Construction Project Management
Sears, S. Keoki; Sears, Glenn A.; Clough, Richard H.
Language: English
Published by Wiley, 2000
- Hardcover
- Used

Seller: -OnTimeBooks-, Phoenix, AZ, U.S.A.-OnTimeBooks-
AbeBooks seller since March 9, 2023
Condition: Used - Good
£ 9.03
Quantity: 1 available
Add to basketItem description from seller
A copy that has been read, remains in good condition. All pages are intact, and the cover is intact. The spine and cover show signs of wear. Pages can include notes and highlighting and show signs of wear, and the copy can include "From the library of" labels or previous owner inscriptions. 100% GUARANTEE! Shipped with delivery confirmation, if you're not satisfied with purchase please return item! Ships via media mail.
Seller Inventory # OTV.0471324388.G
- Title
- Construction Project Management
- Author
- Sears, S. Keoki; Sears, Glenn A.; Clough, Richard H.
- Publisher
- Wiley
- Publication year
- 2000
- Condition
- good
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 0471324388
- ISBN 13
- 9780471324386
- Edition
- 4th Edition
Now with a dedicated Web site containing a downloadable version of the premier CPM scheduling software program–Micro Planner Manager(r) from MicroPlanning International for both Windows(r) and Macintosh platforms
This Fourth Edition of Construction Project Management reaffirms the book′s status as the industry–leading, definitive guide to the Critical Path Method (CPM) of project scheduling. It combines a solid foundation in the principles and fundamentals of CPM with particular emphasis on project planning. A highway bridge with a complete cost estimate is used to illustrate each of the principles of project management. Using this basic information and the case studies in the appendix, students are given project management problems and hands–on project management experience.
Important features of Construction Project Management, Fourth Edition include:
∗ Complete coverage of planning and scheduling principles that apply to every type of construction project
∗ Special emphasis on the most difficult and important part of CPM–the planning process
∗ A new chapter on production planning, the process of turning the project plan into efficient workplace operations
∗ New methods for handling construction contingency planning and weather delays
∗ In–depth coverage of the legal aspects of CPM scheduling
∗ Large illustrations conveniently tucked into a back cover pocket
An excellent text for both building construction and construction engineering students, this book is also an indispensable on–the–job reference for builders, architects, civil engineers, and other construction professionals.
"Synopsis" may belong to another edition of this title.
About the Author
S. KEOKI SEARS, MSc, is a senior project manager with CH2MHill and is currently working on a project in Germany.
"About the title" may belong to another edition of this title.
-OnTimeBooks-
Phoenix, AZ, U.S.A.
AbeBooks seller since March 9, 2023
Shipping rates within U.S.A.
| Item | 3 to 8 business days | 2 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 2.98 |
Payment methods
Specialty
Used books of all typesSeller's business information
BookDrop LLC
601 S 54th Ave, STE 101
Phoenix, AZ U.S.A. 85043
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to -OnTimeBooks-, Phoenix, Arizona, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.