COMBUSTION FOR POWER GENERATION AND TRANSPORTATION:TECHNOLOGY, CHALLENGES AND PROSPECTS
0
Sold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Hardcover
Condition: New
Quantity: 1 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 1 available
Add to basketNew. US edition. Expediting shipping for all USA and Europe orders excluding PO Box. Excellent Customer Service.
Seller Inventory # ABEOCT25-269649
Prof. Avinash Kumar Agarwal: Prof. Avinash Kumar Agarwal joined IIT Kanpur in 2001. Prof. Agarwal was at ERC, University of Wisconsin, Madison, USA as a Post-Doctoral Fellow (1999 – 2001). His areas of interest are IC engines, combustion, alternative fuels, hydrogen, conventional fuels, lubricating oil tribology, optical diagnostics, laser ignition, HCCI, emission and particulate control, and large bore engines. Prof. Agarwal has published more than 200 peer reviewed international journal and conference papers. He is associate editor of ASME Journal of Energy Resources Technology, and International Journal of Vehicle Systems Modelling and Testing. He has edited “Handbook of Combustion” (5 Volumes; 3168 pages), published by Wiley VCH, Germany. Prof. Agarwal is a Fellow of SAE (2012), Fellow of ASME (2013) and a Fellow of INAE (2015). Prof. Agarwal is the recipient of Prestigious Shanti Swarup Bhatnagar Prize-2016 in Engineering Sciences.
Dr. Santanu De: Dr. Santanu De is Assistant Professor in the Department of Mechanical Engineering, IIT Kanpur since December 2014. He received a Bachelor of Engineering degree from the North Bengal University in 2002, and an M. Tech. from IIT Kanpur in 2004, both in Mechanical Engineering. He received his PhD in Aerospace Engineering from IISc, Bangalore in 2012. Prior to joining IIT Kanpur, he served for two years at MTU as a postdoctoral research associate, and one year at the University of Stuttgart. His primary areas of research are numerical modeling of turbulent combustion, spray atomization and combustion, coal gasification and combustion. He is Associate Editor for the ‘Journal of Energy, Environment and Sustainability’.
Professor Ashok Pandey: Professor Ashok Pandey is Eminent Scientist at the Center of Innovative and Applied Bioprocessing, Mohali. His major research interests are in the areas of microbial, enzyme and bioprocess technology. He has to his credit over 1150publications/communications, including 16 patents, 50+ books, 140 book chapters, 423 original and review papers, an h index of 78 and ~ 25,000 Goggle Scholar citations. Professor Pandey is the recipient of several fellowships such as the Fellowships of Royal Society of Biology (UK), Academician of European Academy of Sciences and Arts, Germany; ISEES; National Academy of Science (India); BRSI; and awards such as Thomson Scientific India Citation Laureate Award, USA; UNESCO Professor; Raman Research Fellowship Award, CSIR; and GBF, Germany. Prof Pandey is Editor-in-chief of Bioresource Technology, Honorary Executive Advisor of Journal of Water Sustainability and Journal of Energy and Environmental Sustainability, Subject editor of Proceedings of National Academy of Sciences (India) and serves on the editorial board of several other journals.
Dr. Akhilendra Pratap Singh: Dr. Akhilendra Pratap Singh is a CSIR Pool Scientist at Indian Institute of Technology Kanpur. He received his Masters and PhD in Mechanical Engineering from Indian Institute of Technology Kanpur, India in 2010 and 2016 respectively. His areas of research include advanced low temperature combustion; optical diagnostics with special reference to engine endoscopy and PIV; combustion diagnostics; engine emissions measurement; particulate characterization and their control; and alternative fuels. Dr. Singh has published 15 peer reviewed international journal papers and 6 peer reviewed international and national conference papers. He is a member of numerous professional societies, including SAE, ASME, and ISEES. He is a member of the editorial board of the ‘Journal of Energy, Environment and Sustainability’."About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can cancel the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
INFORMATION REGARDING THE RIGHT OF CANCELLATION
Statutory Right to cancel
You have the right to cancel this contract within 14 days without giving any reason.
The cancellation period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the the last good or the last lot or piece.
To exercise the right to cancel, you must inform us, Basi6 International, 1944 Lantana Ln, 75063, Irving, Texas, U.S.A., 1 2144998944, of your decision to cancel this contract by a clear statement (e.g. a letter sent by post, fax or e-mail). You may use the attached model cancellation form, but it is not obligatory. You can also electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". If you use this option, we will communicate to you an acknowledgement of receipt of such a cancellation on a durable medium (e.g. by e-mail) without delay.
To meet the cancellation deadline, it is sufficient for you to send your communication concerning your exercise of the right to cancel before the cancellation period has expired.
Effects of cancellation
If you cancel this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to cancel with contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to us or Basi6 International, 1944 Lantana Ln, 75063, Irving, Texas, U.S.A., 1 2144998944, without undue delay and in any event not later than 14 days from the day on which you communicate your cancellation from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of cancellation
The right of cancellation does not apply to:
Model withdrawal form
(complete and return this form only if you wish to withdraw from the contract)
To: (Basi6 International, 1944 Lantana Ln, 75063, Irving, Texas, U.S.A., 1 2144998944)
I/We (*) hereby give notice that I/We (*) withdraw from my/our (*) contract of sale of the following goods (*)/for the provision of the following goods (*)/for the provision of the following service (*),
Ordered on (*)/received on (*)
Name of consumer(s)
Address of consumer(s)
Signature of consumer(s) (only if this form is notified on paper)
Date
* Delete as appropriate.
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days | 
|---|---|---|
| First item | £ 0.00 | £ 0.00 | 
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.