Construction Quality & Rework Prevention (Paperback)
Language: English
Published by Independently Published, 2026
- Softcover
- New

Seller: Grand Eagle Retail, Bensenville, IL, U.S.A.Grand Eagle Retail
AbeBooks seller since October 12, 2005
Condition: New
£ 17.84
Quantity: 1 available
Add to basketItem description from seller
Paperback. The waterproofing membrane looked finished. Miguel Santos had walked it, clipboard in hand, and told you it was ready. Then the inspection failed. It is a site crisis every project manager knows too well. The crew has already moved to the next level. The concrete pour schedule has been shifted, access equipment struck, and the crane is on hire. Everyone involved has already decided the work is done. But on Wednesday morning, the inspector spots a tiny failure. Suddenly, a "finished" floor turns into days of costly rework, a delayed concrete pour, idle trades, and a painful, embarrassing conversation with the client. The real enemy isn't a careless subcontractor or a difficult inspector. The enemy is late quality discovery-a project structure that allows the truth about the work to surface only when it is too late to do anything about it cheaply. A defect caught before the crew leaves the floor costs minutes. A defect caught at inspection costs a rework cycle. A defect caught after the next trade has covered the work costs demolition, exposure, re-inspection, and commercial warfare. In Construction Quality & Rework Prevention, Daniel R. Whitmore reveals a game-changing truth: quality is a project management responsibility, not a delegated QA/QC task. This is not an inspection manual or a generic textbook. It is a field playbook for project managers who want to build quality into the work before inspection, catch defects early, and stop throwing away their profit margins on preventable rework. Stop Repairing the Work. Correct the Production System. Follow project manager Alex Morgan as he transitions from reactive defect-fixing to proactive quality control. Alongside superintendent Miguel Santos, commercial manager Rachel Kim, senior PM Priya Shah, and the sharp new Quality Manager, Nina Patel, you will learn how to build right the first time: Manage Quality Where Work is Planned: Control staffing continuity, sequencing, access, information flow, and commercial pressure long before an inspector ever arrives.Master First-Work Discipline: Stop letting a flawed installation method multiply. Test the method on the first unit, correct it while correction is still cheap, and only then let production scale.Check the Surrounding Conditions: Quality failures often begin in the substrate or predecessor work, not just final workmanship. Learn to verify the conditions before high-risk finishes are applied.Implement Pre-Cover Checklists: Establish a bulletproof pre-cover discipline to verify and photograph embedded, hidden, or concealed work before access disappears forever.Count the Real Cost of Rework: Rework is rarely just the material and labor to redo the work itself. Tally the lost productivity, double-handling, and trade disruption that quietly bleed your margin.Avoid "Closeout Debt" Stop letting minor defects accumulate into a "second project" at handover, leaving you with over 400 punch-list items and missing life-safety records.The Quality Prevention Toolkit Included Each of the 15 chapters closes with a field-tested, printable template to establish a proactive site rhythm: Project Quality Control SheetWorkfront Quality Readiness GatePre-Installation Quality ChecklistSubcontractor Quality Performance ScorecardRepetitive Defect Early-Warning RegisterWeekly Quality Control Meeting TemplateAnd 13 other high-impact quality tools.The cheapest defect is the one the project prevents before it is built. Scroll up, grab your copy of Book Seven today, and take absolute Shipping may be from multiple locations in the US or from the UK, depending on stock availability.…
Seller Inventory # 9798171923877
- Title
- Construction Quality & Rework Prevention (Paperback)
- Author
- Daniel R. Whitmore
- Publisher
- Independently Published
- Publication year
- 2026
- Condition
- new
- Binding
- Paperback
- Language
- English
- ISBN 13
- 9798171923877
It is a site crisis every project manager knows too well. The crew has already moved to the next level. The concrete pour schedule has been shifted, access equipment struck, and the crane is on hire. Everyone involved has already decided the work is done. But on Wednesday morning, the inspector spots a tiny failure. Suddenly, a "finished" floor turns into days of costly rework, a delayed concrete pour, idle trades, and a painful, embarrassing conversation with the client. The real enemy isn't a careless subcontractor or a difficult inspector. The enemy is late quality discovery—a project structure that allows the truth about the work to surface only when it is too late to do anything about it cheaply. A defect caught before the crew leaves the floor costs minutes. A defect caught at inspection costs a rework cycle. A defect caught after the next trade has covered the work costs demolition, exposure, re-inspection, and commercial warfare.
In Construction Quality & Rework Prevention, Daniel R. Whitmore reveals a game-changing truth: quality is a project management responsibility, not a delegated QA/QC task. This is not an inspection manual or a generic textbook. It is a field playbook for project managers who want to build quality into the work before inspection, catch defects early, and stop throwing away their profit margins on preventable rework.
Stop Repairing the Work. Correct the Production System. Follow project manager Alex Morgan as he transitions from reactive defect-fixing to proactive quality control. Alongside superintendent Miguel Santos, commercial manager Rachel Kim, senior PM Priya Shah, and the sharp new Quality Manager, Nina Patel, you will learn how to build right the first time:
- Manage Quality Where Work is Planned: Control staffing continuity, sequencing, access, information flow, and commercial pressure long before an inspector ever arrives.
- Master First-Work Discipline: Stop letting a flawed installation method multiply. Test the method on the first unit, correct it while correction is still cheap, and only then let production scale.
- Check the Surrounding Conditions: Quality failures often begin in the substrate or predecessor work, not just final workmanship. Learn to verify the conditions before high-risk finishes are applied.
- Implement Pre-Cover Checklists: Establish a bulletproof pre-cover discipline to verify and photograph embedded, hidden, or concealed work before access disappears forever.
- Count the Real Cost of Rework: Rework is rarely just the material and labor to redo the work itself. Tally the lost productivity, double-handling, and trade disruption that quietly bleed your margin.
- Avoid "Closeout Debt": Stop letting minor defects accumulate into a "second project" at handover, leaving you with over 400 punch-list items and missing life-safety records.
- Project Quality Control Sheet
- Workfront Quality Readiness Gate
- Pre-Installation Quality Checklist
- Subcontractor Quality Performance Scorecard
- Repetitive Defect Early-Warning Register
- Weekly Quality Control Meeting Template
- And 13 other high-impact quality tools.
"Synopsis" may belong to another edition of this title.
Grand Eagle Retail
Bensenville, IL, U.S.A.
AbeBooks seller since October 12, 2005
Shipping rates within U.S.A.
| Item | 6 to 14 business days | 6 to 16 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Payment methods
Seller's business information
APOLLO ONLINE CORP.
605 Geddes Street
Wilmington, DE U.S.A. 19805
Terms of sale
We guarantee the condition of every book as it¿s described on the Abebooks web sites. If you¿ve changed
your mind about a book that you¿ve ordered, please use the Ask bookseller a question link to contact us
and we¿ll respond within 2 business days.
Books ship from California and Michigan.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Grand Eagle Retail, Bensenville, Illinois, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually ship within 2 business days. All books within the US ship free of charge. Delivery is 4-14 business days anywhere in the United States.
Books ship from California and Michigan.
If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.