Bridge Design, Assessment and Monitoring
Sold by Biblios, Frankfurt am main, HESSE, Germany
AbeBooks Seller since 10 September 2024
New - Soft cover
Condition: New
Ships from Germany to U.S.A.
Quantity: 3 available
Add to basketSold by Biblios, Frankfurt am main, HESSE, Germany
AbeBooks Seller since 10 September 2024
Condition: New
Quantity: 3 available
Add to basketBridges play important role in modern infrastructural system. This book provides an up-to-date overview of the field of bridge engineering, as well as the recent significant contributions to the process of making rational decisions in bridge design, assessment and monitoring and resources optimization deployment for the purpose of enhancing the welfare of society.
Tang specifies the purposes and requirements of the conceptual bridge design, considering bridge types, basic elements, structural systems and load conditions. Cremona and Poulin propose an assessment procedure for existing bridges. Kallias et al. develop a framework for the performance assessment of metallic bridges under atmospheric exposure by integrating coating deterioration and corrosion modelling. Soriano et al. employ a simplified approach to estimate the maximum traffic load effect on a highway bridge and compare the results with other approaches based on on-site weigh-in-motion data. Akiyama et al. propose a method for reliability-based durability design and service life assessment of reinforced concrete deck slab of jetty structures. Chen et al. propose a meso-scale model to simulate the uniform and pitting corrosion of rebar in concrete and to obtain the crack patterns of the concrete with different rebar arrangements. Ruan et al. present a traffic load model for long span multi-pylon cable- stayed bridges. Khuc and Catbas implement a non-target vision- based method for the measurement of both static and dynamic displacements time histories. Finally, Cruz presents the career of the outstanding bridge engineer Edgar Cardoso in the fields of bridge design and experimental analysis.
The book serves as a valuable reference to all concerned with bridge structure and infrastructure systems, including students, researchers, engineers, consultants and contractors from all areas sections of bridge engineering.
The chapters originally published as a special issue in Structure and Infrastructure Engineering.
Airong Chen is Professor in the Department of Bridge Engineering, at Tongji University, China.
Dan M. Frangopol is the inaugural holder of the Fazlur R. Khan Endowed Chair of Structural Engineering and Architecture at Lehigh University, USA. His research, teaching and service have garnered numerous awards from ASCE, IASSAR, IABSE, SAE and other professional organizations. Professor Frangopol is the Founding Editor of Structure and Infrastructure Engineering and the founder of the Computational Laboratory for Life-cycle Structural Engineering at Lehigh University.
Xin Ruan is in the Department of Bridge Engineering, at Tongji University, China.
"About this title" may belong to another edition of this title.
If you are a consumer you can cancel the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
INFORMATION REGARDING THE RIGHT OF CANCELLATION
Statutory Right to cancel
You have the right to cancel this contract within 14 days for any reason.
The cancellation period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the the last good or the last lot or piece.
To exercise the right to cancel, you must inform us, Biblios, 47 Kaisetstrasse, 60329, frankfurt am main, hessen, Germany, of your decision to cancel this contract by a clear statement (e.g. a letter sent by post, fax or e-mail). You may use the attached model cancellation form, but it is not obligatory. You can also electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". If you use this option, we will communicate to you an acknowledgement of receipt of such a cancellation on a durable medium (e.g. by e-mail) without delay.
To meet the cancellation deadline, it is sufficient for you to send your communication concerning your exercise of the right to cancel before the cancellation period has expired.
Effects of cancellation
If you cancel this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to cancel with contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to us or Biblios, 47 Kaisetstrasse, 60329, frankfurt am main, Germany, without undue delay and in any event not later than 14 days from the day on which you communicate your cancellation from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of cancellation
The right of cancellation does not apply to:
Model withdrawal form
(complete and return this form only if you wish to withdraw from the contract)
To: (Biblios, 47 Kaisetstrasse, 60329, frankfurt am main, hessen, Germany)
I/We (*) hereby give notice that I/We (*) withdraw from my/our (*) contract of sale of the following goods (*)/for the provision of the following goods (*)/for the provision of the following service (*),
Ordered on (*)/received on (*)
Name of consumer(s)
Address of consumer(s)
Signature of consumer(s) (only if this form is notified on paper)
Date
* Delete as appropriate.
| Order quantity | 25 to 45 business days | 8 to 14 business days |
|---|---|---|
| First item | £ 8.63 | £ 16.23 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.