Ccnp Building Scalable Internetworks Bsci 642-901 Lab Portfolio
Kotfila, David; Moorhouse, Joshua; Wolfson, Ross G.
Language: English
Published by Cisco Systems, 2007
- Softcover
- Used

Seller: HPB-Red, Dallas, TX, U.S.A.HPB-Red
AbeBooks seller since March 11, 2019
Condition: Used - Good
£ 12.16
Quantity: 1 available
Add to basketItem description from seller
Seller Inventory # S_363838810
- Title
- Ccnp Building Scalable Internetworks Bsci 642-901 Lab Portfolio
- Author
- Kotfila, David; Moorhouse, Joshua; Wolfson, Ross G.
- Publisher
- Cisco Systems
- Publication year
- 2007
- Condition
- Good
- Binding
- paperback
- Language
- English
- ISBN 10
- 1587132133
- ISBN 13
- 9781587132131
CCNP Building Scalable Internetworks (BSCI 642-901) Lab Portfolio provides you with opportunities for hands-on practice to master the technologies necessary to configure advanced routing on a production network.
The labs reinforce your understanding of how to install, configure, monitor, and troubleshoot network infrastructure equipment. You will apply your knowledge of configuration of EIGRP, OSPF, IS-IS, and BGP routing protocols and how to manipulate and optimize routing updates between these protocols. Other topics covered include multicast routing, IPv6, and DHCP configuration.
Those preparing for the Building Scalable Cisco Internetworks (BSCI 642-901) certification exam should work through this book cover-to-cover. Or if you need to quickly review configuration examples, you can go directly to the relevant chapter.
CCNP Building Scalable Internetworks (BSCI 642-901) Lab Portfolio includes
- 33 Labs built to support v5 of the Building Scalable Internetworks course within the Cisco® Networking Academy® curriculum providing ample opportunity to practice.
- 6 Challenge and Troubleshooting Labs have been added to the Lab Portfolio to further test your mastery of the topics.
- 4 Case Studies provide practice in planning, designing, and implementing EIGRP, OSPF, and BGP networks. Even if you do not have the actual equipment to configure these more complex topologies, it is worth reading through these labs to expand your thinking into more complex networking solutions.
By successfully completing the exercises in this book you will gain the experience necessary to use advanced IP addressing and routing in implementing scalability for Cisco integrated services routers (ISR) connected to LANs and WANs.
"Synopsis" may belong to another edition of this title.
About the Author
David Kotfila, CCNP, CCAI, is the Director of the Cisco Academy at Rensselaer PolytechnicInstitute (RPI), Troy, New York. Under his direction, 350 students have received their CCNA, 150 studentshave received their CCNP, and 8 students have obtained their CCIE. David is a consultant forCisco, working as a member of the CCNP assessment group. His team at RPI has authored the fournew CCNP lab books for the Academy program. David has served on the National Advisory Council for the Academy program for four years. Previously he was the Senior Training Manager at PSINet, a Tier 1 global Internet service provider.
Joshua Moorhouse, CCNP, recently graduated from Rensselaer Polytechnic Institute (RPI) with a B.S. in Computer Science, where he also worked as a teaching assistant in the Cisco Networking Academy. He currently works as a network engineer at Factset Research Systems in Norwalk, Connecticut.
Ross Wolfson, CCIE No. 16696, recently graduated from Rensselaer Polytechnic Institute (RPI) with a B.S. in Computer Science. He currently works as a network engineer at Factset Research Systems.
"About the title" may belong to another edition of this title.
Shipping rates within U.S.A.
| Item | 4 to 14 business days | 2 to 6 business days |
|---|---|---|
| First item | £ 2.77 | £ 5.17 |
Payment methods
Store description
Specialty
AllSeller's business information
Half Price Books, Records, Magazines, Inc.
5803 E. Northwest Hwy.
Dallas, TX U.S.A. 75231
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to HPB-Red, Carrollton, Texas, U.S.A., +1 800-883-2114, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.