and may include minimal underlining highlighting. The book can also include "From the library of" labels. May not contain miscellaneous items toys, dvds, etc. . We offer 100% money back guarantee and 24 7 customer service.
Seller Inventory # ZEV.1439803889.VG
- Title
- Conveyors: Application, Selection, and Integration (Systems Innovation Book Series)
- Author
- McGuire, Patrick M
- Publisher
- CRC Press
- Publication year
- 2009
- Condition
- very_good
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 1439803889
- ISBN 13
- 9781439803882
- Series
- Book 10 of 65: Systems Innovations
Put simply, this is probably the first book in 40 years to comprehensively discuss conveyors, a topic that seems mundane until the need arises to move material from point A to point B without manual intervention. Conveyors: Application, Selection, and Integration gives industrial designers, engineers, and operations managers key information they must consider to determine which type of conveyor to purchase and how to optimally integrate it into their system to meet their transport needs.
Tapping into his more than 20 years of experience in the materials handling industry, the author discusses requirements for specific products or materials and environmental factors, covering operation in extreme temperatures. Each chapter details a specific type of conveyor―including chain, belt, and gravity varieties―and highlights its primary features, such as load capacity and rate, and operation. The text also addresses costs and objectives of material handling, exploring rate calculations, controls systems, and other relevant aspects. It includes photographs of actual installations and a glossary of key terms.
Learn from the Experience of a Conveyor Expert
Unless you have conveyor experience, you’ll need help deciding on the best mode of transportation for your product. This volume stands apart as an aid in this decision process because it does not take a myopic view of one specific type of conveyor. Rather than solely covering bulk material handling or screw conveyors, it analyzes all of the major varieties of conveyors. This book is not meant to be an engineering manual for designing conveyors, but rather a broader guide to integrating conveyors in a transportation system.
"Synopsis" may belong to another edition of this title.
About the Author
Patrick McGuire has been in the material handling industry for more than 20 years. He has a BS degree in computer integrated manufacturing systems and his professional engineering license for industrial engineering. He started with a very small conveyor manufacturer in upstate New York, J & S Conveyors, where he was the Engineering Manager. They designed and built a wide variety of conveyors. They manufactured tabletop chain conveyors, flat belt conveyors, heavy unit load conveyors, and troughed belt conveyors.
After J & S, he went to work for Rapistan, the world’s largest manufacturer of material handling systems. Rapistan has since been bought by Siemens AG. Rapistan specialized in unit handling, primarily distribution systems. McGuire was involved with the office that also specialized in-process manufacturing systems. They built one-of-a-kind conveyors and systems for giants such as Corning, Kodak, Xerox, General Motors, Ford, and Chrysler. He worked as a senior systems engineer and a project manager.
After 10 years of custom product and system design, he took a position with the products group, where he worked on such things as the high-speed divert for airport baggage and then became the product manager for the heavy unit load product line. In that position McGuire led a group of engineers in designing, documenting, and selling a full line of pallet handling conveyors. He has since worked as the Director of Product Engineering for American Ironhorse Motorcycles, and the Director of Manufacturing and Technology for Transnorm System, a specialty conveyor manufacturer.
Currently, McGuire is the Manager of Engineering Services for Glidepath, which is leading a movement of business and engineering systems integration and automation. As a member of CEMA, he co-authored or edited several chapters of the new CEMA Application Guide for Unit Handling Conveyors.
"About the title" may belong to another edition of this title.
Zoom Books East
Glendale Heights, IL, U.S.A.
AbeBooks seller since July 1, 2024
Shipping rates within U.S.A.
| Item | 4 to 8 business days | 2 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 3.81 |
Payment methods
Store description
Zoom Books Company operates an online book store striving to provide top tier customer service. We respond to all inquiries and resolve any complaints in a timely manner. Thank you for shopping with us!
Specialty
Fiction/Non-Fiction, variesSeller's business information
Acirassi Books Ltd.
918 16th Ave NW, #25
Calgary, AB Canada T2M0K3
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Zoom Books East, Lynden, Washington, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.