Construction engineering and measurement (installation works part) ---- 2012 Cost Engineer qualification test(Chinese Edition)
Language: Chinese
Published by Jiangsu Science and Technology Press, 2000
- Softcover
- New

Condition: New
£ 53.64
- Bank Wire Transfer
- Paypal
Quantity: 1 available
Add to basketItem description from seller
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pub Date :2012-05-01 Pages: 191 Publisher: Jiangsu Science and Technology Press Information title: construction engineering technology and metering (installation works part) ---- Cost Engineer 2012 the licensing examination years Zhenti test sites classified complete solution List Price: 38.00 yuan price: 38.0 yuan 0.0 yuan discount you save: 100 folding author: Zhao Bin editor Publisher: Jiangsu Science and Technology Publishing Date :2012-5-1ISBN: 9787534592768 Number of words: 320.000 yds: 191 times: 1 Binding: Paperback Editors' Choice 1. the examination subjects instructions and knowledge to explain the video. \ N 2. Authors is the industry's authoritative the Cost Engineer qualification examination training teacher. \ N 3. Summarized to integration three-year Zhenti. break sets of questions in the form. and clear review focus. which will help the candidates repeated learning for its own weak test sites to test sites. \ N 4. The Zhenti simulation title-by-title resolution and detailed knowledge expand. help candidates more comprehensive and accurate grasp of the exam knowledge points. smooth clearance. \ N Summary \ n This book is divided into two parts. the first part Zhenti test sites classified: according to the the chapter summarizes exam proposition law. and nearly three years of the examination of the perfect combination and classified to the corresponding test sites. detailed analysis and knowledge expand help candidates master Proposition test sites further study can be repeated for the weak test sites. The second part of simulation questions and solutions: well-written three sets of simulation questions. Mock Test Questions. questions. score. and the proportion of knowledge of each chapter with reference to the examination of the perfect set and parse each question for the candidates in the sprint stage to use. \ N directory the first part Zhenti test sites classified \ the n Chapter installation engineering materials \ n propositions law analysis \ n the typical Zhenti \ n test center is an installation of engineering materials properties and uses of the classification Ye \ n the test center the two profiles Ye plate Ye pipe Ye wire types Ye performance and use \ n test center three commonly used pipe pieces Ye annex to the performance of the type of Ye and use \ n test center four anti-corrosion Ye thermal insulation material of the type Ye performance and use \ n test center five electrical materials and equipment of the type of Ye performance and use \ n Chapter II Installation Construction the \ n propositions law \ n typical Zhenti \ n test center a welding Ye purge Ye Ye heat treatment to cleaning the Ye rust Ye Ye brush oil adiabatic construction processes and methods \ n test center two cutting Ye skim Ye passivation the film Ye Ye pre-the liner construction technology and method \ n test center classification and method of three-pressure test \ n test sites. four lifting methods and classification \ n Chapter project management planning \ n propositions law \ n the typical Zhenti \ n test center a construction project management planning classification of Ye role of \ n test center two installation construction project management planning framework \ n test center three installation construction project management implementation planning content and preparation method \ n Chapter the installation works metering method \ n propositions law \ n the typical Zhenti \ n test center an installation engineering the BOQ projects set and projects the amount of calculation rules \ n test center two installation works engineering calculation method \ n test center three installation works different list and different pricing stage engineering measurement \ n test center four Alternative professional engineering group metering Practice \ the n Chapter generic engineering installation \ n propositions l.…
Seller Inventory # EG049382
- Title
- Construction engineering and measurement (installation works part) ---- 2012 Cost Engineer qualification test(Chinese Edition)
- Author
- ZHAO BIN ZHU BIAN
- Publisher
- Jiangsu Science and Technology Press
- Publication year
- 2000
- Condition
- New
- Binding
- paperback
- Language
- Chinese
- ISBN 10
- 7534592763
- ISBN 13
- 9787534592768
"Synopsis" may belong to another edition of this title.
Shipping rates from China to U.S.A.
| Item | 16 to 30 business days | 8 to 16 business days |
|---|---|---|
| First item | £ 13.42 | £ 22.37 |
Store description
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Specialty
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesSeller's business information
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
JS, China
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to liu xing, Nanjing, JS, China, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.