Carbon-Neutral Architectural Design
Pablo M. La Roche (Cal Poly Pomona, USA)
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: Over 20 available
Add to basketCondition: New
Quantity: Over 20 available
Add to basketPablo M. La Roche is Professor of Architecture at California State Polytechnic University, where he was also interim Director of the Lyle Center for Regenerative Studies in the College of Environmental Design. For many years, he was a Principal an.
Seller Inventory # 3236057050
The energy used to build and operate buildings is a significant source of greenhouse gas emissions. While it is possible to reduce emissions through low-carbon design, many architects are not trained to do this. Filling an urgent need for a design reference in this emerging field, this book describes how to reduce building-related greenhouse gas emissions through appropriate design techniques. It presents strategies to achieve CO2 reductions, with an emphasis on control of energy flows through the building envelope and passive cooling and heating strategies. This new, revised edition is updated throughout and includes a new section on embodied carbon and new chapters on daylighting and nature-based cooling.
Features:
Pablo M. La Roche is Professor of Architecture at California State Polytechnic University, where he was also interim Director of the Lyle Center for Regenerative Studies in the College of Environmental Design. For many years, he was a Principal and Sustainable Design Director at CallisonRTKL and is currently a Principal and Sustainable Design Services Director at Arcadis. Dr. La Roche has more than 30 years of professional experience implementing sustainable, low-carbon strategies in multiple projects of all sizes. La Roche earned an Architecture degree at Universidad del Zulia, Venezuela, and a Master of Science in Architecture with a Scholarship from CONICIT, the Venezuelan Council for the Advancement of Science. With a Fulbright from the US Department of State and a Chancellor’s Scholarship from UCLA, he earned a Ph.D. degree in Architecture at the University of California, Los Angeles, California. His research interests include passive cooling systems, living roofs, and low-energy and low-carbon architecture. He has authored over 150 technical papers in journals and conferences. La Roche co-authored the book, Keeping Cool: Guidelines to Avoid Overheating in Buildings, published by the Passive Low Energy Architecture (PLEA) organization in 2001, Carbon Neutral Architectural Design in 2011 with a second edition in 2017, and several book chapters, including the Routledge Manual on Thermal Comfort and Activism in Architecture: Bright Dreams of Passive Energy Design. He has been a guest speaker at events around the world, a podcast speaker, a member of architecture competition juries, a technical reviewer and session chair in local, regional, and international events and conferences, and an editorial board member of several journals. These include the American Institute of Architecture (AIA), the Passive and Low Energy Architecture Association (PLEA), the Architectural Research Centers Consortium (ARCC), the US Green Building Council (USGBC), and American Solar Energy Society (ASES) conferences, and in 2016, he chaired the Passive Low Energy Architecture (PLEA) conference in Los Angeles. In 2013, he was Co‑Curator of the exhibit “Technology and Environment: The Postwar House in Southern California” at Cal Poly Pomona, part of the Getty series Pacific Standard Time. He is also the past president of the Society of Building Science Educators (SBSE) and past chair of the solar buildings division of the ASES. He is a registered architect in Venezuela and an Associate AIA and Leadership in Energy and Environmental Design (LEED) BD+C accredited professional in the United States. He has received multiple awards, among these “Habitar el Dispositivo” in Spain, the Volunteer IMPACT Award from the USGBC and the EDUCATE Prize in Rome in 2012, the National Council of Architectural Registration Boards (NCARB) Grand Prize representing the Department of Architecture at Cal Poly Pomona in 2008, the exhibit “New Blood: Next Gen” in the A+D Architectural Museum in Los Angeles, California in 2006, a finalist in the 2016 Biennale Land Art Generator Initiative design competition for Santa Monica, and with CRTKL an AIALA NextLA 2021 citation award for terminal II at Guadalajara airport. His carbon‑eutral design studio was selected for Architecture’s 2030 Curriculum Project, and his students have also received awards in architecture competitions over the years, including the COTE Top Ten for Students awards program, sponsored by the AIA and ACSA, AIAS/COTE 2012 Research Scholar, the Pasadena and Foothill Chapter of the AIA, Emerging Green Building Competition, Los Angeles Architectural Awards, AIA Inland Chapter 2009 Awards, the United States Environmental Protection Agency, Leading Edge, and Drylands Exhibit with the A+D museum.
"About this title" may belong to another edition of this title.
Instructions for revocation/
Standard Business Terms and customer information/ data protection declaration
Revocation right for consumers
(A ?consumer? is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within one month without specifying any reasons.
The revocation period is one month...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to moluna, Greven, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
II. Kundeninformationen
Moluna GmbH
Engberdingdamm 27
48268 Greven
Deutschland
Telefon: 02571/5698933
E-Mail: abe@moluna.de
Wir sind nicht bereit und nicht verpflichtet, an Streitbeilegungsverfahren vor Verbraucherschlichtungsstellen teilzunehmen.
Die technischen Schritte zum Vertragsschluss, der Vertragsschluss selbst und die Korrekturmöglichkeiten erfolgen nach Maßgabe der Regelungen "Zustandekommen des Vertrages" unserer Allgemeinen Geschäftsbedingungen (Teil I.).
3.1. Vertragssprache ist deutsch .
3.2. Der vollständige Vertragstext wird von uns nicht gespeichert. Vor Absenden der Bestellung können die Vertragsdaten über die Druckfunktion des Browsers ausgedruckt oder elektronisch gesichert werden. Nach Zugang der Bestellung bei uns werden die Bestelldaten, die gesetzlich vorgeschriebenen Informationen bei Fernabsatzverträgen und die Allgemeinen Geschäftsbedingungen nochmals per E-Mail an Sie übersandt.
Die wesentlichen Merkmale der Ware und/oder Dienstleistung finden sich im jeweiligen Angebot.
5.1. Die in den jeweiligen Angeboten angeführten Preise sowie die Versandkosten stellen Gesamtpreise dar. Sie beinhalten alle Preisbestandteile einschließlich aller anfallenden Steuern.
5.2. Die anfallenden Versandkosten sind nicht im Kaufpreis enthalten. Sie sind über eine entsprechend bezeichnete Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot aufrufbar, werden im Laufe des Bestellvorganges gesondert ausgewiesen und sind von Ihnen zusätzlich zu tragen, soweit nicht die versandkostenfreie Lieferung zugesagt ist.
5.3. Die Ihnen zur Verfügung stehenden Zahlungsarten sind unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot ausgewiesen.
5.4. Soweit bei den einzelnen Zahlungsarten nicht anders angegeben, sind die Zahlungsansprüche aus dem geschlossenen Vertrag sofort zur Zahlung fällig.
6.1. Die Lieferbedingungen, der Liefertermin sowie gegebenenfalls bestehende Lieferbeschränkungen finden sich unter einer entsprechend bezeichneten Schaltfläche auf unserer Internetpräsenz oder im jeweiligen Angebot.
Soweit im jeweiligen Angebot oder unter der entsprechend bezeichneten Schaltfläche keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Tagen nach Vertragsschluss (bei vereinbarter Vorauszahlung jedoch erst nach dem Zeitpunkt Ihrer Zahlungsanweisung).
6.2. Soweit Sie Verbraucher sind ist gesetzlich geregelt, dass die Gefahr des zufälligen Untergangs und der zufälligen Verschlechterung der verkauften Sache während der Versendung erst mit der Übergabe der Ware an Sie übergeht, unabhängig davon, ob die Versendung versichert oder unversichert erfolgt. Dies gilt nicht, wenn Sie eigenständig ein nicht vom Unternehmer benanntes Transportunternehmen oder eine sonst zur Ausführung der Versendung bestimmte Person beauftragt haben.
Sind Sie Unternehmer, erfolgt die Lieferung und Versendung auf Ihre Gefahr.
Die Mängelhaftung richtet sich nach der Regelung "Gewährleistung" in unseren Allgemeinen Geschäftsbedingungen (Teil I).
letzte Aktualisierung: 23.10.2019
| Order quantity | 26 to 60 business days | 26 to 60 business days |
|---|---|---|
| First item | £ 41.80 | £ 41.80 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.