How to Cheat at Administering Office Communications Server 2
Language: English
Published by Syngress Media, 2008
- Softcover
- New

Seller: AHA-BUCH GmbH, Einbeck, GermanyAHA-BUCH GmbH
AbeBooks seller since August 14, 2006
Condition: New
£ 30.89
Quantity: 1 available
Add to basketItem description from seller
Neu - Microsoft Office Communications Server (OCS) 2007 is Microsoft's latest version of Live Communications Server 2005. The product provides management for all synchronous communications that takes place in real time. This includes instant messaging (IM), Voice over IP (VoIP), and audio conferencing and videoconferencing. It will work with your company's existing telecommunications systems without major hardware upgrades. This means your business can deploy advanced VoIP and conferencing without tearing out its preexisting legacy telephone network. How to Cheat at Administering Microsoft Office Communicator 2007 provides the busy system administrator with any easy-to-access reference that provides step-by-step instructions on how to install, configure, manage and troubleshoot Communicator across the network. It is the perfect tool for those who simply need to complete a task without reading through lots of theory and principles. . Get Inside Microsoft Office Communications Server 2007 Learn what's new in OCS 2007, compare the previous editions, understand OCS 2007 server roles, plan an OCS 2007 installation. . Install the First OCS 2007 Front-End Server Address the prerequisites, prepare active directory, install and configure OCS 2007 Enterprise Edition, and verify the installation summary. . Configure the Edge Server Install the Edge Server, work with certificates, deal with security issues, and test the Edge Server. . Configure the Mediation Server Install the Configuration Server, configure dialing rules, configure users for voice functionality, and test voice functionality. . Configure Archiving Address compliance requirements, understand archiving topology, and install the Archiving Server. . Configure Conference Servers Understand on-premises conferencing, use on-premises conferencing, understand Microsoft RoundTable, and install conferencing. . Integrate OCS with PBX and IP-PBX Systems Use a gateway, configure Cisco CallManager as a Gateway, and understand CSTA/SIP gateways. . Integrate OCS with Exchange 2007 Unified Messaging Master Exchange 2007 Unified Messaging and architecture, Configure Exchange 2007 UM, and Combine OCS with Exchange 2007 UM. . Upgrade to Office Communications Server 2007 Plan your migration from LCS 2005 to OCS 2007, upgrade perimeter servers, upgrade director servers, upgrade front-end servers, perform user migration, and remove LCS 2005 from the network environment.…
Seller Inventory # INF1000105222
- Title
- How to Cheat at Administering Office Communications Server 2
- Author
- T Piltzecker
- Publisher
- Syngress Media
- Publication year
- 2008
- Condition
- Neu
- Binding
- Soft cover
- Language
- English
- ISBN 10
- 1597492124
- ISBN 13
- 9781597492126
- Item weight
- 992 grams
- Dimensions
- 259x207x39 mm
How to Cheat at Administering Microsoft Office Communicator 2007 provides the busy system administrator with any easy-to-access reference that provides step-by-step instructions on how to install, configure, manage and troubleshoot Communicator across the network. It is the perfect tool for those who simply need to complete a task without reading through lots of theory and principles.
- Get Inside Microsoft Office Communications Server 2007
Learn what’s new in OCS 2007, compare the previous editions, understand OCS 2007 server roles, plan an OCS 2007 installation - Install the First OCS 2007 Front-End Server
Address the prerequisites, prepare active directory, install and configure OCS 2007 Enterprise Edition, and verify the installation summary - Configure the Edge Server
Install the Edge Server, work with certificates, deal with security issues, and test the Edge Server - Configure the Mediation Server
Install the Configuration Server, configure dialing rules, configure users for voice functionality, and test voice functionality - Configure Archiving
Address compliance requirements, understand archiving topology, and install the Archiving Server - Configure Conference Servers
Understand on-premises conferencing, use on-premises conferencing, understand Microsoft RoundTable, and install conferencing - Integrate OCS with PBX and IP-PBX Systems
Use a gateway, configure Cisco CallManager as a Gateway, and understand CSTA/SIP gateways - Integrate OCS with Exchange 2007 Unified Messaging
Master Exchange 2007 Unified Messaging and architecture, Configure Exchange 2007 UM, and Combine OCS with Exchange 2007 UM - Upgrade to Office Communications Server 2007
Plan your migration from LCS 2005 to OCS 2007, upgrade perimeter servers, upgrade director servers, upgrade front-end servers, perform user migration, and remove LCS 2005 from the network environment
"Synopsis" may belong to another edition of this title.
About the Author
"About the title" may belong to another edition of this title.
Shipping rates from Germany to U.S.A.
| Item | 30 to 40 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 54.68 | £ 63.10 |
Payment methods
- Bank Wire Transfer
- Check
- Paypal
Store description
Das Unternehmen AHA-BUCH GmbH: Seit der Gründung von AHA-BUCH im Juli 2005 ist unser Hauptziel, zufriedenen Kunden so schnell und so preisgünstig wie möglich ihren Bücherwunsch zu erfüllen. Unsere Firma beschäftigt 16 Mitarbeiter, die nur ein Ziel kennen: den Kunden und seine Wünsche! Auf über 3700 m2 Fläche haben wir über 100.000 Bücher, Modernes Antiquariat und Spiele auf Lager.
Specialty
Kinderbücher & Kinderhör Casetten, German Books, Software, Natur & Tiere, Ratgeber, Sachbücher, Englische Bücher, Medizin & Gesundheit, Universität & StudiumSeller's business information
AHA-BUCH GmbH
Garlebsen 48
Einbeck, Germany 37574
Terms of sale
Imprint
Seller Info:
AHA-BUCH GmbH
represented by the managing director Christel Glass
Garlebsen 48
37574 Einbeck
Deutschland
Telefon: 055639996039
Telefax: 055639995974
E-Mail: abebooks@aha-buch.de
USt-IdNr.: DE261904229
registered at Commercial register Amtsgerichtes Göttingen
Handelsregisternummer HRB 200691
Alternative dispute resolution:
The European Commission provides a platform for out-of-court online dispute resolution (ODR platform), which can be accessed under https://ec.europa.eu/odr.
We have been a member of the "FairCommerce" initiative since 25.05.2018.
For more information, see www.fair-commerce.de.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to AHA-BUCH GmbH, Einbeck, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.