ClimateResilient Infrastructure Adaptive Design and Risk Management
Language: English
Published by Amer Society of Civil Engineers, 2018
Series: Book 14 of 29 - ASCE Manuals and Reports on Engineering Practice
- Hardcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 106.14
Quantity: 2 available
Add to basketItem description from seller
Seller Inventory # __0784415196
- Title
- ClimateResilient Infrastructure Adaptive Design and Risk Management
- Author
- Task Committee on Turbine Generator Foundations (Corporate Author)/ Liu, Hongchun (Editor)
- Publisher
- Amer Society of Civil Engineers
- Publication year
- 2018
- Condition
- Brand New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 0784415196
- ISBN 13
- 9780784415191
- Item weight
- 0.56 kilograms
- Series
- Book 14 of 29: ASCE Manuals and Reports on Engineering Practice
Civil infrastructure systems traditionally have been designed for appropriate functionality, durability, and safety for climate and weather extremes during their full-service lives; however, climate scientists inform us that the extremes of climate and weather have altered from historical values in ways difficult to predict or project. Climate-Resilient Infrastructure: Adaptive Design and Risk Management, MOP 140, provides guidance for and contributes to the developing or enhancing of methods for infrastructure analysis and design in a world in which risk profiles are changing and can be projected with varying degrees of uncertainty requiring a new design philosophy to meet this challenge.
The underlying approaches in this manual of practice (MOP) are based on probabilistic methods for quantitative risk analysis, and the design framework provided focuses on identifying and analyzing low-regret, adaptive strategies to make a project more resilient.
Beginning with an overview of the driving forces and hazards associated with a changing climate, subsequent chapters in MOP 140 provide observational methods, illustrative examples, and case studies; estimation of extreme events particularly related to precipitation with guidance on monitoring and measuring methods; flood design criteria and the development of project design flood elevations; computational methods of determining flood loads; adaptive design and adaptive risk management in the context of life-cycle engineering and economics; and climate resilience technologies.
MOP 140 will be of interest to engineers, researchers, planners, and other stakeholders charged with adaptive design decisions to achieve infrastructure resilience targets while minimizing life-cycle costs in a changing climate.
"Synopsis" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 12.50 | £ 25.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.