Components and Systems
Gerald Staib, Andreas Dörrhöfer, Markus Rosenthal
Sold by Rarewaves USA, HEBRON, KY, U.S.A.
AbeBooks Seller since 10 June 2025
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: 6 available
Add to basketSold by Rarewaves USA, HEBRON, KY, U.S.A.
AbeBooks Seller since 10 June 2025
Condition: New
Quantity: 6 available
Add to basketConstruction systems reduced to the smallest possible number of identical elements have long been used by architects to build structures as well as dismantle and change them as quickly, efficiently, and economically as possible. Think of the architecture of the nomads, the Crystal Palace designed by the architect John Paxton for the London World's Fair of 1851, or the modern construction systems of the nineteenth and twentieth centuries in steel, concrete, and wood. Coupled with modern digital planning and production methods, modular precast construction systems that are adaptable for many combinations and capable of being combined with one other will play an increasingly important role in architecture in the future. The volume Components and Systems offers an in-depth and clearly organized presentation of the various types of precast building components - from semifinished products to building with components, open and closed systems, and skeleton and panel construction all the way to spatial cell constructions. The systems are accompanied by detailed drawings and color photographs. Discussions of transporting and assembling the various systems round off the topic and make this book an indispensable practical companion. Seit jeher werden in der Architektur auf möglichst wenige, gleiche Elemente reduzierte Bausysteme verwendet, um möglichst schnell, effizient und ökonomisch ein Bauwerk errichten oder auch abbauen und verändern zu können. Man denke an die Architektur der Nomaden, den Kristallpalast, der 1851 anlässlich der in London stattfindenden Weltausstellung von dem Architekten John Paxton entworfen wurde, oder die modernen Bausysteme des 19. und 20. Jahrhunderts in Stahl, Beton oder Holz. Elementierte, vorgefertigte, für viele Kombinationen anpassungsfähige und untereinander kombinierbare Systeme werden zukünftig, gekoppelt mit modernen digitalen Planungs- und Produktionsmethoden, einen immer wichtigeren Aspekt in der Architektur darstellen. Der neue Band Elemente und Systeme zeigt fundiert und übersichtlich die verschiedenen Arten vorgefertigter Bauteile auf - von Halbfabrikaten über das Bauen mit Komponenten, offenen und geschlossenen Systemen, Skelett- und Paneelbauweisen bis zu Raumzellenkonstruktionen. Ergänzt werden die Systeme durch detaillierte Zeichnungen und Farbfotos. Transport und Montage der verschiedenen Systeme runden das Thema ab und machen dieses Buch in der Praxis unverzichtbar.
Seller Inventory # LU-9783764386566
Gerald Staib ist Professor für Baukonstruktion und Entwerfen an der TU Dresden
Gerald Staib is a professor of construction and design at the Dresden University of Technology
"About this title" may belong to another edition of this title.
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Rarewaves USA, Coral Springs, Florida, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
Please note that we do not offer Priority shipping to any country.
We currently do not ship to the below countries:
Afghanistan
Bhutan
Brazil
Brunei Darussalam
Channel Islands
Chile
Israel
Lao
Mexico
Russian Federation
Saudi Arabia
South Africa
Yemen
Please do not attempt to place orders with any of these countries as a ship to address - they will be cancelled.
| Order quantity | 9 to 12 business days | 9 to 12 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.