Contemporary Issues in Geoenvironmental Engineering
Book 15 of 59: Sustainable Civil InfrastructuresSingh, D. N.|Gallaa, Abdullah
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketDieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Presents the advancements in the field of geomaterial & waste management and the associated geoenvironmental issuesSheds the lights on various creative valorization techniques of municipal and industrial wastes as well as dredged sediments.
Seller Inventory # 150711161
With high urbanization rates, advancement in technologies, and changes in consumption behavior of people, wastes generated through the daily activities of individuals and organizations pose many challenges in their management. The articles presented in this edited volume deal with the attempts made by the scientists and practitioners to address contemporary issues in geoenvironmental engineering such as characterization of dredged sediments, geomaterials & waste, valorization of waste, sustainability in waste management and some other geoenvironmental issues that are becoming quite relevant in today's world. This volume is part of the proceedings of the 1st GeoMEast International Congress and Exhibition on Sustainable Civil Infrastructures, Egypt 2017.
ABDULLAH GALAA ABDELAAL, Ph.D., P.Eng.
Abdullah has more than twelve years of experience in the fields of geotechnical/geoenvironmental engineering and waste management through conducting research, teaching and providing consulting services. He has a bachelor degree in civil engineering from Cairo University, Egypt, and obtained a PhD degree from the University of Toronto, Canada and is licensed professional engineer in Ontario, Canada. Abdullah’s research focused on assessing the liquefaction potential of stabilized mine waste and characterizing its stiffness development using non-destructive techniques. After PhD, research focus tuned to the behavior of sustainable construction materials (Rammed Earth) and the reuse of dredged marine sediments. Abdullah was involved in solving geotechnical/geoenvironmental engineering problems including design of landfills, dewatering and hydrogeology, slope stability, deep and shallow foundations, and earth retention systems; he planned and led many site investigation and quality control programs. Abdullah was involved in large scale infrastructure projects such as subway tunnels and landfills. In addition, Abdullah was involved as a consultant in planning and supporting entrepreneurial groups working in the waste management sector. Recently, Abdullah was involved, as a consultant, in establishing the first industrial waste exchange program in Egypt as well as identification and assessment of key policy reformsand investment options to reduce air, water and land pollution in Egypt.
D. N. SINGH
Prof. Singh is an Institute Chair Professor at Department of Civil Engineering, Indian Institute of Technology Bombay, India. He obtained B. Tech., M. Tech. And Ph. D. From Indian Institute of Technology, Kanpur, India, during 1986, 1989 and 1993, respectively. He mainly researches and practices Environmental Geotechnology an upcoming field in the realm of Civil and Geotechnical Engineering. His research is multidisciplinary and focused on ‘geomaterials characterization’ by employing various energy fields. In the process, he and his research group have successfully evolved several ‘need-based’ instrumentation that has become a panacea for dealing with the issues being faced by the contemporary society due to rapid and uncontrolled industrialization. He is Editor-in-Chief of Environmental Geotechnics, a journal published by the Institution of Civil Engineers, UK. He is recipient of Young teachers’ award (instituted by the AICTE, New Delhi), 2003 SP Research Award (instituted by Shamsher Prakash Foundation, Rolla, MO, USA); John R. Booker Excellence Award-2011 (instituted by IACMAG, USA) and Richard Feynman Prize 2014 (instituted by the ICE, UK). He is a fellow of American Society of Civil Engineers (ASCE).
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 42.52 | £ 42.52 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.