Construction Project Cost Training Series: Water Resources and Hydropower Project Cost training (the classic example)(Chinese Edition)
- Softcover
- New

Seller: liu xing, Nanjing, JS, Chinaliu xing
AbeBooks seller since April 7, 2009
Condition: New
£ 41.18
- Bank Wire Transfer
- Paypal
Quantity: 1 available
Add to basketItem description from seller
Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback Pub the Date :2012-08-01 Pages: 179 in Publisher: Jiangsu Science and Technology Press Information title: construction project cost Training Series: Water Resources and Hydropower Engineering Cost Training (classic instance) List Price: 26.00 yuan Author: Press : Jiangsu Science and Technology Press Publication Date: August 1. 2012 ISBN: 9787534595707 words: Page: 179 Edition: 1st Edition Binding: Paperback: Weight: 200 g Editor's Choice Construction Project Cost training series: water conservancy Hydropower Project Cost training Editor's Choice: text sketch Ming. you firmly in the hands of professional knowledge; practical training exercises to prepare you to hone your ability battlefield; to pour expert effort classic instance. the ability to quickly improve. Summary Construction Project Cost training Series: Water Resources and Hydropower Project Cost training as the fundamental basis for the latest norms and standards. a comprehensive exposition of Water Resources and Hydropower Engineering proposed budget. the budget and final accounts. fixed content. Construction Project Cost Training Series: Water Resources and Hydropower Project Cost training is divided into six chapters: the preparation of Water Resources and Hydropower Engineering fixed. the basis of unit price of water conservancy and hydropower engineering. construction. installation engineering unit price. the bill of quantities of water conservancy and hydropower engineering. water conservancy and hydropower project completion of settlement and completion of final accounts. as well as the construction of water conservancy and hydropower project bidding. 1.3 Water Resources and Hydropower Engineering Contents 1 Water Resources and Hydropower Engineering fixed 1.1 Water Resources and Hydropower Engineering Construction Quota 1.2 water conservancy and hydropower project budget norms fixed budget [training] 2 Water Resources and Hydropower Engineering the foundation unit price 2.1 artificial budget Price 2.2 2.3 Construction of material budget price of electricity. wind. water budget fee 2.5 aggregate Price Price 2.4 Construction Machinery Taiwan [training] 3 construction. installation preparation 3.1 earthworks Price Price 3.3 piled stone engineering unit price preparation 3.2 stonework engineering unit price preparation preparation preparation of 3.4 Concrete Engineering Unit Price 3.5 template engineering unit price preparation 3.6 foundation treatment works priced the preparation 3.7 installation engineering unit price establishment [training] 4 Water Resources and Hydropower Engineering BOQ denominated 4.1 BOQ preparation 4.2 Construction Works 4.3 Water Conservancy installation works BOQ project and calculation rules [training] 5 completion of settlement and completion of final accounts of Water Resources and Hydropower Engineering 5.1 5.2 the completion of final accounts 5.3 Project completion settlement evaluation [training] water conservancy and hydropower construction bidding 6.1 Construction to tender 6.2 tendering work agencies and program 6.3 the preparation of the tender offer 6.4 bid decision the tender tips [ Training] reference literature of An Idea. Liaoning Pushihe Pumped Storage Co. senior economist. general manager of Liaoning Pushihe Pumped Storage Co. Ltd. Deputy General Manager; June 2006 to present. limited of Liaoning Pushihe Pumped Storage The general manager of the company. Abstracts preambleFour Satisfaction guaranteed,or money back.…
Seller Inventory # EH073798
Bibliographic details
- Title
- Construction Project Cost Training Series: Water Resources and Hydropower Project Cost training (the classic example)(Chinese Edition)
- Author
- BEN SHE
- Condition
- New
- Binding
- paperback
- ISBN 10
- 7534595703
- ISBN 13
- 9787534595707
Shipping rates from China to U.S.A.
| Item | 16 to 30 business days | 8 to 16 business days |
|---|---|---|
| First item | £ 13.61 | £ 22.68 |
Store description
Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!
Specialty
Chemistry, Mathematics, Computer, Physics, Environment, Social SciencesSeller's business information
NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN
Room 264, Oujiang Shopping Center, No. 1 Dongxin South Road, Dongshan Street, Jiangning District, NanJing
Nanjing, JS China 211100
Terms of sale
We guarantee the condition of every book as it's described on the Abebooks web sites. If you're dissatisfied with your purchase (Incorrect Book/Not as Described/Damaged) or if the order hasn't arrived, you're eligible for a refund within 30 days of the estimated delivery date. If you've changed your mind about a book that you've ordered, please use the Ask bookseller a question link to contact us and we'll respond within 2 business days. Please Note:We don't sell any international Edition to you. Don't send any question about international Edition to us.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to liu xing, Nanjing, JS, China, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Most orders are shipped within 24 hours. We will delivery these items to you by SAL, EUB, EMS, FEDEX etc.