Bond Failure Mechanism of Fully Grouted Rock Bolts
Language: English
Published by Springer Nature, 2023
Series: Book 285 of 472 - SpringerBriefs in Applied Sciences and Technology
- Softcover
- New

Seller: Revaluation Books, Exeter, United KingdomRevaluation Books
AbeBooks seller since January 6, 2003
Condition: New
£ 45.71
Quantity: 2 available
Add to basketItem description from seller
119 pages. 9.25x6.10x0.47 inches. In Stock.
Seller Inventory # x-9819905001
- Title
- Bond Failure Mechanism of Fully Grouted Rock Bolts
- Author
- Chen, Jianhang/ Li, Yongliang/ Zhang, Junwen
- Publisher
- Springer Nature
- Publication year
- 2023
- Condition
- Brand New
- Binding
- Paperback
- Language
- English
- ISBN 10
- 9819905001
- ISBN 13
- 9789819905003
- Item weight
- 0.25 kilograms
- Series
- Book 285 of 472: SpringerBriefs in Applied Sciences and Technology
The purpose of writing this book is to provide the latest research findings in ground control techniques in mining engineering, especially the rock bolting techniques. Since rock bolts are widely used in mining engineering and civil engineering, they are significant in guaranteeing the safety of underground openings. However, instability issues still occur with the rock bolting technique. Therefore, it is valuable to understand the exact load transfer mechanism of rock bolts. This book summarised the recent research work regarding rock bolting conducted by the authors. It is valuable for the readers to fully understand the reinforcing mechanism of fully grouted rock bolts.
This book focuses on the bond failure mode of fully grouted rock bolts, which is the most widely encountered failure mode in rock bolting. Different investigation approaches are used in this book, including numerical simulation, analytical modelling and experimental tests. Therefore, this bookconducts a comprehensive study to reveal the bond failure process of fully grouted rock bolts. Moreover, it reveals the corresponding bond failure mechanism. Therefore, it helps the reads to fully understand the bond failure mechanism of rock bolting. Moreover, it helps the readers to develop new approaches and methods to prevent failure of the rock bolting system.
This is an open access book.
"Synopsis" may belong to another edition of this title.
About the Author
Jianhang CHEN got his bachelor degree in Mining Engineering from the China University of Mining and Technology. In 2012, he got the financial support provided by the China Scholarship Council and started his PhD at the University of New South Wales, Australia. In 2016, he got his PhD degree in Australia. After that, he started working as an academic staff in the China University of Mining and Technology (Beijing). In 2020, he was promoted as an Associate Professor.
His research interests include the ground control techniques in mining engineering and the corresponding rock bolting mechanism. As the first author, he published 25 academic papers. Among them, 20 academic papers are indexed in the Web of Science. Moreover, 9 academic papers are published in the JCR Q1 ranking journals, such as the Tunnelling and Underground Space Technology, International Journal of Mining Science and Technology, Construction and Building Materials. Two academic papers were listed as the Highly Cited Papers by the Essential Science Indicators. One is the paper of "Numerical simulation of fully encapsulated rock bolts with a tri-linear constitutive relation" which was published in Tunnelling and Underground Space Technology. The other is the paper of "Analytical studying the axial performance of fully encapsulated rock bolts" which was published in Engineering Failure Analysis. As the principal, he is hosting four national grants supported by the China government.
"About the title" may belong to another edition of this title.
Revaluation Books
Exeter, United Kingdom
AbeBooks seller since January 6, 2003
Shipping rates from United Kingdom to U.S.A.
| Item | 7 to 14 business days | 2 to 3 business days |
|---|---|---|
| First item | £ 10.00 | £ 30.00 |
Payment methods
Seller's business information
Edward Bowditch Ltd
Exstowe, Exton
Exeter, United Kingdom EX3 0PP
Terms of sale
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to Revaluation Books, Hounslow, United Kingdom, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.
Shipping terms
Orders usually dispatched within two working days.