Building Engineering and Systems Design
Frederick S. Merritt
Sold by buchversandmimpf2000, Emtmannsberg, BAYE, Germany
AbeBooks Seller since 23 January 2017
New - Soft cover
Condition: New
Quantity: 2 available
Add to basketSold by buchversandmimpf2000, Emtmannsberg, BAYE, Germany
AbeBooks Seller since 23 January 2017
Condition: New
Quantity: 2 available
Add to basketNeuware -1. New Directions in Building Design.- 1.1. Change from Master Builders to Managers.- 1.2. Basic Traditional Building Procedure.- 1.3. Systems Design Approach to Building.- 1.4. Design by Building Team.- 2. Basic Building Elements and Their Representation.- 2.1. Main Parts of Buildings.- 2.2. Floors and Ceilings.- 2.3. Roofs.- 2.4. Exterior Walls and Openings.- 2.5. Partitions, Doors, and Interior-Wall Finishes.- 2.6. Structural Framing and Foundations.- 2.7. Plumbing.- 2.8. Heating, Ventilating, and Air Conditioning (HVAC) Systems.- 2.9. Lighting.- 2.10. Acoustics.- 2.11. Electric Supply.- 2.12. Vertical-Circulation Elements.- 2.13. Why Drawings Are Necessary.- 2.14. Drawing Conventions.- 2.15. Types of Drawings.- 2.16. Specifications.- 2.17. Scales and Dimensions on Drawings.- 2.18. Elevation Views.- 2.19. Plan Views.- 2.20. Lines.- 2.21. Sections.- 2.22. Details.- 2.23. Survey and Plot Plans.- 3. Systems Design Method.- 3.1. Models.- 3.2. Value Measures for Comparisons 643.3. Comparisons of Systems.- 3.4. Return on Investment.- 3.5. Constraints Imposed by Building Codes.- 3.6. Zoning Codes.- 3.7. Other Constraining Regulations.- 3.8. Systems Design Steps.- 3.9. System Goals.- 3.10. System Objectives.- 3.11. System Constraints.- 3.12. Value Analysis.- 3.13. Optimum Design of Complex Systems.- 4. Application of Systems Design to Buildings.- 4.1. Considerations in Adaptation of Systems Design.- 4.2. Role of Owner.- 4.3. Conceptual Phase of Systems Design.- 4.4. Design Development Phase of Systems Design.- 5. Contract Documents and Construction Methods.- 5.1. Responsibilities Assigned by the Construction Contract.- 5.2. Components of the Contract Documents.- 5.3. Contract Drawings.- 5.4. Specifications.- 5.5. Bidding Requirements.- 5.6. Contractors Drawings.- 5.7. Construction and Occupancy Permits.- 5.8. Construction Procedures.- 6. Life Safety Concerns.- 6.1. Windstorms.- 6.2. Earthquakes.- 6.3. Fire.- 6.4. Fire Extinguishment.- 6.5. Emergency Egress.- 6.6. Fire Protection.- 6.7. Security.- 6.8. Barrier-Free Environments.- 6.9. Toxic Materials.- 6.10. Construction Safety.- 7. Building Sites and Foundations.- 7.1. Site Considerations.- 7.2. Site Surveys.- 7.3. Soil Considerations for Site and Foundation Design.- 7.4. Shallow Bearing Foundations.- 7.5. Deep Foundations.- 7.6. Lateral and Uplift Forces on Structures.- 7.7. Site Development Considerations 1917.8. Cofferdams and Foundation Walls.- 7.9. Bewatering of Excavations.- 7.10. Investigation and Testing.- 7.11. Systems-Design Approach to Site Adaptation.- 8. Structural Systems.- 8.1. Building Loads.- 8.2. Deformations of Structural Members.- 8.3. Unit Stresses and Strains.- 8.4. Idealization of Structural Materials.- 8.5. Structural Materials.- 8.6. Typical Major Constraints on Structural Systems.- 8.7. Tension Members.- 8.8. Columns.- 8.9. Trusses.- 8.10. Beams.- 8.11. Arches and Rigid Frames.- 8.12. Shells and Folded Plates.- 8.13. Cable-Supported Roofs.- 8.14. Pneumatic Structures.- 8.15. Horizontal Framing Systems.- 8.16. Vertical Structural Systems.- 8.17. Systems-Design Approach to Structural Systems.- 9. Plumbing.- 9.1. Water Supply.- 9.2. Wastewater Disposal.- 9.3. Basic Principles of Plumbing.- 9.4. Water-supply Systems.- 9.5. Sizing of Water-Supply Pipes.- 9.6. Wastewater-Removal Systems.- 9.7. Sizing of Wastewater and Vent Pipes.- 9.8. Piping for Heating Gas.- 9.9. Systems Design of Plumbing.- 10. Heating, Ventilation, and Air Conditioning.- 10.1. Design Considerations.- 10.2. Measurement of Heat.- 10.3. Heat Flow and Human Comfort.- 10.4. Thermal Insulation.- 10.5. Prevention of Damage from Condensation.- 10.6. Ventilation.- 10.7. Heat Losses.- 10.8. Heat Gains.- 10.9. Methods of Heating Buildings.- 10.10. Methods of Cooling and Air Conditioning Buildings.- 10.11. Passive Design.- 10.12. Systems-Design Approach to HVAC.- 11. Lighting.- 11.1. Accident Prevention.- 11.2. Quantity of Light.- 11.3. Quality of Light.- 11.4. Color.- 11.5. Lighting Strategies.
Seller Inventory # 9781475701500
Widerrufsbelehrung/ Muster-Widerrufsformular/
Allgemeine Geschäftsbedingungen und Kundeninformationen/ Datenschutzerklärung
Widerrufsrecht für Verbraucher
(Verbraucher ist jede natürliche Person, die ein Rechtsgeschäft zu Zwecken abschließt, die überwiegend weder ihrer gewerblichen noch ihrer selbstständigen beruflichen Tätigkeit zugerechnet werden können.)
Widerrufsbelehrung
Widerrufsrecht
Sie haben das Recht, binnen 14 Tagen ohne Angabe von Gründen diesen Vertrag zu widerrufen.
Die Widerrufsfr...
Soweit in der Artikelbeschreibung keine andere Frist angegeben ist, erfolgt die Lieferung der Ware innerhalb von 3-5 Werktagen nach Vertragsschluss, bei Vorauszahlung erst nach Eingang des vollständigen Kaufpreises und der Versandkosten. Alle Preise inkl. MwSt.