Building Sites
Davies, Matt
Sold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
New - Soft cover
Condition: New
Ships within U.S.A.
Quantity: 1 available
Add to basketSold by Basi6 International, Irving, TX, U.S.A.
AbeBooks Seller since 24 June 2016
Condition: New
Quantity: 1 available
Add to basketNew. US edition. Expediting shipping for all USA and Europe orders excluding PO Box. Excellent Customer Service.
Seller Inventory # ABEOCT25-316506
Building Sites addresses the urgent need to advance the critical understanding of relations between architectural design and the labour of building. While recognising that in many parts of the world building takes place through self-organised processes and traditional skills, the book questions a central and problematic omission in architectural discourse, education and practice – the production of buildings and the erasure of construction labour entailed by that omission. Through its engagement with the groundbreaking work of the architect and theorist Sérgio Ferro, who developed a history of architecture ‘seen from the building site’, the book sets out a programme for a new field of Production Studies for architecture and other disciplines.
First, the field requires careful research into the production of the built environment – at the construction site, in the factory, in the design office and beyond. This volume explores historical and contemporary cases from Brazil, the UK, Yugoslavia, Germany, India, Mexico and the USA. Second, the book asks why the disciplinary silencing of production prevails. In Ferro’s view, the tendency of architectural discourse to ignore issues of labour and processes of construction is no mere oversight but rather a structural necessity for maintaining the profession’s capacity to act ‘on’ and ‘over’ the building site, a necessity arising organically from the development of capitalism. Turning also to Morris, Harvey, Chakrabarty and Malm, the collection provides the first sustained English-language engagement with Ferro’s theories and critiques. Chapters on radical pedagogies, unions and political alliances, and alternative forms of building take the third step – to respond to contemporary crises. Production Studies must mobilise its understanding to seek alternatives and work towards change.
Matt Davies is Reader in International Political Economy at Newcastle University (UK) and Professor Visitante at the International Relations Institute of the Pontifícia Universidade Católica do Rio de Janeiro (Brazil). His work has engaged with cultural imperialism, precarity and unprotected workers in the international political economy, and popular culture and world politics. His current research focuses on urbanism and cities as spaces of world politics.
Will Thomson is an anthropologist and interdisciplinary researcher at Newcastle University, where he was a postdoctoral researcher for the Translating Ferro/Transforming Knowledge (TF/TK) project. He received his PhD from New York University in socio-cultural anthropology. His ethnographic fieldwork has focused on Chinese migrant construction labour and the global building industry.
Katie Lloyd Thomas is Professor of Theory and History of Architecture at Newcastle University and a founding member of the feminist collective taking place www.takingplace.org.uk. Her research is concerned with materiality, labour and technology, as in her most recent publication Building Materials: Material Theory and the Architectural Specification (2021).
João Marcos de Almeida Lopes is Full Professor and Director of the Institute of Architecture and Urbanism – IAUUSP (2024–2028) of the University of São Paulo. He is a member of the Housing and Sustainability Research Group (HABIS). He was a Principal Investigator of Translating Ferro/Transforming Knowledge (TF/TK). He is the author of Geodesics and Co., with Vitor Amaral Lotufo (1981) and of Engineering Architectures or Architecture Engineering, with Marta Bogéa and Yopanan C. P. Rebello (2006). He is the author of several articles on popular housing, construction technologies and construction history. He is one of the founders of the USINA – Work Centre for the Inhabited Environment, where he remains as an associate.
"About this title" may belong to another edition of this title.
Professional Book Seller shipping from Multiple Locations Worldwide for fastest delivery possible!
If you are a consumer you can cancel the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
INFORMATION REGARDING THE RIGHT OF CANCELLATION
Statutory Right to cancel
You have the right to cancel this contract within 14 days without giving any reason.
The cancellation period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the the last good or the last lot or piece.
To exercise the right to cancel, you must inform us, Basi6 International, 1944 Lantana Ln, 75063, Irving, Texas, U.S.A., 1 2144998944, of your decision to cancel this contract by a clear statement (e.g. a letter sent by post, fax or e-mail). You may use the attached model cancellation form, but it is not obligatory. You can also electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". If you use this option, we will communicate to you an acknowledgement of receipt of such a cancellation on a durable medium (e.g. by e-mail) without delay.
To meet the cancellation deadline, it is sufficient for you to send your communication concerning your exercise of the right to cancel before the cancellation period has expired.
Effects of cancellation
If you cancel this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to cancel with contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to us or Basi6 International, 1944 Lantana Ln, 75063, Irving, Texas, U.S.A., 1 2144998944, without undue delay and in any event not later than 14 days from the day on which you communicate your cancellation from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of cancellation
The right of cancellation does not apply to:
Model withdrawal form
(complete and return this form only if you wish to withdraw from the contract)
To: (Basi6 International, 1944 Lantana Ln, 75063, Irving, Texas, U.S.A., 1 2144998944)
I/We (*) hereby give notice that I/We (*) withdraw from my/our (*) contract of sale of the following goods (*)/for the provision of the following goods (*)/for the provision of the following service (*),
Ordered on (*)/received on (*)
Name of consumer(s)
Address of consumer(s)
Signature of consumer(s) (only if this form is notified on paper)
Date
* Delete as appropriate.
All orders shipped via FedEx or DHL and delivered to your doorstep within 3-5 days. We do not ship to P.O.Boxes and a proper street address must be provided to avoid any delays.
| Order quantity | 5 to 14 business days | 3 to 6 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.