Building with Paper : Architecture and Construction
Ulrich Knaack
Sold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
New - Hardcover
Condition: New
Ships from Germany to U.S.A.
Quantity: 1 available
Add to basketSold by AHA-BUCH GmbH, Einbeck, Germany
AbeBooks Seller since 14 August 2006
Condition: New
Quantity: 1 available
Add to basketNeuware - Paper and cardboard as sustainable building materials are currently the subject of research and testing. They can be produced inexpensively, are made from renewable raw materials and are completely recyclable. The focus of their application is on temporary uses, such as for transitional schools, emergency shelters or 'microhomes'. Properly protected from moisture and fire, the material proves to be durable. Design and aesthetic qualities are by no means neglected, as case studies by Pritzker Prize winner Shigeru Ban demonstrate: the Chengdu Elementary School, the Paper Concert Hall in Aquila or the Cardboard Cathedral in Christchurch all provided a sign of hope after devastating earthquakes. This introduction explains the technology of building with cardboard and paper and shows a wide range of examples. ; Das natürliche Material Papier und Pappe ist derzeit Gegenstand der Forschung und Erprobung in der Baupraxis. Es ist kostengünstig herstellbar, besteht aus nachwachsendem Rohstoff und ist gut rezyklierbar. Der Schwerpunkt der Verwendung liegt dabei auf der temporären Nutzung, etwa in Übergangsbauten für Schulen, Notunterkünfte oder 'Microhomes'. Richtig vor Nässe und Feuer geschützt, erweist sich das Material als sehr haltbar. Und der architektonische Anspruch kommt dabei keineswegs zu kurz, wie Beispiele von Pritzker-Preisträger Shigeru Ban zeigen: die Grundschule Chengdu, die Paper Concert Hall in Aquila oder die Cardboard Cathedral in Christchurch waren jeweils ein Zeichen der Hoffnung nach verheerenden Erdbeben. Die Einführung erklärt die Grundlagen des Bauens mit Papier und zeigt spannende Anwendungen.
Seller Inventory # 9783035621532
Professor Dr.-Ing. Ulrich Knaack, Professor für Konstruktion und Entwurf an der TU Delft sowie Professor für Fassadentechnik an der TU Darmstadt
Dr.-Ing. Rebecca Bach arbeitete als wissenschaftliche Mitarbeiterin für „Paper Construction and Design“ an der TU Darmstadt. Projektleiterin Bauphysik und Nachhaltigkeit bei Kempen Krause Ingenieure
Professor Dr.-Ing. Samuel Schabel, Professor für Papiertechnik im Fachbereich Maschinenbau der TU Darmstadt
Professor Dr.-Ing. Ulrich Knaack, Professor of Design of Construction at Delft University of Technology and Professor of Facade Structures at the Technical University Darmstadt
Dr.-Ing. Rebecca Bach, research group leader for “Paper Construction and Design” at Technical University Darmstadt, project manager for building physics and sustainability at Kempen Krause Ingenieure
Professor Dr.-Ing. Samuel Schabel, Professor of Paper Technology in the Department of Mechanical Engineering at Technical University Darmstadt
"About this title" may belong to another edition of this title.
General Terms and Conditions and Customer Information / Privacy Policy
I. General Terms and Conditions
§ 1 Basic provisions
(1) The following terms and conditions apply to all contracts that you conclude with us as a provider (AHA-BUCH GmbH) via the Internet platforms AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of any of your own terms and conditions used by you will be objected to
(2) A consumer within the meaning of the following regulations is any natural person who concludes...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to AHA-BUCH GmbH, Einbeck, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
We ship your order after we received them
for articles on hand latest 24 hours,
for articles with overnight supply latest 48 hours.
In case we need to order an article from our supplier our dispatch time depends on the reception date of the articles, but the articles will be shipped on the same day.
Our goal is to send the ordered articles in the fastest, but also most efficient and secure way to our customers.
| Order quantity | 7 to 10 business days | 5 to 7 business days |
|---|---|---|
| First item | £ 26.14 | £ 26.14 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.