Climate Change Effects on Civil Infrastructure
Mohammed M. Ettouney
Sold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: Over 20 available
Add to basketSold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
Condition: New
Quantity: Over 20 available
Add to basketNew Book. Shipped from UK. Established seller since 2000.
Seller Inventory # L2-9781032509570
The design, analysis, maintenance, operations, economics, and life cycle of civil infrastructure is very dependent upon climatic effects. Climate change can have immense effects on the performance and well-being of civil infrastructures, and this book examines how climate change can directly affect civil infrastructure, how different types of infrastructure are affected, and more importantly, how stakeholders can prepare for and counter such changes and approach decision-making in an optimal manner. It includes numerous case studies and examples that help illustrate the different points and methodologies presented.
Mohammed M. Ettouney, PhD, PE, MBA, F AEI, Dist M ASCE, received an honors award from the National Institute of Building Sciences (2015) for developing an advanced materials database, owners performance methods, and codeveloping school safety procedures. His developments of risk and resilience processes for projects related to the U.S. Department of Homeland Security earned him the Anachin Innovation Award (2013). He is a distinguished member in the American Society of Civil Engineers (ASCE) since 2011. Dr. Ettouney is a consulting engineer. He received his Doctor of Science in structural mechanics from the Massachusetts Institute of Technology, Cambridge, Massachusetts, in 1976. Since then, his interest in the field, both as a practitioner and a researcher, has been in multihazards safety of structures, progressive collapse of buildings, uncertainties in structural stability, blast mitigation of numerous buildings around the world, underwater acoustics, seismic analysis and design, structural health monitoring, risk and resilience management of civil infrastructures, and innovative concepts such as the probabilistic boundary element method, scale-independent elements, and framework for evaluation of lunar-based structural concepts. Dr. Ettouney has authored or coauthored more than 400 publications and reports and contributed to and authored several books. He introduced several new practical and theoretical methods in the fields of earthquake engineering, acoustics, structural health monitoring, progressive collapse, blast engineering, and underwater vibrations. He coinvented the “seismic blast” slotted connection. More recently, he introduced the “economic theory of inspection” and “general and special theories of instrumentation,” coined the concept of “resilience management,” and contributed to numerous principles and techniques in the field of infrastructure health―all pioneering efforts that can help in developing durable infrastructures at reasonable costs.
"About this title" may belong to another edition of this title.
Returns Policy
We ask all customers to contact us for authorisation should they wish to return their order. Orders returned without authorisation may not be credited.
If you wish to return, please contact us within 14 days of receiving your order to obtain authorisation.
Returns requested beyond this time will not be authorised.
Our team will provide full instructions on how to return your order and once received our returns department will process your refund.
Please note the cost to return any...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to PBShop.store US, Springfield Gardens, New York, U.S.A., +44 1285 712917, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
Books are shipped from our US or UK warehouses. Delivery estimates allow for delivery from either location.
| Order quantity | 7 to 14 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.