Bridge Safety, Maintenance and Management in a Life-cycle Context
Language: English
Published by CRC Pr I Llc, 2022
- Hardcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 266.99
Quantity: 2 available
Add to basketItem description from seller
284 pages. 9.19x6.13x0.69 inches. In Stock.
Seller Inventory # x-1032052813
- Title
- Bridge Safety, Maintenance and Management in a Life-cycle Context
- Author
- Frangopol, Dan M./ Kim, Sunyong
- Publisher
- CRC Pr I Llc
- Publication year
- 2022
- Condition
- Brand New
- Binding
- Hardcover
- Language
- English
- ISBN 10
- 1032052813
- ISBN 13
- 9781032052816
- Item weight
- 0.73 kilograms
During the past two decades, it has been generally acknowledged that
- life-cycle bridge analysis can be a systematic tool to address efficient and effective bridge management under uncertainty
- life-cycle management at the bridge network level can lead to an improvement in the allocation of limited financial resources, ensuring the safety and functionality of the bridge network
- life-cycle management of bridges and bridge networks based on resilience and sustainability can improve their resistance and robustness to extreme events such as earthquakes, tsunamis, floods, and hurricanes
- bridge management should consider the impact of environmental conditions and climate change
This book addresses important concepts and approaches developed recently on bridge safety, maintenance, and management in a life-cycle context. Bridge life-cycle performance and cost analysis, prediction, optimization, and decision making under uncertainty are discussed. The major topics include bridge safety and service life prediction; bridge inspection and structural health monitoring; bridge maintenance; life-cycle bridge and bridge network management; optimum life-cycle bridge management planning; resilience and sustainability of bridges and bridge networksunder hazards; and bridge management considering climate change. By providing practical applications of the presented concepts and approaches, this book can help students, researchers, practitioners, infrastructure owners and managers, and transportation officials to build up their knowledge of life-cycle bridge performance and cost management at bothproject level and network level under various deteriorating mechanisms, hazards and climate change effects.
"Synopsis" may belong to another edition of this title.
About the Author
Dr. Dan M. Frangopol is the inaugural holder of the Fazlur R. Khan Endowed Chair of Structural Engineering and Architecture at Lehigh University. He is widely recognized as a pioneer in the field of life-cycle engineering. His main research interests are in the development and application of probabilistic concepts and methods to civil and marine structures under various types of hazards. Dr. Frangopol is the Founding President of both the International Association for Bridge Maintenance and Safety (IABMAS) and the International Association for Life-Cycle Civil Engineering (IALCCE). He is the Founder and Editor-in-Chief of Structure and Infrastructure Engineering, an international peer-reviewed journal launched in 2005. His research and professional service have garnered numerous awards from ASCE, IABSE, IASSAR, ISHMII and other professional organizations. Dr. Frangopol has authored/coauthored 3 books, 60 book chapters, and over 420 articles in peer-reviewed journals, including 11 award-winning papers. He holds 4 honorary doctorates and 14 honorary professorships. He is a member of the National Academy of Construction of the United States, a foreign member of the Academy of Europe (London), a foreign associate of the Engineering Academy of Japan, a foreign member of the Royal Academy of Belgium, an honorary member of the Romanian Academy, an honorary member of the Romanian Academy of Technical Sciences, and a distinguished member of ASCE.
Dr. Sunyong Kim is Associate Professor at the Department of Civil and Environmental Engineering at Wonkwang University, South Korea. He obtained his undergraduate degree in 1999 at Yonsei University, South Korea, and his M.S. Degree in 2004 at KAIST. Under the supervision of Prof. Dan. M. Frangopol, he received a Ph.D. in Structural Engineering in 2011 from Lehigh University. Dr. Kim has authored/coauthored a book, written 36 journal articles, 6 book chapters, and 35 conference papers. He is the recipient of the 2014 ASCE J. James R. Croes Medal, the 2014 IABMAS Junior Prize, and the 2018 IALCCE Junior Award.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 12.50 | £ 25.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.