Bolt Torque Chart and Preload Calculation Guide: Fastener Tightening Values and Clamping Force Reference for Safe, Reliable Joints
Language: English
Published by Independently published, 2026
- Softcover
- New

Seller: California Books, Miami, FL, U.S.A.California Books
AbeBooks seller since October 27, 2023
Condition: New
£ 40.14
Quantity: Over 20 available
Add to basketItem description from seller
Print on Demand.
Seller Inventory # I-9798141630071
- Title
- Bolt Torque Chart and Preload Calculation Guide: Fastener Tightening Values and Clamping Force Reference for Safe, Reliable Joints
- Author
- Hoffstadt, Scott J.
- Publisher
- Independently published
- Publication year
- 2026
- Condition
- New
- Binding
- Soft cover
- Language
- English
- ISBN 13
- 9798141630071
Most bolted joints that leak, loosen or crack were tightened to a number. The number came from a chart, and the chart assumed a lubrication state, a thread condition and a grade that the joint on the bench did not have. Change the friction and the same torque can leave a bolt badly under-loaded or close to yield.
Most fastener references stop at a table. Engineering texts go deep on theory but leave the technician without a procedure. Bolt Torque Chart and Preload Calculation Guide joins the two: the tables you need on the job, the variables that decide whether a table value is safe, and the field procedures that make the result repeatable.
Inside, you will find:
- Metric and inch (SAE) torque and preload tables for common property classes and grades, in dry, oiled and moly conditions
- Preload and torque calculations worked step by step in SI and US customary units, from the short-form T = K x D x F to the long-form equation
- K-factor and friction references that show how much clamp force lubrication, coatings and thread condition really change
- Methods beyond torque: torque-to-angle, turn-of-nut, torque-to-yield, hydraulic tensioning and stretch measurement
- Tightening sequences and patterns for multi-bolt joints, flanges and gasketed connections
- Failure analysis and troubleshooting for loosening, relaxation, fatigue, galling, stripping and leaks
- Field-ready tools: worksheets, a torque wrench calibration log, quick-reference cards, unit conversions and a glossary
Written for maintenance technicians, millwrights, mechanics, pipefitters, machinists, quality inspectors and mechanical engineers who tighten, specify or audit bolted joints. It is a practical reference, not a design code: it shows you how to use the controlling standard well, not how to replace it.
Know the force inside the joint, not just the number on the wrench.
"Synopsis" may belong to another edition of this title.
California Books
Miami, FL, U.S.A.
AbeBooks seller since October 27, 2023
Shipping rates within U.S.A.
| Item | 3 to 7 business days | 2 to 5 business days |
|---|---|---|
| First item | £ 2.29 | £ 12.99 |
Payment methods
Store description
We have 20 years experience selling books worldwide! Friendly customer support. Your satisfaction guaranteed!
Specialty
All authorized categoriesSeller's business information
Miramar International Services LLC
FL, U.S.A.
Right of withdrawal
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to California Books, Fort Wayne, Indiana, U.S.A., without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
- The delivery of newspapers, journals or magazines with the exception of subscription contracts; and
- The supply of digital content which is not supplied on a tangible medium (e.g. on a CD or DVD) if you accepted when you placed your order that we could start to deliver it, and that you could not withdraw once delivery had started.