Construction Quality Control in the application of advanced technology Manual (Vol.2)(Chinese Edition)
- Softcover
- New

Condition: New
£ 54.96
Quantity: 1 available
Add to basketItem description from seller
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pub Date: November 2012 Pages: 219 Language: Chinese in Publisher: China Building Industry Press. the quality of construction works to control the application of advanced technology Manual (Vol.2) including concrete works. formwork engineering. masonry works. from quality analysis discusses the four aspects of the application of advanced technology. detection methods and objectives. technical prospects (including foreign technology). the preferred advanced applicable technologies to solve the problems on the quality of the project and a common problem. combined with the 10 new technologies. and pointed out that the project quality control effective the application of advanced technology and detection methods. the direction of the development of advanced and applicable technologies. Construction Quality Control in the application of advanced technology Manual (Vol.2) available for building construction technicians and supervisory personnel. reference is also available for colleges and professional teachers. Contents: 1 Concrete Engineering Materials 1.1.1 Concrete Aggregates 1.1.2 Concrete coarse aggregate 1.1.3 Cement 1.1.4 Concrete admixtures 1.1.5 concrete admixtures 1.2 concrete mix analysis than 1.2.1 Quality issues 1.2. advanced and applicable technologies 1.2.3 detection methods and goals 1.2.4 Technical prospects 1.3 concrete mixing 1.3.1 Quality Analysis 1.3.2 applies advanced technology 1.3.3 detection methods and goals 1.3.4 technical outlook 1.4 Concrete transport 1.4.1 Quality Analysis 1.4.2 1.4.3 of the application of advanced technology detection methods and goals 1.4.4 technical outlook 1.5 Concrete pouring 1.5.1 Quality Analysis 1.5.2. advanced and applicable technologies 1.5.3 Technical prospects 1.6 high performance concrete 1.6.1 quality problems analysis 1.7.1 1.6.2 1.6.3 of the application of advanced technology detection methods and goals 1.6.4 technical outlook 1.7 faced concrete quality problem detection analysis 1.7.2 1.7.3 of the application of advanced technology detection methods and goals 1.7.4 technology prospects 1.8 Concrete 1.8 .1 quality analysis 1.8.2 1.8.3 of the application of advanced technology detection methods and goals 1.8.4 Technical prospects concrete cast-in-place concrete structures 2.1 Ma surface 2.1.1 quality problems of advanced and applicable technologies 2.2 2.1 .2 take concrete exposed tendons 2.2.1 Quality Analysis 2.3.1 2.3 2.2.3 2.2.2 advanced applicable technologies Processing Standard concrete cellular quality analysis 2.4.1 2.4 2.3.2 using advanced and applicable technologies concrete holes quality problems 2.4.2 to take advanced and applicable technologies 2.4.3 Detection 2.5 quality of concrete rot 2.5.1 Analysis 2.5.2 to take advanced and applicable technologies 2.5.3 detection methods and goals 2.5.4 Technical prospects 2.6 Concrete folder slag 2.6.1 Quality Analysis 2.6. 2 taken in the application of advanced technology detection 2.6.4 Processing Standard 2.7 concrete structure size deviation 2.6.3 2.7.1 Quality accurate analysis of the cast-in-place concrete embedded parts 2.7.2 advanced and applicable technologies 2.8 Control 2.8.1 embedded parts location importance 2.8.2 How accurate position control when pouring concrete embedded parts 2.8.3 advanced and applicable technologies 2.8.4 Detection 2.8.5 Technical prospects 2.9 concrete laitance too thick 2.9.1 Quality issues in analysis 2.9.2 advanced applicable technologies common quality problems 2.11 2.10 seam construction joints (cold joints) 2.10.1 construction lien 2.10.2 construction joints cracks in floor cracks. 1.2 basement wall cracks (including bulky wall) 2.11.1 2.11.3 bulky the floor concrete cracks of 2.11.4 of concrete frost heave cracks 3 reinforced engineering 3.1 Materials 3.1.1 Quality issues analysis 3.1.2 advanced and applicable technologies 3.1.3 inspection methods and target 3.1. …
Seller Inventory # NE045720
- Title
- Construction Quality Control in the application of advanced technology Manual (Vol.2)(Chinese Edition)
- Author
- ZHU FANG HE CHENG XIANG JIAN SHE BU GONG CHENG ZHI LIANG AN QUAN JIAN GUAN SI . ZHONG GUO TU MU GONG CHENG XUE HUI ZI XUN GONG ZUO WEI YUAN HUI
- Condition
- New
- Binding
- paperback
- ISBN 10
- 7112146488
- ISBN 13
- 9787112146482
"Synopsis" may belong to another edition of this title.
Shipping rates from China to U.S.A.
| Item | 16 to 30 business days | 8 to 16 business days |
|---|---|---|
| First item | £ 13.76 | £ 22.93 |
Payment methods
- Bank Wire Transfer
- Paypal
Store description
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Specialty
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesSeller's business information
ANJINGYU LIMITED
No.99 King Fuk ST, RM D07, 8/F KAI TAK FTY BLDG
San Po Kong, Hong Kong
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to liu xing, Nanjing, JS, China, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.