Concrete Repair, Rehabilitation and Retrofitting
Mark G. Alexander
Sold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: 1 available
Add to basketSold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
Condition: New
Quantity: 1 available
Add to basketNew Book. Shipped from UK. Established seller since 2000.
Seller Inventory # FT-9780415396561
The First International Conference on Concrete Repair, Rehabilitation and Retrofitting (ICCRRR 2005) was held in Cape Town, South Africa, from 21-23 November 2005. The conference was a collaborative venture by researchers from the South African Research Programme in Concrete Materials (based at the Universities of Cape Town and The Witwatersrand) and The Construction Materials Section at Leipzig University in Germany.
The conference has come at an opportune moment for concrete construction worldwide and sought to focus on an increasingly important aspect in modern infrastructure provision and retention: that of appropriately repairing, maintaining, rehabilitating, and if necessary retrofitting existing infrastructure with a view to extending its life and maximising its economic return. The conference Proceedings contain papers, presented at the conference, and classified into a total of 15 sub themes which can be grouped under the four main themes of (i) Concrete durability aspects, (ii) Condition assessment of concrete structures, (iii) Concrete repair, rehabilitation and retrofitting, and (iv) Performance monitoring and health assessment. The major interest in terms of submissions exists in the fields of concrete durability aspects in connection with material compositions, NDE/NDT and measurement techniques, repair methods and materials, and structural strengthening and retrofitting techniques. The large number of high-quality papers presented and the wide range of relevant topics covered confirm that these Proceedings will be a valued reference for many working in the important fields of concrete durability and repair and that they form a suitable base for discussion and provide suggestions for future development and research.
Professor Mark G Alexander, Department of Civil Engineering, University of Cape Town, South Africa
Dr Hans-Dieter Beushausen, Department of Civil Engineering, University of Cape Town, South Africa
Dr Frank Dehn, MFPA Leipzig, Germany
Dr Pilate Moyo, Department of Civil Engineering,University of Cape Town, South Africa
"About this title" may belong to another edition of this title.
Returns Policy
We ask all customers to contact us for authorisation should they wish to return their order. Orders returned without authorisation may not be credited.
If you wish to return, please contact us within 14 days of receiving your order to obtain authorisation.
Returns requested beyond this time will not be authorised.
Our team will provide full instructions on how to return your order and once received our returns department will process your refund.
Please note the cost to return any...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to PBShop.store US, Springfield Gardens, New York, U.S.A., +44 1285 712917, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
Books are shipped from our US or UK warehouses. Delivery estimates allow for delivery from either location.
| Order quantity | 7 to 14 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.