Bayesian Compressive Sensing for Site Characterization
Yu Wang
Sold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
New - Hardcover
Condition: New
Ships within U.S.A.
Quantity: Over 20 available
Add to basketSold by PBShop.store US, Wood Dale, IL, U.S.A.
AbeBooks Seller since 7 April 2005
Condition: New
Quantity: Over 20 available
Add to basketNew Book. Shipped from UK. Established seller since 2000.
Seller Inventory # L2-9781032458090
Site characterization is indispensable to good geotechnical or rock engineering practice as every site is unique, but technical, budget, time, or access constraints typically result in only a tiny fraction of the underground soil and rock in a site being visually inspected, sampled, or tested. This leads to a long- lasting challenge of sparse measurements in geo- sciences and engineering. This book introduces Bayesian compressive sensing or sampling (BCS) as a highly efficient spatial data analytic and simulation method for the efficient modelling of spatial geo- data from sparse measurements, with quantified reliability and uncertainty to further optimize site characterization. It provides the necessary theory and computational tools for setting up and solving a sparse spatial data modeling problem using BCS.
This book suits graduate students, academics, researchers, and engineers interested in site characterization from sparse measurements in geotechnical and rock engineering, and also those modeling other spatially varying phenomena such as air quality data, soil or water pollution data, and meteorological data. This is supplemented with a software called Analytics of Sparse Spatial Data using Bayesian compressive sampling/ sensing and illustrative examples, and enables hands- on experience of spatial data analytics and simulation using sparse measurements.
Yu Wang is Professor of Geotechnical Engineering at the Hong Kong University of Science and Technology, Hong Kong.
Tengyuan Zhao is Associate Professor of Geotechnical and Geological Engineering at Xi’an Jiaotong University, China.
Yue Hu is Humboldt Postdoctoral Fellow at Leibniz Universität Hannover, Germany.
Zheng Guan is Assistant Professor of Geotechnical Risk Assessment and Management at Delft University of Technology in the Netherlands.
Kok-Kwang Phoon is Cheng Tsang Man Chair Professor and President at Singapore University of Technology and Design (SUTD). He has twice won the American Society of Civil Engineers Norman Medal and is founding editor of the journal Georisk.
"About this title" may belong to another edition of this title.
Returns Policy
We ask all customers to contact us for authorisation should they wish to return their order. Orders returned without authorisation may not be credited.
If you wish to return, please contact us within 14 days of receiving your order to obtain authorisation.
Returns requested beyond this time will not be authorised.
Our team will provide full instructions on how to return your order and once received our returns department will process your refund.
Please note the cost to return any...
If you are a consumer you can withdraw from the contract in accordance with the following. Consumer means any natural person who is acting for purposes which are outside his trade, business, craft or profession.
Information regarding the right of withdrawal
Statutory right to withdraw
You have the right to withdraw from this contract within 14 days without giving any reason.
The withdrawal period will expire after 14 days from the day on which you acquire, or a third party other than the carrier and indicated by you acquires, physical possession of the last good or the last lot or piece.
To exercise the right of withdrawal, electronically fill in and submit a clear statement on our website, under "My Purchases" in "My Account". We will communicate to you an acknowledgement of receipt of such a withdrawal on a durable medium (e.g. by e-mail) without delay.
To meet the withdrawal deadline, it is sufficient for you to send your communication concerning your exercise of the right of withdrawal before the withdrawal period has expired.
Effects of withdrawal
If you withdraw from this contract, we will reimburse to you all payments received from you, including the costs of delivery (except for the supplementary costs arising if you chose a type of delivery other than the least expensive type of standard delivery offered by us).
We may make a deduction from the reimbursement for loss in value of any goods supplied, if the loss is the result of unnecessary handling by you.
We will make the reimbursement without undue delay, and not later than 14 days after the day on which we are informed about your decision to withdraw from this contract.
We will make the reimbursement using the same means of payment as you used for the initial transaction, unless you have expressly agreed otherwise; in any event, you will not incur any fees as a result of such reimbursement.
We may withhold reimbursement until we have received the goods back, or you have supplied evidence of having sent back the goods, whichever is the earliest.
You shall send back the goods or hand them over to PBShop.store US, Springfield Gardens, New York, U.S.A., +44 1285 712917, without undue delay and in any event not later than 14 days from the day on which you communicate your withdrawal from this contract to us. The deadline is met if you send back the goods before the period of 14 days has expired. You will have to bear the direct cost of returning the goods. You are only liable for any diminished value of the goods resulting from the handling other than what is necessary to establish the nature, characteristics and functioning of the goods.
Exceptions to the right of withdrawal
The right of withdrawal does not apply to:
Books are shipped from our US or UK warehouses. Delivery estimates allow for delivery from either location.
| Order quantity | 7 to 14 business days | 7 to 14 business days |
|---|---|---|
| First item | £ 0.00 | £ 0.00 |
Delivery times are set by sellers and vary by carrier and location. Orders passing through Customs may face delays and buyers are responsible for any associated duties or fees. Sellers may contact you regarding additional charges to cover any increased costs to ship your items.