Conquering Complexity
Hinchey, Michael/ Coyle, Lorcan (Editor)
Sold by Revaluation Books, Exeter, United Kingdom
AbeBooks Seller since 6 January 2003
New - Hardcover
Condition: New
Quantity: 2 available
Add to basketSold by Revaluation Books, Exeter, United Kingdom
AbeBooks Seller since 6 January 2003
Condition: New
Quantity: 2 available
Add to basket466 pages. 9.25x6.25x1.00 inches. In Stock.
Seller Inventory # x-1447122968
Software has long been perceived as complex, at least within Software Engineering circles. We have been living in a recognised state of crisis since the first NATO Software Engineering conference in 1968. Time and again we have been proven unable to engineer reliable software as easily/cheaply as we imagined. Cost overruns and expensive failures are the norm.
The problem is fundamentally one of complexity: software is fundamentally complex because it must be precise. Problems that appear to be specified quite easily in plain language become far more complex when written in a more formal notation, such as computer code. Comparisons with other engineering disciplines are deceptive. One cannot easily increase the factor of safety of software in the same way that one could in building a steel structure, for example. Software is typically built assuming perfection, often without adequate safety nets in case the unthinkable happens. In such circumstances it should not be surprising to find out that (seemingly) minor errors have the potential to cause entire software systems to collapse.
The goal of this book is to uncover techniques that will aid in overcoming complexity and enable us to produce reliable, dependable computer systems that will operate as intended, and yet are produced on-time, in budget, and are evolvable, both over time and at run time. We hope that the contributions in this book will aid in understanding the nature of software complexity and provide guidance for the control or avoidance of complexity in the engineering of complex software systems.
Software has long been perceived as complex, at least within Software Engineering circles. We have been living in a recognised state of crisis since the first NATO Software Engineering conference in 1968. Time and again we have been proven unable to engineer reliable software as easily/cheaply as we imagined. Cost overruns and expensive failures are the norm.
The problem is fundamentally one of complexity: software is fundamentally complex because it must be precise. Problems that appear to be specified quite easily in plain language become far more complex when written in a more formal notation, such as computer code. Comparisons with other engineering disciplines are deceptive. One cannot easily increase the factor of safety of software in the same way that one could in building a steel structure, for example. Software is typically built assuming perfection, often without adequate safety nets in case the unthinkable happens. In such circumstances it should not be surprising to find out that (seemingly) minor errors have the potential to cause entire software systems to collapse.
The goal of this book is to uncover techniques that will aid in overcoming complexity and enable us to produce reliable, dependable computer systems that will operate as intended, and yet are produced on-time, in budget, and are evolvable, both over time and at run time. We hope that the contributions in this book will aid in understanding the nature of software complexity and provide guidance for the control or avoidance of complexity in the engineering of complex software systems.
"About this title" may belong to another edition of this title.
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
If you are a consumer you can cancel the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
INFORMATION REGARDING THE RIGHT OF CANCELLATION
Statutory Right to cancel
You have the right to cancel this contract within 14 days without giving any reason.
The cancellation period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the the last good or the last lot or piece.
To exercise the right to cancel, you must inform us, Revaluation Books, Exstowe, Exton, EX3 0PP, Exeter, United Kingdom, 44 1179083586, of your decision to cancel this contract by a clear statement (e.g. a letter sent by post, fax or e-mail). You may use the attached model cancellation form, but it is not obligatory. You can also electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". If you use this option, we will communicate to you an acknowledgement of receipt of such a cancellation on a durable medium (e.g. by e-mail) without delay.
To meet the cancellation deadline, it is sufficient for you to send your communication concerning your exercise of the right to cancel before the cancellation period has expired.
Effects of cancellation
If you cancel this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to cancel with contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to us or Revaluation Books, Edward Bowditch Ltd, Clifton Heights, Triangle West, BS8 1EJ, Bristol, United Kingdom, 44 1179083586, without undue delay and in any event not later than 14 days from the day on which you communicate your cancellation from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of cancellation
The right of cancellation does not apply to:
Model withdrawal form
(complete and return this form only if you wish to withdraw from the contract)
To: (Revaluation Books, Exstowe, Exton, EX3 0PP, Exeter, United Kingdom, 44 1179083586)
I/We (*) hereby give notice that I/We (*) withdraw from my/our (*) contract of sale of the following goods (*)/for the provision of the following goods (*)/for the provision of the following service (*),
Ordered on (*)/received on (*)
Name of consumer(s)
Address of consumer(s)
Signature of consumer(s) (only if this form is notified on paper)
Date
* Delete as appropriate.
Orders usually dispatched within two working days.
| Order quantity | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 12.50 | £ 15.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.